Home / Browse projects / Raigarh, Maharashtra / JIJAI TULSI

Registered No litigation declared Residential / Group Housing project

JIJAI TULSI

By SHUBHAM REALTY

RG-MH-95465 · RERA P52000050705 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 40%
142 of 266Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

JIJAI TULSI is a Residential / Group Housing project by SHUBHAM REALTY in Raigarh, Maharashtra, registered with MahaRERA as P52000050705 on 28 Apr 2023. Possession is promised by 31 Dec 2028. 124 of the 266 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameJIJAI TULSI
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO-105/04
    • 105/05 & 106/01
    • NEAR BY GHOT RIVER
    • AT-TALOJE MAJKUR
    • POST-PANVEL
    • DIST-RAIGAD
    • TALOJE MAJKUR
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000050705
  • ReraGenie IDRG-MH-95465

Builder

  • NameSHUBHAM REALTY
  • Entity typePartnership
  • PartnersGURUNATH BALARAM PATIL, GAJANAN GOMA PATIL, SUVARNA DILIP PATIL
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed135 files

Current status

47%124 of 266 units booked
13.6%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A - AARADHYANA20171330133
WING B- DURVANA20171330133

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 40%.

WING A - AARADHYA27%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)30%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B- DURVA27%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)30%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed529

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots529
Closed/Covered36
Open Space493
BuildingClosed/CoveredOpen SpaceTotal
WING A - AARADHYA35247282
WING B- DURVA1246247

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,340 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2025

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI16230.0
Proposed, not sanctioned16,230 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3, 4 AND 5 LABH AVENUE SECTOR 11 DIST RAIGAD, KALAMBOLI 410218
Estimated costRs 71.93 cr
Cost incurredRs 9.75 cr
Work done13.56%
BuildingWingEstimatedIncurred
-NARs 28.07 crRs 85.10 lakh
WING A - AARADHYANARs 21.93 crRs 4.45 cr
WING B- DURVANARs 21.93 crRs 4.45 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectO SEVEN ARCHITECT AND PLANNERS
EngineerVASTUKALP
EngineerSamarth Agarwal
Chartered AccountantAT UPADHYE AND CO
Chartered AccountantDeepesh Shah And Associates
PartnerRole in project
SHUBHAM REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 qtr 4 for sign.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf22 Apr 2026
Withdrawal Update Form 3File: RERA Form 3.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf23 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf23 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 SR.pdf23 Oct 2025
Form 5 (FY 2024-2025)File: Form 5.pdf30 Sep 2025
Withdrawal Update Form 1File: Form-1.pdf21 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf21 Aug 2025
Withdrawal Update Form 3File: Form 3 CA Certificate V1.pdf21 Aug 2025
Form 1File: Form 1.pdf19 Aug 2025
Form 2File: Form 2.pdf19 Aug 2025
Form 3File: Form 3 CA Certificate - SR.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Unsold Inventory.pdf19 Aug 2025
Form 1File: Form 1.pdf19 Aug 2025
Form 2File: Form 2.pdf19 Aug 2025
Form 3File: Form 3 CA Certificate - SR Final.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Unsold Inventory.pdf19 Aug 2025
Form 3File: FORM 3 SIGN COPY.pdf19 Aug 2025
Form 2File: FORM 2.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Unsold Inventory.pdf19 Aug 2025
Form 1File: Form 1.pdf19 Aug 2025
Form 1File: Shubham Realty - Form I-Qtr I-24-25.pdf19 Aug 2025
Form 2File: Shubham Realty - Form II-Qtr I-24-25.pdf19 Aug 2025
Form 3File: Shubham Realty - Form III-Qtr I-24-25.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Unsold Inventory.pdf19 Aug 2025
Form 1File: Shubham Realty _Architect Certificate_31032024.pdf19 Aug 2025
Form 2File: Form 2-Realty - MARCH 24.pdf19 Aug 2025
Form 3File: Form 3 CA Certificate - SR.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure Of Sold Unsold Inventory.pdf19 Aug 2025
Form 1File: Shubham Realty _Architect Certificate_31032024.pdf19 Aug 2025
Form 2File: Form 2-Realty - MARCH 24.pdf19 Aug 2025
Form 3File: Form 3 CA Certificate - SR.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure Of Sold Unsold Inventory.pdf19 Aug 2025
Form 1File: Shubham Realty _Architect Certificate_31032024.pdf19 Aug 2025
Form 2File: Form 2-Realty - MARCH 24.pdf19 Aug 2025
Form 3File: Form 3 CA Certificate - SR.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure Of Sold Unsold Inventory.pdf19 Aug 2025
Form 1File: Shubham Realty _Architect Certificate_31032024.pdf19 Aug 2025
Form 2File: Form 2-Realty - MARCH 24.pdf19 Aug 2025
Form 3File: Form 3 CA Certificate - SR.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure Of Sold Unsold Inventory.pdf19 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 CA.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Unsold Inventory.pdf30 Apr 2025
Form 229 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SR Form-3 As v.pdf19 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Formate B BANK LETTER.pdf19 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: formate A.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate -V1_compressed.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - SR.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Qtr-Jul 24-Sept 24.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGN COPY.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubham Realty - Form I-Qtr I-24-25.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shubham Realty - Form III-Qtr I-24-25.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shubham Realty - Form II-Qtr I-24-25.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shubham Realty - Form 5 Apr 23-Mar 24.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: 4 Disclosure Of Sold Unsold Inventory.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Realty-Form 2-Jul 23.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Realty-Form 2-Sept 23.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Realty-Form 2-Dec 23.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Realty-Form 2-Mar 24.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubham Realty _Architect Certificate_10072023.pdf2 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubham Realty _Architect Certificate_30092023.pdf2 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubham Realty _Architect Certificate_31122023.pdf2 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubham Realty _Architect Certificate_31032024.pdf2 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dated 10072023.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dated 07092023.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dated 31122023.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SR_Engineer's Certificate 01072023.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SR_Engineer's Certificate 30092023.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SR_Engineer's Certificate 31122023.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-300623-signed.pdf27 Mar 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JIJAI ANGANP52000026344NEAR BY TALOJA PHASE - 2, Raigarh266Sep 2020OngoingJun 2026Not delivered
JIJAI COMPLEXP52000012017NEAR BY TALOJA, Raigarh136Sep 2017CompletedOct 2020Registered original: Dec 2018May 2019

How this compares with Raigarh

47%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JIJAI TULSI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALOJE MAJKUR5,900+ in Raigarh

2 kmJIJAI TULSICompleted 57Lapsed / revoked 20Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 153 registered projects within 2 km.

Builder: SHUBHAM REALTY

Shubham Realty has 5 registrations on MahaRERA, including Shubham Sarayu and JIJAI TULSI. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if JIJAI TULSI is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JIJAI TULSI?

The registered promoter entity is SHUBHAM REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JIJAI TULSI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JIJAI TULSI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JIJAI TULSI?

The professionals named in the filing: Architect: O SEVEN ARCHITECT AND PLANNERS; Engineer: VASTUKALP; Engineer: Samarth Agarwal; Chartered Accountant: AT UPADHYE AND CO; Chartered Accountant: Deepesh Shah And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JIJAI TULSI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JIJAI TULSI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JIJAI TULSI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.