ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / KAHAN JASH RESIDENCY

Registered No litigation declared Residential / Group Housing project

KAHAN JASH RESIDENCY

By MEHTA ASSOCIATES

RG-MH-85645 · RERA P51800003109 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 96 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 96 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
6 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

KAHAN JASH RESIDENCY is a Residential / Group Housing project by MEHTA ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003109 on 4 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 24 of the 30 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameKAHAN JASH RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • M A MEHTA
    • GHATKOPAR WEST
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003109
  • ReraGenie IDRG-MH-85645

Builder

  • NameMEHTA ASSOCIATES
  • Entity typePartnership
  • PartnersKETAN JASVANTLAL SHAH, ANIL MANEKLAL MEHTA

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed78 files

Current status

80%24 of 30 units booked
100.0%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
kahan jash residency b wingNA9830030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

kahan jash residency b wing: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered21
Open Space12

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,957 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Anil mehtaGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI2376.84
Proposed, not sanctioned2,377 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchaxis bank , sakinaka junction, sakinaka,mumbai 400072
Estimated costRs 6.20 cr
Cost incurredRs 6.20 cr
Work done100.0%
BuildingWingEstimatedIncurred
kahan jash residency b wingNARs 5.45 crRs 5.45 cr
-NARs 75.00 lakhRs 75.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHEMANT KARANI
EngineerPARAS CONSULTANTS
Chartered AccountantKETAN RUPANI&CO
Chartered AccountantMs P R Vora And Associates
Chartered AccountantH M Shah And Associates
PartnerRole in project
MEHTA ASSOCIATES-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005126Dec 2019 → Jun 2020

Reason as filed by the promoterAS WE ARE IN PROCESS OF COMPLYING ALL CONDITION REQUIRED FOR OCCUPATION CERTIFICATE AND TO GET OCCUPATION CERTIFICATE WILL BE NEEDED EXTENSION OF TIME FOR SIX MONTHS.

EXT51800008790Dec 2019 → Jun 2021

Reason as filed by the promoterDue to COVID situation we are facing problem of skilled labour strength on site. However project is almost completed, we need time to complete MCGM Formalities for Occupation Certificate.

EXT51800010098Dec 2019 → Jun 2023

Reason as filed by the promoterDue to Pandemic situation we need more time to complete O.C Compliances. , Project construction is Completed .

EXT51800019013Dec 2019 → Dec 2025

Reason as filed by the promoterIN 2021 MCGM DENY RELEASING O.C DUE TO NAVY MATERIAL ORGANIZATION (MO) NOT RELEASING NOC , EVEN AFTER FEW PRESENTATION REGARDING OUR PLOT IS OUT OF 500 MT. BUFFER ZONE, FULL CC OBTAINED IN 2019 AND WORK COMPLETED OF THE PROJECT ALONG WITH ELECTRICITY & WATER CONNECTION, GAS PIPE CONNECTION IN ALL THE FLATS, AWAITING FOR MCGM TO GRANT US OC..

EA29122519112Dec 2019 → Dec 2027

Reason as filed by the promoterNo NOC has been issued from Naval Authority and the OC remains pending. We request you to please refer the enclosed letter fro the detailed explaination.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - FY 2025-26_signed copy.pdf26 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 - FY 2025-26.pdf26 Jun 2026
Withdrawal Update Form 1File: 1_Form 1 - Q3 FY 2025-26.pdf25 Jun 2026
Withdrawal Update Form 1File: 1_Form 1 - Q3 FY 2025-26.pdf25 Jun 2026
Withdrawal Update Form 1File: 1_Form 1 - Q4 FY 2025-26.pdf25 Jun 2026
Withdrawal Update Form 2File: 2_Form 2 - Q3 FY 2025-26.pdf25 Jun 2026
Withdrawal Update Form 2File: 2_Form 2 - Q3 FY 2025-26.pdf25 Jun 2026
Withdrawal Update Form 2File: 2_Form 2 - Q4 FY 2025-26.pdf25 Jun 2026
Withdrawal Update Form 3File: 3_Form 3 - Q3 FY 2025-26.pdf25 Jun 2026
Withdrawal Update Form 3File: 3_Form 3 - Q3 FY 2025-26.pdf25 Jun 2026
Withdrawal Update Form 3File: 3_Form 3 -Q4 - FY 2025-26.pdf25 Jun 2026
Form 1File: Form 1 March.pdf29 Dec 2025
Form 2File: 01 Form 2 March 2025.pdf29 Dec 2025
Form 3File: 01 Form 3 march 25.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold March 2025 .pdf29 Dec 2025
Withdrawal Update Form 1File: form 1 September .pdf29 Dec 2025
Withdrawal Update Form 1File: form 1 September .pdf29 Dec 2025
Withdrawal Update Form 1File: Form 1 June.pdf29 Dec 2025
Withdrawal Update Form 2File: 03 Form 2 September 2025.pdf29 Dec 2025
Withdrawal Update Form 2File: 03 Form 2 September 2025.pdf29 Dec 2025
Withdrawal Update Form 2File: 02 Form 2 June 2025.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 september 25.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 september 25.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 june 25.pdf29 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf27 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A 2025.pdf26 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MAHARERA FORM 5.pdf19 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf7 Feb 2025
Certificates of CA (Form 3)File: form 3 .pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KJR RCC_compressed.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: sold inventory2025.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf6 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Adobe Scan 16 Mar 2024_compressed (1).pdf16 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Adobe Scan 16 Mar 2024 (1).pdf16 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA CERTIFICATE 24-02-2024.pdf14 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Site Supervisor.pdf11 Mar 2024
Declaration in FORM BFile: Form B 2024.pdf26 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024.pdf26 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera certificate 484.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold flat inventory.pdf26 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5_final.pdf6 Feb 2024
Certificates of CA (Form 3)File: Form-3 final.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf11 Feb 2023
Certificates of CA (Form 3)File: Signed Form 3.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Form 5.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form5_compressed.pdf13 May 2022
Disclosure of sold/ booked inventoryFile: sold flat declaration.pdf17 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A_compressed.pdf13 Jul 2021
Declaration about Commencement CertificateFile: format D.pdf7 Jul 2021
Disclosure of sold/ booked inventoryFile: sold flat declaration.pdf7 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Mehta Associates.pdf1 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Audit Report Form 5.pdf1 Jul 2021
Declaration about Commencement CertificateFile: Rera certificate 484.pdf29 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera certificate 484.pdf29 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect rera (1).pdf29 Dec 2020
Annual Audit Report of Statutory CA (Form 5)File: Mehta Associates.pdf28 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: FULL CC 6212.pdf22 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Untitled 18_compressed.pdf22 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Untitled 18_compressed.pdf22 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Untitled 18_compressed.pdf22 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Untitled 18_compressed.pdf22 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Untitled 19_compressed.pdf22 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Untitled 19_compressed.pdf22 Jun 2019
Certificates of CA (Form 3)File: CA Certificate-2_compressed.pdf22 Jun 2019
Certificates of CA (Form 3)File: CA Certificate-2_compressed.pdf22 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf24 Apr 2018
Building plan approvalFile: IOD.pdf31 Jul 2017
Layout approvalFile: amendment plans.pdf31 Jul 2017
PAN CardFile: PAN COPY.pdf31 Jul 2017
Copy of the legal title reportFile: title.pdf31 Jul 2017
Details of encumbrancesFile: ENCUM11.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: amendment plans.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Declaration in FORM BFile: FORM B FINAL.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certi.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certi.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA CERTI.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale.pdf31 Jul 2017

How this compares with Mumbai Suburban

80%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 96 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAHAN JASH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR WEST6,700+ in Mumbai Suburban

2 kmKAHAN JASH RESIDENCYCompleted 119Lapsed / revoked 72Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 305 registered projects within 2 km.

Builder: MEHTA ASSOCIATES

MEHTA ASSOCIATES has 1 registration on MahaRERA, including KAHAN JASH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KAHAN JASH RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAHAN JASH RESIDENCY?

The registered promoter entity is MEHTA ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAHAN JASH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KAHAN JASH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAHAN JASH RESIDENCY?

The professionals named in the filing: Architect: HEMANT KARANI; Engineer: PARAS CONSULTANTS; Chartered Accountant: KETAN RUPANI&CO; Chartered Accountant: Ms P R Vora And Associates; Chartered Accountant: H M Shah And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAHAN JASH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAHAN JASH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAHAN JASH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.