Home / Browse projects / Nashik, Maharashtra / Jeevan Anand
Jeevan Anand
RG-MH-15581 · RERA P51600045594 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Jeevan Anand is a Others project by Real Buildcon in Nashik, Maharashtra, registered with MahaRERA as P51600045594 on 26 May 2022. The registration is recorded completed; possession was promised by 1 May 2026. 17 of the 44 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameJeevan Anand
- TypeOthers
- Location
- Dindori Road
- Mhasrul
- Nashik (M Corp.)
- Nashik
- 422004
- Pincode422004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600045594
- ReraGenie IDRG-MH-15581
Builder
- NameReal Buildcon
- Entity typePartnership
- PartnersSUSHIL SURYAKANT BAGAD, Vikrant Surykant Bagad, Gautam Mohanlal Sakhala
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 May 2022
- Promised completion1 May 2026
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Current status
Figures as on 28 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Jeevan Anand | NA | 9 | 0 | 40 | 4 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 0%.
Jeevan Anand: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed169
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sampat Ramesh Vadje | Niphad | Nashik |
| Balasaheb Ramesh Vadje | Niphad | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Jeevan Anand | NA | Rs 6.10 cr | Rs 6.10 cr |
| - | NA | Rs 90.00 lakh | Rs 90.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ravi Amrutkar and Assoicates |
| Engineer | Sushil Bagad |
| Chartered Accountant | Rahul A Chhallani |
| Chartered Accountant | Ankita Mutha |
| Partner | Role in project |
|---|---|
| Real Buildcon | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form -3 Chartered Accountant Certificate Q-4 - converted.pdf | 28 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - Engineer Quality Assurance Certificate (FY 2025-26).pdf | 28 Apr 2026 |
| Occupational CertificateFile: Full Occupancy Certificate.pdf | 5 Mar 2026 |
| Occupational CertificateFile: Screenshot.pdf | 5 Mar 2026 |
| Occupational CertificateFile: From - 4 Certificate of Completion (Architects Certificate) - Jeevan Anand.pdf | 5 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form-2A - Quality Assurance Certificate (Real Buildcon) 2024-25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Signed Q3.pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Architechu0027s Certificate Q-2 (2025-26).pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: Form 2-Engineer Certificate Q-2 (2025-26).pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: Form -3 Chartered Accountant Certificate Q-2.pdf | 14 Nov 2025 |
| Form 5 (FY 2024-2025)File: Annual Report on Statement of Accounts (Form 5) FY 2024-2025.pdf | 8 Nov 2025 |
| Withdrawal Update Form 1File: Real Build con Architec Certificate 30-9-23.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2-Engineer Certificate Q-1 (2025-26).pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form -3 Chartered Accountant Certificate Q-1 - converted.pdf | 23 Jul 2025 |
| Form 1File: Form 1 - Architech's Certificate Q-1 (2024-25)_compressed.pdf | 4 Jul 2025 |
| Form 2File: Forms 2-Engineer Certificate Q-1 (2024-25).pdf | 4 Jul 2025 |
| Form 3File: Form 3 RB Rera Signed.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q-1 2024-25.pdf | 4 Jul 2025 |
| Form 1File: Form 1 - Architech's Certificate Q-2 (2024-25)_compressed.pdf | 4 Jul 2025 |
| Form 2File: Forms 2-Engineer Certificate Q-2 (2024-25).pdf | 4 Jul 2025 |
| Form 3File: Form 3 RB Rera Signed.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q-2 2024-25.pdf | 4 Jul 2025 |
| Form 2File: Forms 2-Engineer Certificate Q-3 (2024-25).pdf | 4 Jul 2025 |
| Form 1File: Form 1 - Architech's Certificate Q-3 (2024-25)_compressed.pdf | 4 Jul 2025 |
| Form 3File: Signed Form 3_compressed.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q-3 2024-25.pdf | 4 Jul 2025 |
| Form 1File: Form 1 - Architech's Certificate Q-4 (2024-25)_compressed.pdf | 4 Jul 2025 |
| Form 2File: Forms 2-Engineer Certificate Q-4 (2024-25)_compressed.pdf | 4 Jul 2025 |
| Form 3File: Form -3 Chartered Accountant Certificate Q-4.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q4 2024-25.pdf | 4 Jul 2025 |
| Form 1 - Architech's Certificate Q-1 (2024-25)_compressed | 29 Apr 2025 |
| Form 1 - Architech's Certificate Q-2 (2024-25)_compressed | 29 Apr 2025 |
| Form 1 - Architech's Certificate Q-3 (2024-25)_compressed | 29 Apr 2025 |
| Form 1 - Architech's Certificate Q-4 (2024-25)_compressed | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RB Rera Signed.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RB Rera Signed.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3_compressed.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Chartered Accountant Certificate Q-4.pdf | 29 Apr 2025 |
| Forms 2-Engineer Certificate Q-1 (2024-25) | 29 Apr 2025 |
| Forms 2-Engineer Certificate Q-2 (2024-25) | 29 Apr 2025 |
| Forms 2-Engineer Certificate Q-3 (2024-25) | 29 Apr 2025 |
| Forms 2-Engineer Certificate Q-4 (2024-25)_compressed | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q4 2024-25.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q-3 2024-25.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q-2 2024-25.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q-1 2024-25.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RB Rera Signed.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RB Rera Signed.pdf | 13 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RB rera cert 23-24.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jeevan Anand Form 3 Q3 FY 23-24 Signed_compressed.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Real Buildcon F3 31-3-24 signed compressed.pdf | 14 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Real Buildcon Architect Certificate 31-03-23.pdf | 1 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Real Buildcon Architect Certificate 30-6-23.pdf | 1 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Real Build con Architec Certificate 30-9-23.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: REAL BUILDCON - Form 2 31-03-2023.pdf | 22 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: REAL BUILDCON - Form 2 30-06-2023.pdf | 22 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: REAL BUILDCON - Form 2 30-09-2023.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Real Buildcon F-3 30-6-23.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Real Buildcon F-3 30-9-23.pdf | 22 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 RB 22-23.pdf | 8 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Upload.pdf | 4 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Real Buildcon Architect Certificte Sept 22.pdf | 23 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Real Buildcon Architect Certificte Dec 22.pdf | 23 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Real Buildcon Engineer Certificate Sept 22.pdf | 23 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Real Buildcon Engineer Certificate Dec 22.pdf | 23 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Real Buildon Sold -Unsold Summary sept 22.pdf | 23 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Real Buildcon Sold - Unsold Summary Dec 22.pdf | 23 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REAL BUILDCON F3 Sept 22.pdf | 23 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REAL BUILDCON F3 Dec 22.pdf | 23 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Promoter.pdf | 17 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Real Buldcon Landowner.pdf | 17 May 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 17 May 2022 |
| CERSAI detailsFile: Cersai Report Asset Based.pdf | 16 May 2022 |
| Proforma of Allotment letterFile: Draft Agreement.pdf | 16 May 2022 |
| Layout approvalFile: Sanctioned Plan Compressed.pdf | 11 May 2022 |
| Building plan approvalFile: Sanctioned Plan Compressed.pdf | 11 May 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
Keep Jeevan Anand on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mhasrul4,100+ in Nashik
Filed coordinates, straight-line distance. 95 registered projects within 2 km.
GLOBAL VILLE
SHRADDHA INFRA
PEACOCK HILLS
PEACOCK HILLS BUILDTECH LLP
The Northland by Madhu Vitthal
Northland Realty
ANANDGRAM
MAP INFRA
RAMCHANDRA NAGAR
DESHPANDE CONSTRUCTIONS & LAND DEVELOPERS
KRISHNA PRANIT APARTMENT
BODKE BUILDCON
See every Nashik project, with the district possession charts
Builder: Real Buildcon
Real Buildcon has 1 registration on MahaRERA, including Jeevan Anand. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Jeevan Anand is delayed beyond 1 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Jeevan Anand?
The registered promoter entity is Real Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Jeevan Anand?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Jeevan Anand?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Jeevan Anand?
The professionals named in the filing: Architect: Ravi Amrutkar and Assoicates; Engineer: Sushil Bagad; Chartered Accountant: Rahul A Chhallani; Chartered Accountant: Ankita Mutha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Jeevan Anand?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback