Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
138 of 140Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

JP TOWER is a Others project by JP BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100078594 on 27 Dec 2024. Possession is promised by 31 May 2027. 2 of the 140 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameJP TOWER
  • TypeOthers
  • Location
    • Saswad Pargaon Road
    • Saswad
    • Sasvad (M Cl)
    • Purandhar
    • Pune
    • 412301
  • Pincode412301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078594
  • ReraGenie IDRG-MH-23286

Builder

  • NameJP BUILDCON
  • Entity typePartnership
  • PartnersKAILASHKUMAR RAMESHJI PUROHIT, BHAGUJI SURESH JAGTAP, VIKAS KONDIBA JAGTAP, SHUBHANGI JAGTAP

Key dates

this monthRegisteredDec 2024PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2024
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed55 files

Current status

1%2 of 140 units booked
32.4%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JP TOWER BNA8707979
JP TOWER ANA87283361

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

JP TOWER B40%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
JP TOWER A37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed108

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots108
Closed/Covered2
Open Space106
BuildingClosed/CoveredOpen SpaceTotal
JP TOWER B15152
JP TOWER A15556

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,249 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jun 2025
LandownerVillageDistrict
KALPANA SACHIN ZURANGESaswad RuralPune
ANIL ARVIND ZURANGESaswad RuralPune
HRISHIKESH SACHIN ZURANGESaswad RuralPune
HRUTIK SACHIN ZURANGESaswad RuralPune

Approvals and building plan

Sanctioning authoritySASWAD MUNICIPAL COUNCIL
Permissible FSI6008.55
Proposed, not sanctioned6,009 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Gala No. 1534/22, Near Vishwa Niranjan Eye Care Hospital, Market Yard, Saswad, Pune.412301, Maharashtra
Estimated costRs 10.00 cr
Cost incurredRs 3.24 cr
Work done32.37%
BuildingWingEstimatedIncurred
JP TOWER BNARs 4.95 crRs 1.90 cr
JP TOWER ANARs 4.95 crRs 1.34 cr
-NARs 10.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGESH BORHADE
EngineerYOGESH BORHADE
Chartered AccountantSANKET BHNADARI AND ASSOCIATES
Chartered AccountantMAHESH BALAPRASAD INDANI
PartnerRole in project
JP BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Final.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Final Change.pdf24 Apr 2026
Withdrawal Update Form 3File: Form - 3 Final.pdf24 Apr 2026
Withdrawal Update Form 1File: form 1 dec 2025 signed.pdf29 Jan 2026
Withdrawal Update Form 2File: form 2 dec 2025 signed.pdf29 Jan 2026
Withdrawal Update Form 3File: form 3 dec 2025 signed.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1 SCANNED COPY.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 2 SCANNED COPY.pdf3 Nov 2025
Withdrawal Update Form 3File: Form 3 SCANNED COPY.pdf3 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 SIGNED SCAN COPY.pdf30 Sep 2025
Withdrawal Update Form 1File: Form-1 Signed.pdf25 Aug 2025
Withdrawal Update Form 2File: Form-2 Signed.pdf25 Aug 2025
Withdrawal Update Form 3File: Form -3 - June 2025 JP Buildcon.pdf25 Aug 2025
Form 1File: Form 1 dec 2024.pdf12 Jun 2025
Form 2File: Form 2 dec 2024.pdf12 Jun 2025
Form 3File: Form 3 as on 31-12-2024.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclocure of sold Inventory December 2024.pdf12 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Decleration December.pdf12 Jun 2025
Form 1File: Form 1 march 2025.pdf12 Jun 2025
Form 2File: Form 2 - march 2025.pdf12 Jun 2025
Form 3File: Form 3 - march 2025.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclocure of sold Inventory March 2025.pdf12 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Decleration March.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3.pdf6 Dec 2024
Other - LegalFile: Pages from HAKKASODPATRA.pdf6 Dec 2024
Other - LegalFile: Pages from HAKKASODPATRA(1).pdf6 Dec 2024
Other - FinanceFile: FINAL ASR NIL DECLARATION.pdf6 Dec 2024
Other - FinanceFile: BANK DECLARATION LANDOWNER FINAL.pdf28 Nov 2024
Copy of the legal title reportFile: TITILE REPORT_compressed.pdf23 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST BHAGUJI.pdf12 Nov 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES DETAILS.pdf9 Nov 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf9 Nov 2024
CERSAI detailsFile: CERSAI DETAILS.pdf9 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf9 Nov 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCES DETAILS.pdf9 Nov 2024
Other - TechnicalFile: ANNEXURE A.pdf9 Nov 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SELL.pdf9 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST - VIKAS.pdf9 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST KAILASHKUMAR.pdf9 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST SHUBHANGI.pdf9 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf9 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC CLARIFICATION.pdf7 Nov 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF AGREEMENT.pdf18 Oct 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF AGREEMENT.pdf18 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF SECURED AND UNSECURED FINANCE.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Signed.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Signed.pdf18 Jul 2024
Declaration about Commencement CertificateFile: No 08 Format D.pdf18 Jul 2024
Declaration in FORM BFile: Form B JP Buidlcon.pdf24 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Merged CC and NOC.pdf24 Jun 2024
Building plan approvalFile: Signed plan.pdf21 Jun 2024
Layout approvalFile: Signed plan.pdf21 Jun 2024
PAN CardFile: PAN JP BUILDCON.pdf21 Jun 2024
Copy of Layout Approval (in case of layout)File: Signed plan.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Signed plan.pdf21 Jun 2024

How this compares with Pune

1%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JP TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Saswad13,700+ in Pune

2 kmJP TOWERCompleted 12Lapsed / revoked 9Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 42 registered projects within 2 km.

Builder: JP BUILDCON

JP BUILDCON has 1 registration on MahaRERA, including JP TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if JP TOWER is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JP TOWER?

The registered promoter entity is JP BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JP TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JP TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JP TOWER?

The professionals named in the filing: Architect: YOGESH BORHADE; Engineer: YOGESH BORHADE; Chartered Accountant: SANKET BHNADARI AND ASSOCIATES; Chartered Accountant: MAHESH BALAPRASAD INDANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JP TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JP TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JP TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.