K L VALERIA

By K L HOUSING LLP

RG-MH-48949 · RERA P51800050591 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 25.00 crore secured on the land, in favour of ICICI HOME FINANCE COMPANY LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
12 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

K L VALERIA is a Others project by K L HOUSING LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050591 on 21 Apr 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 12 months from the original filing. 4 of the 16 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameK L VALERIA
  • TypeOthers
  • Location
    • JUHU TARA ROAD
    • SANTACRUZ WEST
    • Juhu
    • Andheri
    • Mumbai Suburban
    • 400049
  • Pincode400049
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050591
  • ReraGenie IDRG-MH-48949

Builder

  • NameK L HOUSING LLP
  • Entity typeOthers
  • PartnersKARMYOGI DYEING PRIVATE LIMITED KARMYOGI DYEING PRIVATE LIMITED, SUDAKSHINA TRADING PRIVATE LIMITED SUDAKSHINA TRADING PRIVATE LIMITED
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

1 months past promisethis monthRegisteredApr 2023First promiseSep 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed83 files

Current status

25%4 of 16 units booked
88.2%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
K L VALERIANA13015116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

K L VALERIA: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area657 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofICICI HOME FINANCE COMPANY LIMITED
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on7 Jul 2025
LandownerVillageDistrict
THE LIDO JUHU CO-OPERATIVE HOUSING SOCIETYAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1806.64
Proposed, not sanctioned1,807 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSV ROAD KHAR WEST
Estimated costRs 20.30 cr
Cost incurredRs 17.89 cr
Work done88.15%
BuildingWingEstimatedIncurred
K L VALERIANARs 20.30 crRs 17.89 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHIM KHATRI
EngineerFURKHAN PETIWALA
EngineerSuhail Siddique
Chartered AccountantRashida Kapasi
PartnerRole in project
K L HOUSING LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05082502307Sep 2025 → Sep 2026

Reason as filed by the promoterThe need for extension arises due to unforeseen delays in the correction of the plot area, caused by discrepancies between various official records including the TP Remarks, PRC, and City Survey Plan. Detailed Explanatory Note along with supporting documents are attached

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1.pdf17 Jul 2026
Withdrawal Update Form 2File: Form - 2 Engineer.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jul 2026
Withdrawal Update Form 1File: Architect Certificate.pdf30 Apr 2026
Withdrawal Update Form 2File: Form - 2 Engineer K L Valeria.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf31 Jan 2026
Withdrawal Update Form 2File: Form - 2 Engineer K L Valeria (2).pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 Final K L Valeria Qtr 3.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1 Archtect Certificate K L Valeria.pdf13 Oct 2025
Withdrawal Update Form 2File: Form - 2 Engineer K L Valeria (1).pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3 K L Valeria 30-09-2025.pdf13 Oct 2025
Withdrawal Update Form 1File: FOrm 1 Rera.pdf2 Aug 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf2 Aug 2025
Withdrawal Update Form 3File: Form 3 Final K L Valeria.pdf2 Aug 2025
Building plan approvalFile: New Amend IOD.pdf8 Jul 2025
Building plan approvalFile: New Approved Drawing 1.pdf8 Jul 2025
Building plan approvalFile: New Approved Drawing 2.pdf8 Jul 2025
Building plan approvalFile: New Approved Drawing 3.pdf8 Jul 2025
Building plan approvalFile: New Approved Drawing 4.pdf8 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate K L Valeria.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA K L Valeria (1).PDF18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer K L Valeria (1).pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality certificate K L Valeria.pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- K L Valeria.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- K L Valeria.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate K L Valeria_compressed.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer K L Valeria.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality certificate - Site supervisor K L Valeria.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1- Architect certificate.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 K L Valeria Final.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 K L Valeria.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer K L Valeria.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality certificate - Site supervisor K L Valeria.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final K L Valeria.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2024
Details of encumbrances concerned to FinanceFile: K L Housing LLP- Encumberance certificate.pdf19 Mar 2024
Details of encumbrances concerned to LegalFile: K L Housing LLP- Encumberance certificate.pdf19 Mar 2024
Details of encumbrances concerned to FinanceFile: K L Valeria Encumbarance declaration.pdf28 Feb 2024
Details of encumbrances concerned to LegalFile: K L Valeria Encumbarance declaration.pdf28 Feb 2024
Proforma of Agreement for saleFile: ReRa Agreement - ICICI.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 K L Valeria.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 K L Valeria.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Dec 23.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 K L Valeria Dec 23.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 K L valeria.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 K L Valeria.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A K L Valeria.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 K L Valeria.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K L Valeria FOrm 1.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K L Valeria FOrm 2.pdf18 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: K L Valeria FOrm 2A.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K L Valeria FOrm 3.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate K L Valeria (2)_compressed.pdf13 Apr 2023
Declaration about Commencement CertificateFile: Format D- CC Declaration K L Valeria.pdf11 Apr 2023
Layout approvalFile: Valeria IOD.pdf29 Mar 2023
Building plan approvalFile: BMC Approved Drawing 29-3-2023 --.pdf29 Mar 2023
Copy of Layout Approval (in case of layout)File: Valeria IOD.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: BMC Approved Drawing 29-3-2023 --.pdf29 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- K L Housing - Kishor Lahrani.pdf12 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- K L Housing - Puneet Lahrani.pdf12 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Bank declaration.pdf12 Mar 2023
Copy of the legal title reportFile: RERA LEGAL REPORT.pdf3 Mar 2023
Proforma of Agreement for saleFile: draft Agreement KL Valeria RERA.pdf3 Mar 2023
Deviation Report with respect to Allotment letterFile: No deviation allotment letter KL Valeria.pdf3 Mar 2023
Deviation Report with respect to model copy of AgreementFile: No deviation Agreement letter KL Valeria.pdf3 Mar 2023
PAN CardFile: kl housing llp pan card new.pdf11 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumburance Leter.pdf11 Feb 2023
Details of encumbrances concerned to LegalFile: Encumburance Leter.pdf11 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Meghdoot First CC.pdf11 Feb 2023
Declaration in FORM BFile: form b.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Architect certificate.pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer certifcate.pdf11 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A- Engineer quality Certificate.pdf11 Feb 2023
CERSAI detailsFile: Cersai Letter.pdf11 Feb 2023
Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf11 Feb 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsStatusPromisedDelivered
K L ASTORIAp51800050933C/328 & C/329, 37 MASTER VINAYAK ROAD, BANDRA WEST, Bandra, Andheri, Mumbai Suburban, 400050, MAHARASHTRA-OngoingDec 2025Not delivered
VIENA3RD ROAD KHAR WEST MUMBAI 40005220CompletedNov 2015Nov 2015
K L MEHRISEGUJAR LANE SANTACRUZ WEST24CompletedApr 2015Apr 2015
K L ACCOLADESTREET NO 51 6TH ROAD SANTACRUZ EAST MUMBAI 40005527CompletedJan 2014Jan 2014

How this compares with Mumbai Suburban

25%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K L VALERIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANTACRUZ WEST6,700+ in Mumbai Suburban

2 kmK L VALERIALapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: K L HOUSING LLP

K L HOUSING LLP has 4 registrations on MahaRERA, including K L REGALIA and VELKAR RESIDENCY. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if K L VALERIA is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K L VALERIA?

The registered promoter entity is K L HOUSING LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K L VALERIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for K L VALERIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at K L VALERIA?

The professionals named in the filing: Architect: ASHIM KHATRI; Engineer: FURKHAN PETIWALA; Engineer: Suhail Siddique; Chartered Accountant: Rashida Kapasi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K L VALERIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K L VALERIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K L VALERIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.