Home / Browse projects / Mumbai Suburban, Maharashtra / JITEN CHS

Completed No litigation declared Others project

JITEN CHS

By M/s Keytech

RG-MH-90077 · RERA P51800032184 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 98%
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

JITEN CHS is a Others project by M/s Keytech in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032184 on 14 Dec 2021. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 15 months from the original filing.

At a glance

Project

  • NameJITEN CHS
  • TypeOthers
  • Location
    • 27.45 MTR WIDE J.P ROAD VILLAGE AMBIVALI ANDHERI WEST MUMBAI-400058
    • ANDHERI WEST
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800032184
  • ReraGenie IDRG-MH-90077

Builder

  • NameM/s Keytech
  • Entity typePartnership
  • PartnersCHIRAG ASHOK SHAH, HETANSHU CHIRAG SHAH
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredDec 2021First promiseDec 2024Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Dec 2021
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JITEN CHS ABC WINGSNA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.

JITEN CHS ABC WINGS: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
FITNESS CENTERYes0%

Parking filed171

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots171
Closed/Covered171

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,647 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI11676.69
Proposed, not sanctioned8,953 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHAL SHOPPING CENTER MVROAD ANDHERI EASTMUMBAI 400069

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKULIN B PATRAWALA
EngineerDHAVAL SHAH
Chartered AccountantY R GOSWAMI AND CO
PartnerRole in project
M/s Keytech-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800027188Dec 2024 → Mar 2026

Reason as filed by the promoterWE HAVE RECEIVED FULL OCCUPANCY CERTIFICATE FOR WING A & WING B & PART OC UPTO 15TH FLOOR FOR WING C. IN WING C 16TH & 17TH FLOOR OC WILL BE RECEIVE BEFORE 31-03-2026. THEREFORE REQUESTING THE AUTHORITY TO GRANT US EXTENTION

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Plan_1-4.pdf13 May 2026
Occupational CertificateFile: OC Plan_5-8.pdf13 May 2026
Occupational CertificateFile: OC Plan_9-end.pdf13 May 2026
Form 1File: FORM 1 - 31-03-2026.pdf12 May 2026
Form 2File: FORM 2 - 31-03-2026.pdf12 May 2026
Form 3File: FORM 3 - 31-03-2026.pdf12 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD - 31-03-2026.pdf12 May 2026
Occupational CertificateFile: Jiten Full OC.pdf12 May 2026
Form 1File: FORM 1 - 31-12-2025.pdf30 Jan 2026
Form 2File: FORM 2 - 31-12-2025.pdf30 Jan 2026
Form 3File: FORM 3 - 31-12-2025.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY - 31-12-2025.pdf30 Jan 2026
Form 1File: FORM 1 - 30-09-2025.pdf10 Nov 2025
Form 2File: FORM 2 - 30-09-2025.pdf10 Nov 2025
Form 3File: FORM 3 - 30-09-2025.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY - 30-09-2025.pdf10 Nov 2025
Form 1File: FORM 1.pdf10 Nov 2025
Form 2File: FORM 2.pdf10 Nov 2025
Form 3File: FORM 3.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY.pdf10 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jiten form 1-signed.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jiten Form 3 March,2025 Signature Copy Both.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: jiten engg rera 31032025.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JITEN FORM 1.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: JITEN-2A-23-24.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - 31-12-2024.pdf18 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK LETTER.pdf16 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B- AREA AND REVENUE SHARED.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021 - 22.pdf14 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23.pdf14 Jan 2025
Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf4 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022-23.pdf4 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-24.pdf4 Jan 2025
CERSAI detailsFile: CERSAI LETTER.pdf12 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK LETTER.pdf12 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B- AREA AND REVENUE SHARED.pdf12 Dec 2024
Declaration in FORM BFile: FORM B.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf4 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: PARTNERS ANNEXURE A.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf4 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of secured unsecured finance availed for the project.pdf4 Dec 2024
Copy of the legal title reportFile: Jiten Title Report.pdf27 Nov 2023
Proforma of Agreement for saleFile: JitenProforma Agreement.pdf27 Nov 2023
Details of encumbrancesFile: Jiten Encumbrance RERA UPDATE.pdf20 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER CERTIFICATE - JITEN.pdf8 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: jiten engg rera 22.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KT - Jiten - Form - 3 - Certificate V-5.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: JITEN CHS - Rera Form 3 Signature 2023 1.pdf8 Apr 2023
Copy of the legal title reportFile: Revised TItle Report.pdf19 May 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE FOR RAW FLAT.pdf19 May 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE FOR RENT FLAT.pdf19 May 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE FOR SEMI RAW FLAT.pdf19 May 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf19 May 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf19 May 2022
Details of encumbrancesFile: JITEN ENCUMBERNACE SIGNED.pdf23 Dec 2021
CERSAI detailsFile: self declaration.pdf2 Dec 2021
Layout approvalFile: JITEN COM NEW_compressed (4).pdf1 Dec 2021
Building plan approvalFile: JITEN COM NEW_compressed (4).pdf1 Dec 2021
Building plan approvalFile: IOD Drawing (1) (5) (2) (2)_5-end (1).pdf1 Dec 2021
Building plan approvalFile: IOD Drawing (1) (5) (2) (2)_1-1 (1).pdf1 Dec 2021
Building plan approvalFile: IOD Drawing (1) (5) (2) (2)_2-2 (1).pdf1 Dec 2021
Building plan approvalFile: IOD Drawing (1) (5) (2) (2)_3-3 (1).pdf1 Dec 2021
Building plan approvalFile: IOD Drawing (1) (5) (2) (2)_4-4 (1).pdf1 Dec 2021
Copy of Layout Approval (in case of layout)File: JITEN COM NEW_compressed (4).pdf1 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: JITEN COM NEW_compressed (4).pdf1 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing (1) (5) (2) (2)_1-1 (1).pdf1 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing (1) (5) (2) (2)_2-2 (1).pdf1 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing (1) (5) (2) (2)_3-3 (1).pdf1 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing (1) (5) (2) (2)_4-4 (1).pdf1 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing (1) (5) (2) (2)_5-end (1).pdf1 Dec 2021
Proforma of Allotment letterFile: 2348 RERA Agreement.pdf30 Nov 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf30 Nov 2021
Layout approvalFile: 01 first.pdf22 Nov 2021
Building plan approvalFile: 01 first.pdf22 Nov 2021
Copy of Layout Approval (in case of layout)File: 01 first.pdf22 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 01 first.pdf22 Nov 2021
Layout approvalFile: SELF DECLARATION.pdf10 Nov 2021
Copy of Layout Approval (in case of layout)File: SELF DECLARATION.pdf10 Nov 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 15 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JITEN CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI WEST6,700+ in Mumbai Suburban

2 kmJITEN CHSCompleted 124Lapsed / revoked 93Abeyance 1Other 170Dot size: filed unitsN

Filed coordinates, straight-line distance. 388 registered projects within 2 km.

Builder: M/s Keytech

M/s Keytech has 5 registrations on MahaRERA, including KEY TECH PARK and ASHOK SMRUTI DEFG. Its filings disclose 11 earlier MahaRERA projects: declares 3 of 6 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JITEN CHS is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JITEN CHS?

The registered promoter entity is M/s Keytech, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JITEN CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JITEN CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JITEN CHS?

The professionals named in the filing: Architect: KULIN B PATRAWALA; Engineer: DHAVAL SHAH; Chartered Accountant: Y R GOSWAMI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JITEN CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JITEN CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JITEN CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.