Home / Browse projects / Mumbai Suburban, Maharashtra / JVM's Shanay Vista

Registered No litigation declared Mixed project

JVM's Shanay Vista

By M/s. JVM Spaces

RG-MH-32515 · RERA PM1180002500091 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 40.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 90%
49 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

JVM's Shanay Vista is a Mixed project by M/s. JVM Spaces in Mumbai Suburban, Maharashtra, registered with MahaRERA as PM1180002500091 on 23 Jun 2025. Possession is promised by 31 Oct 2028. 0 of the 49 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameJVM's Shanay Vista
  • TypeMixed
  • Location
    • JUNCTION OF 90 FEET ROAD AND MG ROAD
    • Nath Pai Nagar
    • Ghatkopar
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1180002500091
  • ReraGenie IDRG-MH-32515

Builder

  • NameM/s. JVM Spaces
  • Entity typePartnership
  • CINU70200MH2016PTC273718
  • PartnersManthan Jitendra Mehta, Nimit Jitendra Mehta
  • Declared earlier projects5 →

Key dates

this monthRegisteredJun 2025PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2025
  • Promised completion31 Oct 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed34 files

Current status

0%0 of 49 units booked
3.0%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JVM's Shanay VistaA Wing14719019
JVM's Shanay VistaB Wing14719019
JVM's Shanay VistaCommercial2201111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 90%.

JVM's Shanay Vista · wing A Wing11%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
JVM's Shanay Vista · wing B Wing11%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
JVM's Shanay Vista · wing Commercial11%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo40%
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered133
BuildingClosed/CoveredTotal
JVM's Shanay Vista A Wing4848
JVM's Shanay Vista B Wing5555
JVM's Shanay Vista Commercial3030

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,297 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Limited
Secured amountRs 40.00 crore
CERSAI search filedYes
Declared on8 Sep 2025
LandownerVillageDistrict
Yashwant CHS LTDGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5329.97
Proposed, not sanctioned5,149 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD ACKRUTI SMC NEAR MSRTC BUS DEPOT POKHRAN ROAD NO1 KHOPAT THANE MAHARASHTRA 400606
Estimated costRs 48.00 cr
Cost incurredRs 1.46 cr
Work done3.05%
BuildingWingEstimatedIncurred
JVM's Shanay VistaB WingRs 24.17 crRs 73.71 lakh
JVM's Shanay VistaA WingRs 21.43 crRs 65.37 lakh
-NARs 2.40 crRs 7.32 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeole Bros
EngineerEpicons Consultants Pvt Ltd
EngineerSK Consultants & Engineers
Chartered AccountantMs Desai and Seth
Chartered AccountantRD SATRA and Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
M/s. JVM Spaces-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2028

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - JVMs Shanay Vista as on Dec 2025.pdf16 May 2026
Withdrawal Update Form 2File: Form 2 - JVMs Shanay Vista as on Dec 2025.pdf16 May 2026
Withdrawal Update Form 3File: Form 3 - JVMs Shanay Vista as on 31-12-2025 final.pdf16 May 2026
Building plan approvalFile: Plan 1- Highlighted.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - JVMs Shanay Vista as on 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 - JVMs Shanay Vista as on 31-03-2026.pdf20 Apr 2026
Building plan approvalFile: Plans - 2.pdf9 Feb 2026
Building plan approvalFile: Plans - 3.pdf9 Feb 2026
Building plan approvalFile: Plans - 4.pdf9 Feb 2026
Building plan approvalFile: Plans - 5.pdf9 Feb 2026
Building plan approvalFile: Plans - 6.pdf9 Feb 2026
Building plan approvalFile: Plans - 7.pdf9 Feb 2026
Building plan approvalFile: Plans - 8.pdf9 Feb 2026
Building plan approvalFile: Plans - 9.pdf9 Feb 2026
Building plan approvalFile: Plans - 10.pdf9 Feb 2026
Building plan approvalFile: Plans - 11.pdf9 Feb 2026
Building plan approvalFile: Plans - 12.pdf9 Feb 2026
Withdrawal Update Form 1File: Form 1 - JVMs Shanay Vista as on Dec 2025.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 - JVMs Shanay Vista as on Sep 2025.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3 - JVMs Shanay Vista as on 30-09-2025.pdf9 Feb 2026
Withdrawal Update Form 1File: Form 1 - JVMs Shanay Vista as on Sep 2025.pdf22 Dec 2025
Withdrawal Update Form 1File: Form 1 - JVMs Shanay Vista as on Sep 2025.pdf22 Dec 2025
Withdrawal Update Form 2File: Form 2 - JVMs Shanay Vista as on Sep 2025.pdf22 Dec 2025
Withdrawal Update Form 2File: Form 2 - JVMs Shanay Vista as on Sep 2025.pdf22 Dec 2025
Withdrawal Update Form 3File: Form 3 - JVMs Shanay Vista as on Sep 2025.pdf22 Dec 2025
Withdrawal Update Form 3File: Form 3 - JVMs Shanay Vista as on 30-09-2025.pdf22 Dec 2025
Withdrawal Update Form 1File: Form 1 - JVMs Shanay Vista as on June 2025.pdf20 Dec 2025
Withdrawal Update Form 2File: Form 2 - JVMs Shanay Vista as on June 2025.pdf20 Dec 2025
Withdrawal Update Form 3File: Form 3 - JVMs Shanay Vista as on June 2025.pdf20 Dec 2025
Declaration and undertaking (Annexure A)File: Annexure A - Declaration - cum - Undertaking.pdf16 Jun 2025
Building plan approvalFile: IOD PLAN 1-4_11zon.pdf12 Jun 2025
Building plan approvalFile: IOD PLAN 5-8_11zon.pdf10 Jun 2025
Building plan approvalFile: IOD PLAN 9-13_11zon.pdf10 Jun 2025

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JVMs EmeraldP51700078908Thane, Thane29Jan 2025OngoingDec 2028Registered original: Dec 2027Not due yet
JVMs Monica GardensP51800052364Vidyalaya Road, Mulund East, Mumbai Suburban55Aug 2023OngoingDec 2026Not due yet
JVMS ClermontP51800046075Mulund West, Mumbai Suburban-Jun 2022CompletedDec 2025Feb 2025
JVMS CORNER STONEP51700024350HARI NIWAS CIRCLE, Thane-Feb 2020CompletedMay 2025Registered original: Nov 2023Apr 2024
JVMS ACCORDP51700029725Thane West, Thane-Jun 2021CompletedMar 2025Feb 2025

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JVM's Shanay Vista on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nath Pai Nagar6,700+ in Mumbai Suburban

2 kmJVM's Shanay VistaCompleted 148Lapsed / revoked 111Other 158Dot size: filed unitsN

Filed coordinates, straight-line distance. 417 registered projects within 2 km.

Builder: M/s. JVM Spaces

M/s. JVM Spaces has 1 registration on MahaRERA, including JVM's Shanay Vista. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JVM's Shanay Vista is delayed beyond 31 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JVM's Shanay Vista?

The registered promoter entity is M/s. JVM Spaces, a partnership as per the filing. Its CIN U70200MH2016PTC273718 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JVM's Shanay Vista?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JVM's Shanay Vista?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JVM's Shanay Vista?

The professionals named in the filing: Architect: Deole Bros; Engineer: Epicons Consultants Pvt Ltd; Engineer: SK Consultants & Engineers; Chartered Accountant: Ms Desai and Seth; Chartered Accountant: RD SATRA and Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JVM's Shanay Vista?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JVM's Shanay Vista. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JVM's Shanay Vista to a free account