Home / Browse projects / Raigarh, Maharashtra / Joy City
Joy City
RG-MH-52267 · RERA P52000017285 · Last updated on MahaRERA portal: 3 Apr 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 2 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Joy City is a Residential / Group Housing project by Prince Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000017285 on 27 Jul 2018. Possession was promised by 29 Dec 2023 and is now 34 months past that date. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameJoy City
- TypeResidential / Group Housing
- Location
- Shedung
- Panvel
- Raigarh
- 410221
- Pincode410221
- RERA no.P52000017285
- ReraGenie IDRG-MH-52267
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Jul 2018
- Promised completion29 Dec 2023
- Revised completionRevised to 29 Dec 2023 (originally 30 Dec 2022)
- Buildings6 building records
- Documents filed67 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 5 | NA | 6 | 0 | 0 | 0 | 0 |
| Building No 4 A AND B WING | NA | 6 | 0 | 0 | 0 | 0 |
| Building no 2 | NA | 6 | 0 | 0 | 0 | 0 |
| Building No 3 | NA | 6 | 0 | 0 | 0 | 0 |
| Building no 1 | NA | 6 | 0 | 0 | 0 | 0 |
| Building No 6 | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 3 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
60 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.
Building No 591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 4 A AND B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed229
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Building No 5 | 0 | 30 | 30 |
| Building No 4 A AND B WING | 75 | 0 | 75 |
| Building no 2 | 1 | 30 | 31 |
| Building No 3 | 1 | 30 | 31 |
| Building no 1 | 1 | 30 | 31 |
| Building No 6 | 1 | 30 | 31 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AN ARCH |
| Chartered Accountant | NAVIN PODAR AND CO |
| Partner | Role in project |
|---|---|
| Prince Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to a change in DP rules of MSRDC, the authority has issued a letter that there will be a delay in issuing OC from their end. Therefore we would request to please grant us an extension till 29.12.2023
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000261963 | Ronak Kishan Bharda | PRINCE DEVELOPERS | 18/07/2022 |
| CC12501559 | MRANAL SURENDRA MANDHANE | Prince Developers | 12/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5 prince.pdf | 3 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LEGAL TITLE TO LAND.pdf | 31 Jan 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE LEGAL TITLE TO LAND.pdf | 31 Jan 2023 |
| Declaration about Commencement CertificateFile: FORMAT D -CC Decleration.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate -31-12-2021.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate -31-12-2021.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30-06-2022.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31-03-2022.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30-09-2022.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31-12-2022.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer 31-03-2021.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer 30-06-2021.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer 30-09-2021.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer 31-12-2021.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer 31-03-2022.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer 30-06-2022.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer 30-09-2022.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer 31-12-2022.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 CA.pdf | 31 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate Builder Lotus-3.pdf | 31 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate Builder Lotus-2.pdf | 31 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Certificate Builder Lotus-1.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31-03-2019.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31-03-2020.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30-06-2021.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30-09-2021.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31-12-2021.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31-03-2022.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30-06-2022.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31-12-2020.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30-09-2022.pdf | 31 Jan 2023 |
| CERSAI detailsFile: Sold Unsold 31-12-2022.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31-12-2022.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 1 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 2 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 3 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 4 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 5 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 6 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 7 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 8 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 9 CA.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: 10 CA.pdf | 31 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA BANK LETTER.pdf | 31 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5Mar21.pdf | 31 Dec 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate_compressed.pdf | 31 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: PDFY 201920.pdf | 31 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf | 26 Dec 2019 |
| Details of encumbrancesFile: FORM-B_Prince Developers.pdf | 24 Dec 2019 |
| Declaration in FORM BFile: FORM B__RERA_Prince Developers.pdf | 25 May 2019 |
| Proforma of Allotment letterFile: Agreement.pdf | 24 May 2019 |
| Certificates of CA (Form 3)File: Final Scan CA Certificate.pdf | 24 Jul 2018 |
| OtherFile: Declaration of Revised Area.pdf | 23 Jul 2018 |
| Declaration in FORM BFile: Form B affidavit Rera Prince.pdf | 14 Jul 2018 |
| Building plan approvalFile: MYSCAN_20180712_0001-ilovepdf-compressed.pdf | 13 Jul 2018 |
| Layout approvalFile: MYSCAN_20180712_0002-ilovepdf-compressed.pdf | 13 Jul 2018 |
| Copy of the legal title reportFile: 1.pdf | 13 Jul 2018 |
| Copy of the legal title reportFile: 2.pdf | 13 Jul 2018 |
| Copy of the legal title reportFile: 3.pdf | 13 Jul 2018 |
| Copy of the legal title reportFile: 4.pdf | 13 Jul 2018 |
| Copy of the legal title reportFile: 5.pdf | 13 Jul 2018 |
| Copy of the legal title reportFile: 6.pdf | 13 Jul 2018 |
| Details of encumbrancesFile: NON ENCUMRANCE CERTIFICATE.pdf | 13 Jul 2018 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20180712_0002-ilovepdf-compressed.pdf | 13 Jul 2018 |
| Building Plan Approval (IOD)File: MYSCAN_20180712_0001-ilovepdf-compressed.pdf | 13 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 20180711223755.pdf | 13 Jul 2018 |
| Proforma of Allotment letterFile: UNDERTAKING REGARDING UPLOAD PROFORMA ALLTMENT LETTER.pdf | 13 Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Joy City on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel5,900+ in Raigarh
ARIHANT ASPIRE PHASE I
ARIHANT ABODE LIMITED
Green Terraces, Godrej City, Panvel
CAROA PROPERTIES LLP
Nexspace, Godrej City, Panvel
CAROA PROPERTIES LLP
The Highlands, Godrej City, Panvel
CAROA PROPERTIES LLP
LA MER ONE
La Mer Homes LLP
Emperia Hill Crest
Emperia Builtcon
See every Raigarh project, with the district possession charts
Builder: Prince Developers
Prince Developers has 2 registrations on MahaRERA, including Joy City and SHIVPRASAD HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Joy City shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Joy City is delayed beyond 29 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Joy City?
The registered promoter entity is Prince Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Joy City?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Joy City?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Joy City?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Joy City?
The professionals named in the filing: Architect: AN ARCH; Chartered Accountant: NAVIN PODAR AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Joy City?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback