Home / Browse projects / Raigarh, Maharashtra / K K RESIDENCY
K K RESIDENCY
RG-MH-28757 · RERA P52000027162 · Last updated on MahaRERA portal: 14 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 27 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
K K RESIDENCY is a Residential / Group Housing project by SHREE SAI HOME MAKERS in Raigarh, Maharashtra, registered with MahaRERA as P52000027162 on 20 Nov 2020. Possession is promised by 31 Dec 2028. The completion date has moved by 27 months from the original filing. 21 of the 142 units on this registration are recorded sold or booked, and 22 of 55 construction stages are filed complete.
At a glance
Project
- NameK K RESIDENCY
- TypeResidential / Group Housing
- Location
- KOPROLI
- PANVEL
- Raigarh
- 410208
- Pincode410208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000027162
- ReraGenie IDRG-MH-28757
Builder
- NameSHREE SAI HOME MAKERS
- Entity typePartnership
- GSTIN27ACCFS1196D1Z7
- PartnersDILIP KASHINATH MHATRE, SHEETAL KISHOR MHATRE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Nov 2020
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Sep 2026)
- Buildings5 building records
- Documents filed141 files
Current status
Figures as on 14 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 WING A | NA | 5 | 5 | 29 | 13 | 42 |
| BUILDING NO 1 WING B | NA | 5 | 5 | 28 | 0 | 28 |
| BUILDING NO 1 WING C | NA | 5 | 5 | 30 | 0 | 30 |
| BUILDING NO 2 WING D | NA | 5 | 5 | 24 | 0 | 24 |
| BUILDING NO 2 WING E | NA | 5 | 5 | 18 | 0 | 18 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 92%.
BUILDING NO 1 WING A68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 48% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 92% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 9% |
BUILDING NO 1 WING B64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 92% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 9% |
BUILDING NO 1 WING C61%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 12% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 68% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 9% |
BUILDING NO 2 WING D30%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 9% |
BUILDING NO 2 WING E30%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 9% |
Progress on shared amenities15
As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership22
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BHAGYASHREE VIRENDRA KARANDIKAR | Koproli | Raigarh |
| RAJESH GOTIRAM TODEKAR | Kharghar | Raigarh |
| PRABHAKAR BALKRISHNA KARANDIKAR | Panvel | Raigarh |
| KRISHNAKUMAR M SHAH | Koproli | Raigarh |
| ATUL MOHANLAL SHAH | Koproli | Raigarh |
| VISHWAJIT VINAYAK KARANDIKAR | Koproli | Raigarh |
| SANTOSH BHAGA SHID | Koproli | Raigarh |
| TAI BHAGA SHID | Koproli | Raigarh |
| RAGINI ARUN INGALHALIKAR | Pune (M Corp.) | Pune |
| SUCHITA SAMARTH JOGLEKAR | Karjat | Raigarh |
| SHRIRAM VISHNU JOGLEKAR | Thane (M Corp.) | Thane |
| AMBADAS RAMCHANDRA DHOTRE | Koproli | Raigarh |
| KISAN GANPAT PAWAR | Panvel | Raigarh |
| RAJESH PRAKASH PATIL | Panvel | Raigarh |
| NIRANJAN VASANT BARVE | Mumbai City | Mumbai City |
| MEENA MAHESH SHAH | Koproli | Raigarh |
| SUNANDA NIVRUTTI KASHID | Pune (M Corp.) | Pune |
| MAHENDRA GOTIRAM TODEKAR | Kharghar | Raigarh |
| KAMLESH VASANT BARVE | Mumbai City | Mumbai City |
| SHRIPAD DHONDU PARANJAPE | Pune (M Corp.) | Pune |
| DHANESH SHRIRAM JOGLEKAR | Thane (M Corp.) | Thane |
| SUDESH SHRIRAM JOGLEKAR | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 1 WING C | NA | Rs 2.65 cr | Rs 2.13 cr |
| BUILDING NO 1 WING A | NA | Rs 2.40 cr | Rs 2.21 cr |
| BUILDING NO 1 WING B | NA | Rs 2.37 cr | Rs 1.93 cr |
| BUILDING NO 2 WING D | NA | Rs 1.87 cr | Rs 10.00 lakh |
| BUILDING NO 2 WING E | NA | Rs 1.79 cr | Rs 9.60 lakh |
| - | NA | Rs 66.40 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DESTINATION ARCHITECTURE INTERIOR DESIGNS |
| Engineer | SAMARTH AGARWAL AGARWAL |
| Engineer | KIRAN SURESH SABLE |
| Chartered Accountant | L K DEDHIA & CO |
| Chartered Accountant | R V THAKKAR & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHREE SAI HOME MAKERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe construction progress of the project has been severely impacted due to an acute shortage of skilled and unskilled labour available at the project site.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Nov 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Nov 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed141
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 JUN 26.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 JUN 26.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 JUN 26.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1 MAR 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 26.pdf | 25 Jun 2026 |
| Form 2A (FY 2020-2021)File: FORM 2A 21.pdf | 28 May 2026 |
| Form 2A (FY 2021-2022)File: FORM 2A 22.pdf | 28 May 2026 |
| Form 2A (FY 2022-2023)File: FORM 2A 23.pdf | 28 May 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A 24.pdf | 28 May 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A 25.pdf | 28 May 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A 26.pdf | 28 May 2026 |
| Form 5 (FY 2022-2023)File: MARCH 2023.pdf | 28 May 2026 |
| Form 5 (FY 2023-2024)File: MARCH 2024.pdf | 28 May 2026 |
| Form 5 (FY 2024-2025)File: MARCH 2025.pdf | 28 May 2026 |
| Form 5 (FY 2025-2026)File: MARCH 2026.pdf | 28 May 2026 |
| Form 5 (FY 2020-2021)File: MARCH 2021.pdf | 25 May 2026 |
| Form 5 (FY 2021-2022)File: MARCH 2022.pdf | 25 May 2026 |
| Form 1File: FORM 1 JUN 21.pdf | 12 May 2026 |
| Form 2File: FORM 2 JUN 21.pdf | 12 May 2026 |
| Form 3File: FORM 3 JUN 21.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 21.pdf | 12 May 2026 |
| Self-declaration of Quarterly ProgressFile: FORM 3 JUN 21.pdf | 12 May 2026 |
| Form 1File: FORM 1 JUN 22.pdf | 12 May 2026 |
| Form 2File: FORM 2 JUN 22.pdf | 12 May 2026 |
| Form 3File: FORM 3 JUN 22.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 22.pdf | 12 May 2026 |
| Self-declaration of Quarterly ProgressFile: FORM 3 JUN 22.pdf | 12 May 2026 |
| Form 1File: FORM 1 JUN 23.pdf | 12 May 2026 |
| Form 2File: FORM 2 JUN 23.pdf | 12 May 2026 |
| Form 3File: FORM 3 JUN 23.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 23.pdf | 12 May 2026 |
| Form 1File: FORM 1 JUN 24.pdf | 12 May 2026 |
| Form 2File: FORM 2 JUN 24.pdf | 12 May 2026 |
| Form 3File: FORM 3 JUN 24.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 24.pdf | 12 May 2026 |
| Form 1File: FORM 1 JUN 25.pdf | 12 May 2026 |
| Form 2File: FORM 2 JUN 25.pdf | 12 May 2026 |
| Form 3File: FORM 3 JUN 25.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 25.pdf | 12 May 2026 |
| Form 1File: FORM 1 SEPT 21.pdf | 12 May 2026 |
| Form 2File: FORM 2 SEPT 21.pdf | 12 May 2026 |
| Form 3File: FORM 3 SEPT 21.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 21.pdf | 12 May 2026 |
| Self-declaration of Quarterly ProgressFile: FORM 3 SEPT 21.pdf | 12 May 2026 |
| Form 1File: FORM 1 SEPT 22.pdf | 12 May 2026 |
| Form 2File: FORM 2 SEPT 22.pdf | 12 May 2026 |
| Form 3File: FORM 3 SEPT 22.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 22.pdf | 12 May 2026 |
| Self-declaration of Quarterly ProgressFile: FORM 3 SEPT 22.pdf | 12 May 2026 |
| Form 1File: FORM 1 SEPT 23.pdf | 12 May 2026 |
| Form 2File: FORM 2 SEPT 23.pdf | 12 May 2026 |
| Form 3File: FORM 3 SEPT 23.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 23.pdf | 12 May 2026 |
| Form 1File: FORM 1 SEPT 24.pdf | 12 May 2026 |
| Form 2File: FORM 2 SEPT 24.pdf | 12 May 2026 |
| Form 3File: FORM 3 SEPT 24.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 24.pdf | 12 May 2026 |
| Form 1File: FORM 1 SEPT 25.pdf | 12 May 2026 |
| Form 2File: FORM 2 SEPT 25.pdf | 12 May 2026 |
| Form 3File: FORM 3 SEPT 25.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 25.pdf | 12 May 2026 |
| Form 1File: FORM 1 DEC 20.pdf | 12 May 2026 |
| Form 2File: FORM 2 DEC 20.pdf | 12 May 2026 |
| Form 3File: FORM 3 DEC 20.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 20.pdf | 12 May 2026 |
| Self-declaration of Quarterly ProgressFile: FORM 3 DEC 20.pdf | 12 May 2026 |
| Form 1File: FORM 1 DEC 21.pdf | 12 May 2026 |
| Form 2File: FORM 2 DEC 21.pdf | 12 May 2026 |
| Form 3File: FORM 3 DEC 21.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 21.pdf | 12 May 2026 |
| Self-declaration of Quarterly ProgressFile: FORM 3 DEC 21.pdf | 12 May 2026 |
| Form 1File: FORM 1 DEC 22.pdf | 12 May 2026 |
| Form 2File: FORM 2 DEC 22.pdf | 12 May 2026 |
| Form 3File: FORM 3 DEC 22.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 22.pdf | 12 May 2026 |
| Form 1File: FORM 1 DEC 23.pdf | 12 May 2026 |
| Form 2File: FORM 2 DEC 23.pdf | 12 May 2026 |
| Form 3File: FORM 3 DEC 23.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 23.pdf | 12 May 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 141 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep K K RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PANVEL5,900+ in Raigarh
Filed coordinates, straight-line distance. 48 registered projects within 2 km.
Plot No -1 Sector -29 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No.-1 Sector -39 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -1 Sector -31 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
SAI SUNCITY PHASE II
Chariot Properties LLP
Plot No. 14 Sector-37 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
ARIHANT ADARSH PHASE I
ARIHANT SUPERSTRUCTURES LIMITED
See every Raigarh project, with the district possession charts
Builder: SHREE SAI HOME MAKERS
SHREE SAI HOME MAKERS has 1 registration on MahaRERA, including K K RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if K K RESIDENCY is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of K K RESIDENCY?
The registered promoter entity is SHREE SAI HOME MAKERS, a partnership as per the filing. Its GSTIN 27ACCFS1196D1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in K K RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for K K RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at K K RESIDENCY?
The professionals named in the filing: Architect: DESTINATION ARCHITECTURE INTERIOR DESIGNS; Engineer: SAMARTH AGARWAL AGARWAL; Engineer: KIRAN SURESH SABLE; Chartered Accountant: L K DEDHIA & CO; Chartered Accountant: R V THAKKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in K K RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback