Home / Browse projects / Raigarh, Maharashtra / JUPITER ROYAL

Registered No litigation declared Others project

JUPITER ROYAL

By ARJUN ASHOK TARACHANDANI

RG-MH-54061 · RERA P52000048883 · Last updated on MahaRERA portal: 26 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
27 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

JUPITER ROYAL is a Others project by ARJUN ASHOK TARACHANDANI in Raigarh, Maharashtra, registered with MahaRERA as P52000048883 on 24 Jan 2023. Possession is promised by 30 Nov 2026. 12 of the 39 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameJUPITER ROYAL
  • TypeOthers
  • Location
    • PLOT NO 125 SECTOR 24 PUSHPAK VAHAL
    • PUSHPAK VAHAL
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000048883
  • ReraGenie IDRG-MH-54061

Builder

  • NameARJUN ASHOK TARACHANDANI
  • Entity typeIndividual
  • Other registrations6 more →
  • Completed3 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2023PromisedNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion30 Nov 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

31%12 of 39 units booked
83.0%Work done, per cost certificate

Figures as on 26 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JUPITER ROYALNA8735439

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

JUPITER ROYAL: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered8
Open Space39

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area700 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025
LandownerVillageDistrict
JAMIL AKHTAR ABDUL GAFOOR SHAIKHUlaweRaigarh
RABANA NAJMUDDIN SHAIKHGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityCIDCO LTD
Permissible FSI1750.0
Proposed, not sanctioned1,050 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchULWE NAVI MUMBAI 410206
Estimated costRs 2.04 cr
Cost incurredRs 1.69 cr
Work done83.0%
BuildingWingEstimatedIncurred
-NARs 2.04 crRs 1.69 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRECISION ARCHITECTS
EngineerASHOK K PATEL
Chartered AccountantBHAVESH BHANUSHALI AND ASSOCIATES
Chartered AccountantVAISHNAVI R MORAJKAR
Chartered AccountantMAHESH SHETTY & ASSOCIATES
PartnerRole in project
ARJUN ASHOK TARACHANDANI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Jupiter Royal Form 1 Dec 25.pdf26 Apr 2026
Withdrawal Update Form 2File: Form 2 Royal April2026.pdf26 Apr 2026
Withdrawal Update Form 3File: Form 3 Royal March 2026.pdf26 Apr 2026
Withdrawal Update Form 1File: Jupiter Royal Form 1 Dec 25.pdf24 Jan 2026
Withdrawal Update Form 2File: Jupiter Royal Form 2 Dec 25.pdf24 Jan 2026
Withdrawal Update Form 3File: Jupiter royal q3 fy 25-26 form 3.pdf24 Jan 2026
Withdrawal Update Form 1File: Jupiter Royal Form 1 Dec 25.pdf23 Jan 2026
Withdrawal Update Form 2File: Jupiter Royal Form 2 Dec 25.pdf23 Jan 2026
Withdrawal Update Form 3File: Jupiter royal q3 fy 25-26 form 3.pdf23 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 royal.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 J Royal.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Royal Apr25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jupiter royal form 3 Q3 fy 24-25.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOAM 1 125 24 DEC 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Royal Jan25.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 J Royal.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ROYAL FOAM 1 125 10 SEPT 24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2Jupiter Royal oct24.pdf19 Oct 2024
Form 5 (FY 2023-2024)File: Jupiter Royal Form 5.pdf20 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: foam 1 3 july 2024 from architect jupiter royal.pdf21 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Royal July 24.pdf21 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jupiter Royal Form 3 Q1 FY 2024-25 SIGNED SCAN_compressed.pdf21 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 125 24 rera 1 13 april 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jupiter Royal Form 2 125.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jupiter Royal Form3_Q4_FY 2023-24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jupiter Royal Form 3 RERA Q3 FY 2023-24 signed scan.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Plot 125 Q3 (1).pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 125 24 Form 1 Q3.pdf31 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 1.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 2.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 3.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi april.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jupiter Royal_compressed.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FOAM 1 ROYAL 125.pdf15 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jupiter Royal Form 3 RERA Q2 FY 2023-24 signed scan.pdf15 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 22 23.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Certificate.pdf14 Oct 2023
Other - LegalFile: DA-1.pdf2 Oct 2023
Other - LegalFile: DA-2 (1).pdf2 Oct 2023
Other - LegalFile: DA-3 (1).pdf2 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf19 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Jupiter Royal June 2023.pdf19 Sep 2023
Copy of the legal title reportFile: Final Legal Title Report Plot 125.pdf19 Jan 2023
Details of encumbrances concerned to FinanceFile: Finance Onwer.pdf16 Jan 2023
Details of encumbrances concerned to FinanceFile: Finance Promoter.pdf16 Jan 2023
Details of encumbrances concerned to LegalFile: Finance Onwer.pdf16 Jan 2023
Details of encumbrances concerned to LegalFile: Finance Promoter.pdf16 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_compressed.pdf16 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Acc.pdf16 Jan 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf13 Jan 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf13 Jan 2023
PAN CardFile: Pan Card Arjun Tarachandani.pdf13 Jan 2023
PAN CardFile: Jamil Pan aadhar.pdf13 Jan 2023
PAN CardFile: Rabana Pan aadhar.pdf13 Jan 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf13 Jan 2023
Details of encumbrances concerned to FinanceFile: Encum to Legal LO.pdf13 Jan 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf13 Jan 2023
Details of encumbrances concerned to LegalFile: Encum to Legal LO.pdf13 Jan 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf13 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf13 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 125 24 CC.pdf13 Jan 2023
Declaration about Commencement CertificateFile: Declaration CC.pdf13 Jan 2023
Declaration in FORM BFile: 1 Declaration in FORM B.pdf13 Jan 2023
Declaration in FORM BFile: form b Landowners.pdf13 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf13 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf13 Jan 2023
CERSAI detailsFile: 1 CERSAI details.pdf13 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf13 Jan 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf13 Jan 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf13 Jan 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf13 Jan 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf13 Jan 2023
Other - LegalFile: 1 Other - Legal.pdf13 Jan 2023
Other - LegalFile: 3 Other - Legal.pdf13 Jan 2023
Other - LegalFile: 4 Other - Legal.pdf13 Jan 2023

How this compares with Raigarh

31%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JUPITER ROYAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK VAHAL5,900+ in Raigarh

Builder: ARJUN ASHOK TARACHANDANI

ARJUN ASHOK TARACHANDANI has 7 registrations on MahaRERA, including JUPITER SAI SMRUTI and Jupiter Prime. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if JUPITER ROYAL is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JUPITER ROYAL?

The registered promoter entity is ARJUN ASHOK TARACHANDANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JUPITER ROYAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JUPITER ROYAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JUPITER ROYAL?

The professionals named in the filing: Architect: PRECISION ARCHITECTS; Engineer: ASHOK K PATEL; Chartered Accountant: BHAVESH BHANUSHALI AND ASSOCIATES; Chartered Accountant: VAISHNAVI R MORAJKAR; Chartered Accountant: MAHESH SHETTY & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JUPITER ROYAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JUPITER ROYAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JUPITER ROYAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.