Home / Browse projects / Thane, Maharashtra / JOLLLY APARTMENT WING A AND B

Completed No litigation declared Residential / Group Housing project

JOLLLY APARTMENT WING A AND B

By RIEL INFRASTRUCTURE PVT LTD

RG-MH-94045 · RERA P51700010153 · Last updated on MahaRERA portal: 6 Apr 2023

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 10%
9Complaints at MahaRERAon this registration
Jump to the 14 documents Report an error

JOLLLY APARTMENT WING A AND B is a Residential / Group Housing project by RIEL INFRASTRUCTURE PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700010153 on 24 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 9 complaints are on record with the regulator.

At a glance

Project

  • NameJOLLLY APARTMENT WING A AND B
  • TypeResidential / Group Housing
  • Location
    • Shahapur (CT)
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010153
  • ReraGenie IDRG-MH-94045

Builder

  • NameRIEL INFRASTRUCTURE PVT LTD
  • Entity typeCompany
  • Managing DirectorHARESH BHANUSHALI
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed14 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JOLLY APARTMENT A WINGNA50000
JOLLY APARTMENT B WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 10%.

JOLLY APARTMENT A WING83%
ActivityProgress
Excavation10%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
JOLLY APARTMENT B WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,105 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SUDHIR D TELAVNEShahapur (CT)Thane

Approvals and building plan

Permissible FSI4048.34
Proposed, not sanctioned3,029 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHANE WEST

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAECHLOGIC CONSULTANT
EngineerARCHILOGIC CONSULTANT
PartnerRole in project
RIEL INFRASTRUCTURE PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700008591Dec 2019 → Jun 2021

Reason as filed by the promoterSHORTAGE OF MANPOWER AND MATERIAL

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000055127BHAGWAT BHANUDAS TANDALERIEL INFRASTRUCTURE PVT LTD28/06/2018
CC006000000055485SANTOSH CHHATRABHUJ KACHAVERIEL INFRASTRUCTURE PVT. LTD24/07/2018
CC006000000056019RAVINDRA LIHITKARRIEL INFRASTRUCTURE PVT LTD29/08/2018
CC006000000055932BALASAHEB DATTATRAYA GULDAGADRIEL INFRUSTRUCTURE PVT. LTD29/08/2018
CC006000000171923DEEPTI DEEPAK RASTOGIRIEL INFRASTRUCTURE PVT LTD19/12/2019
CC006000000171851BHAU KISAN BHANGARERIEL INFRASTRUCTURE PVT LTD13/12/2019
CC006000000182037ANAND RAMCHANDRA GAIKWADRIEL INFRASTRUCTURE PVT. LTD.31/12/2019
CC006000000192578KAMLESH DILIP DUBERIEL INFRASTRUCTURE PRIVATE LTD15/02/2020
CC006000000192743JOLLY APARTMETN WING A AND B WELFARE ASSOCIATIONRIEL INFRASTRUCTURE PRIVATE LIMITED27/02/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Apr 2023

Documents filed14

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Jolly OC Cert.pdf6 Apr 2023
Details of encumbrancesFile: 20170731140713619.pdf31 Jul 2017
Declaration in FORM BFile: 20170731140627310.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 architech certifiacte.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE.pdf31 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE.pdf31 Jul 2017
Building plan approvalFile: JOLLY APART LAYOUT.pdf30 Jul 2017
Layout approvalFile: JOLLY APART LAYOUT.pdf30 Jul 2017
PAN CardFile: RIEL PAN CARD.pdf30 Jul 2017
Copy of the legal title reportFile: 01 TITLE CERTIFICATE.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: JOLLY APART LAYOUT.pdf30 Jul 2017
Building Plan Approval (IOD)File: JOLLY APART LAYOUT.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 04 COC.pdf30 Jul 2017
Proforma of Allotment letterFile: S-1136 - Flat Sale - RERA.pdf30 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JOLLLY APARTMENT WING A AND B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shahapur (CT)7,600+ in Thane

2 kmJOLLLY APARTMENT WING A Completed 19Lapsed / revoked 21Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: RIEL INFRASTRUCTURE PVT LTD

RIEL INFRASTRUCTURE PVT LTD has 3 registrations on MahaRERA, including JOLLLY APARTMENT WING A AND B and JERRY APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JOLLLY APARTMENT WING A AND B is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JOLLLY APARTMENT WING A AND B?

The registered promoter entity is RIEL INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JOLLLY APARTMENT WING A AND B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JOLLLY APARTMENT WING A AND B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JOLLLY APARTMENT WING A AND B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JOLLLY APARTMENT WING A AND B?

The professionals named in the filing: Architect: AECHLOGIC CONSULTANT; Engineer: ARCHILOGIC CONSULTANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JOLLLY APARTMENT WING A AND B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JOLLLY APARTMENT WING A AND B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JOLLLY APARTMENT WING A AND B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.