Registration lapsed No litigation declared Residential / Group Housing project

KAKA CLASSIC

By VIDYA BUILDCON

RG-MH-37685 · RERA P52100048939 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 50%
9 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

KAKA CLASSIC is a Residential / Group Housing project by VIDYA BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100048939 on 24 Jan 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 7 of the 16 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameKAKA CLASSIC
  • TypeResidential / Group Housing
  • Location
    • KALEWADI RAHATANI ROAD
    • RAHATANI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048939
  • ReraGenie IDRG-MH-37685

Builder

  • NameVIDYA BUILDCON
  • Entity typePartnership

Key dates

10 months past promisethis monthRegisteredJan 2023First promiseDec 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Jan 2023
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed63 files

Current status

44%7 of 16 units booked
95.6%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAKA CLASSICNA6416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

KAKA CLASSIC: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered12
Open Space8

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area505 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MANOHAR GENU KSHIRSAGARPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI1823.81
Proposed, not sanctioned424 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3 - 8, GROUND FLOOR, F - WING, PREMIER PLAZA, OLD MUMBAI - PUNE HIGHWAY, CHINCHWAD, PUNE - 4
Estimated costRs 1.95 cr
Cost incurredRs 1.87 cr
Work done95.61%
BuildingWingEstimatedIncurred
KAKA CLASSICNARs 1.95 crRs 1.87 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR ATUL RANPISE
EngineerSHAM PATIL
Chartered AccountantYOGESH B KABRA AND CO
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
VIDYA BUILDCON-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024211Dec 2023 → Dec 2025

Reason as filed by the promoterReason for delay is due to Financial Issues. We are unable to start our construction on site. The completion date of project in MahaRERA was 31/12/2023, but we want it changed to a new completion date-31/12/2025, so please accept our request and make changes in your records.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Jun 2025.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1_Sep 2025.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1_Dec 2025.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Jun 2025.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Sep 2025.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Dec 2025.pdf24 Jun 2026
Withdrawal Update Form 3File: CA Certificate_Jun 2025.pdf24 Jun 2026
Withdrawal Update Form 3File: 5CA Certificate_Sep 2025.pdf24 Jun 2026
Withdrawal Update Form 3File: 6CA Certificate_Dec 2025.pdf24 Jun 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf21 Jul 2024
Declaration in FORM BFile: Form B.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf13 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 2023-24.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 FY 2023-24.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY 2023-24.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3(OCT 23 DEC 23).pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA FROM 5.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a cer 1 (1).pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - KAKA CLASIC (1).pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KAKA CLASSIC C A CERIFICATE 1 (1).pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05-01-2023 CA Certificate.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (5).pdf11 Jan 2023
Details of encumbrances concerned to FinanceFile: 05-01-2023 No Encu Finance.pdf10 Jan 2023
Details of encumbrances concerned to FinanceFile: 05-01-2023 No Encumbra Legal.pdf10 Jan 2023
Details of encumbrances concerned to LegalFile: 05-01-2023 No Encu Finance.pdf10 Jan 2023
Details of encumbrances concerned to LegalFile: 05-01-2023 No Encumbra Legal.pdf10 Jan 2023
CERSAI detailsFile: 05-01-2023 Cersai Undertaking.pdf10 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200257246588_For_Asset_Based_Search_10_01_2023_19_10_29_284.pdf10 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 05-01-2023 Separate Bank Account.pdf10 Jan 2023
Proforma of Agreement for saleFile: Copy of Drafts.pdf6 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf5 Dec 2022
Declaration in FORM BFile: kaka classic.pdf19 Nov 2022
Layout approvalFile: Blue Print 2nd Floor.pdf12 Nov 2022
Building plan approvalFile: Blue Print1st floor.pdf12 Nov 2022
PAN CardFile: FIRM PAN CARD.pdf12 Nov 2022
Copy of the legal title reportFile: Search Report New 2022.pdf12 Nov 2022
Copy of Layout Approval (in case of layout)File: Blue Print 2nd Floor.pdf12 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Blue Print1st floor.pdf12 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed_page-0001.pdf12 Nov 2022
Declaration about Commencement CertificateFile: CC DECLARATION CERTIFICATE.pdf12 Nov 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf12 Nov 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf12 Nov 2022
Deviation Report with respect to Allotment letterFile: DEV FOR AL.pdf12 Nov 2022
Deviation Report with respect to model copy of AgreementFile: DEV FOR AFS.pdf12 Nov 2022

How this compares with Pune

44%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAKA CLASSIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAHATANI13,700+ in Pune

2 kmKAKA CLASSICCompleted 72Lapsed / revoked 45Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 253 registered projects within 2 km.

Builder: VIDYA BUILDCON

VIDYA BUILDCON has 1 registration on MahaRERA, including KAKA CLASSIC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that KAKA CLASSIC shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KAKA CLASSIC is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAKA CLASSIC?

The registered promoter entity is VIDYA BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAKA CLASSIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KAKA CLASSIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAKA CLASSIC?

The professionals named in the filing: Architect: AR ATUL RANPISE; Engineer: SHAM PATIL; Chartered Accountant: YOGESH B KABRA AND CO; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAKA CLASSIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAKA CLASSIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAKA CLASSIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.