Jeevan Lifespaces
RG-MH-69378 · RERA P51700050185 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Jeevan Lifespaces is a Others project by Ms Jeevan Enterprises in Thane, Maharashtra, registered with MahaRERA as P51700050185 on 21 Mar 2023. Possession is promised by 31 Dec 2027. 16 of the 52 units on this registration are recorded sold or booked, and 1 of 33 construction stages are filed complete.
At a glance
Project
- NameJeevan Lifespaces
- TypeOthers
- Location
- Wasind
- Khativali
- Shahapur
- Thane
- 421601
- Pincode421601
- RERA no.P51700050185
- ReraGenie IDRG-MH-69378
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Mar 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings3 building records
- Documents filed90 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B Wing | NA | 7 | 7 | 49 | 3 | 52 |
| C Wing | NA | 7 | 0 | 0 | 0 | 0 |
| D Wing | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 60%.
B Wing20%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 60% |
| Podiums (if any) | 0% |
| Plinth | 60% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C Wing0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D Wing0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed308
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| B Wing | 8 | 88 | 96 |
| C Wing | 18 | 88 | 106 |
| D Wing | 18 | 88 | 106 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ms Jeevan Enterprises | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ms Manav Consultants |
| Engineer | Seelaboyina Srinivas Kumar |
| Chartered Accountant | MS Kulkarni & Associates |
| Chartered Accountant | Sanika Ketkar and Associates |
| Chartered Accountant | CA Soham Ketkar and Associates |
| Partner | Role in project |
|---|---|
| Ms Jeevan Enterprises | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: ARCH CERTIFICATE FORM 1 VASIND DT 310326.pdf | 27 May 2026 |
| Form 2File: ENGINEERS CERTIFICATE VASIND BCD.pdf | 27 May 2026 |
| OthersFile: QUALITY ASSURANCE CERTIFICATE VASIND.pdf | 27 May 2026 |
| Form 3File: CA CERTIFICATE BLDG B VASIND310326.pdf | 27 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory B BLDG.pdf | 27 May 2026 |
| Form 1File: FORM 1.pdf | 18 Feb 2026 |
| Form 2File: Form 2.pdf | 18 Feb 2026 |
| Form 3File: Form 3.pdf | 18 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory.pdf | 18 Feb 2026 |
| Form 1File: FORM 1.pdf | 4 Dec 2025 |
| Form 2File: ENGINEERS CERTIFICATE VASIND.pdf | 4 Dec 2025 |
| Form 3File: FORM 3.pdf | 4 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 4 Dec 2025 |
| Form 1File: Form 1.pdf | 20 Aug 2025 |
| Form 2File: Form 2.pdf | 20 Aug 2025 |
| Form 3File: From 3.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 20 Aug 2025 |
| Form 1File: FORM 1.pdf | 4 Jul 2025 |
| Form 2File: Form 2.pdf | 4 Jul 2025 |
| Form 3File: From 3.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory.pdf | 4 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked jun 2024.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold booked Sep 2024.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 06 24.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 09 24.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 06 24.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 09 24.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 06 24.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 09 24.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 6 2023.pdf | 29 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 9 2023.pdf | 29 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 12 2023.pdf | 29 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Mar 24.pdf | 29 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSURANCE CERTIFICATE VASIND.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory (Compliance) B WING.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory (Compliance) C WING.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory (Compliance) D WING.pdf | 29 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 24.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form3 Dec 23.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Mar 24.pdf | 27 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-FY 22-23-VASIND.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 22 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance.pdf | 22 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certiicate.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 22 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE VASHIND.pdf | 12 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE VASHIND.pdf | 12 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jeevan Lifespaces compressed.pdf | 12 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 23-24 - Q1 - Form 1.pdf | 25 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 23-24 - Q1 - Form 2.pdf | 25 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 23-24 - Q1 - Form 2A.pdf | 25 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23-24 - Q1 - Form 3.pdf | 25 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: updated legal and finance encumbrance declaration.pdf | 24 Feb 2023 |
| Details of encumbrances concerned to LegalFile: updated legal and finance encumbrance declaration.pdf | 24 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Grampanchayat CC.pdf | 24 Feb 2023 |
| Other - TechnicalFile: Updated layout plan.pdf | 24 Feb 2023 |
| Proforma of Agreement for saleFile: Final AFS Lifespaces.pdf | 13 Feb 2023 |
| Layout approvalFile: Highlighted layout.pdf | 11 Feb 2023 |
| Building plan approvalFile: Building Plan - Wing B updated.pdf | 11 Feb 2023 |
| Building plan approvalFile: Building Plan - Wing C updated.pdf | 11 Feb 2023 |
| Building plan approvalFile: Building Plan - Wing D updated.pdf | 11 Feb 2023 |
| PAN CardFile: Firm Pan Card.pdf | 11 Feb 2023 |
| Copy of the legal title reportFile: Legal Title Report compressed.pdf | 11 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: legal and finance encumbrance declaration.pdf | 11 Feb 2023 |
| Details of encumbrances concerned to LegalFile: legal and finance encumbrance declaration.pdf | 11 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Highlighted layout.pdf | 11 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan - Wing B updated.pdf | 11 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan - Wing C updated.pdf | 11 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan - Wing D updated.pdf | 11 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 11 Feb 2023 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 11 Feb 2023 |
| Declaration in FORM BFile: Form B - Adesh Kriplani.pdf | 11 Feb 2023 |
| Declaration in FORM BFile: Form B - Deepak Kriplani.pdf | 11 Feb 2023 |
| Declaration in FORM BFile: Form B - Javed Shaikh.pdf | 11 Feb 2023 |
| Declaration in FORM BFile: Form B - Rafique Shaikh.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 11 Feb 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Legacy EnclaveP51700034009 | Thane, Thane | Mar 2022 | Completed | Dec 2024 | Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Jeevan Lifespaces on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wasind7,600+ in Thane
BELLA VISTA PHASE 8
INDO ASIAN BUILDCON PVT LTD
RUSTOMJEE BELLE VUE
KEYSTONE REALTORS LIMITED
THE VENISCAPE
MIVAAN BUILDCON PRIVATE LIMITED
VISION SKY WORLD
M/S VISION SKY WORLD
Sunteck FORESTWorld 1
SUNTECK REALTY HOLDINGS PVT LTD
Sunteck FORESTWorld 2
SUNTECK REALTY HOLDINGS PVT LTD
See every Thane project, with the district possession charts
Builder: Ms Jeevan Enterprises
Ms Jeevan Enterprises has 2 registrations on MahaRERA, including Jeevan Lifestyles Phase 6 and Jeevan Lifespaces. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Jeevan Lifespaces is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Jeevan Lifespaces?
The registered promoter entity is Ms Jeevan Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Jeevan Lifespaces?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Jeevan Lifespaces?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Jeevan Lifespaces?
The professionals named in the filing: Architect: Ms Manav Consultants; Engineer: Seelaboyina Srinivas Kumar; Chartered Accountant: MS Kulkarni & Associates; Chartered Accountant: Sanika Ketkar and Associates; Chartered Accountant: CA Soham Ketkar and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Jeevan Lifespaces?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback