Home / Browse projects / Thane, Maharashtra / JD Park

Completed No litigation declared Residential / Group Housing project

JD Park

By JD Housing LLP

RG-MH-71103 · RERA P51700016060 · Last updated on MahaRERA portal: 28 Mar 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

JD Park is a Residential / Group Housing project by JD Housing LLP in Thane, Maharashtra, registered with MahaRERA as P51700016060 on 16 Apr 2018. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NameJD Park
  • TypeResidential / Group Housing
  • Location
    • Old Agra Road
    • Cherpoli
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700016060
  • ReraGenie IDRG-MH-71103

Builder

  • NameJD Housing LLP
  • Entity typePartnership
  • GSTIN27AAJFJ4296J1ZT
  • PartnersJinesh Jagdishchandra Doshi, Rajendra Achalchand Jain, Milind Manoj Shah, Rajesh Kanaiyalal Vanjarani

Key dates

this monthRegisteredApr 2018PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Apr 2018
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA50000
BUILDING NO 2NA50000
BUILDING NO 3NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed143

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots143
Closed/Covered24
Open Space119
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 175057
BUILDING NO 275057
BUILDING NO 3101929

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,255 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Ganesh Gopal ShirkeThane (M Corp.)Thane

Approvals and building plan

Permissible FSI3903.24
Proposed, not sanctioned3,903 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround floor, filix building, opp, Asian Paints, nr Vijay Sales, LBS Marg, Bhandup west, Mumbai - 40

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY BAHULEKAR
EngineerADVANCE CREATIVE DESIGN CONSULTANCY
PartnerRole in project
JD Housing LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Oct 2021

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: j d housing audit report FY 22-23 scan.pdf28 Mar 2024
Status of ConveyanceFile: Conveyance.pdf26 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q1 21-22.pdf16 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q2 21-22.pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 2021-2022.pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q2 2021-2022.pdf16 Oct 2023
Certificates of CA (Form 3)File: Form 3 Q1 20212022.pdf16 Oct 2023
Certificates of CA (Form 3)File: Form 3 Q2 20212022.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 annual 2021-2022.pdf16 Oct 2023
Status of ConveyanceFile: Conveyance draft.pdf12 Aug 2023
Status of ConveyanceFile: Conveyance Corresp.pdf12 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf8 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct certificate fy 20202021 Q1.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct certificate fy 20202021 Q2.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct certificate fy 20202021 Q3.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct certificate fy 20202021 Q4.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate fy 20202021 Q1.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate fy 20202021 Q2.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate fy 20202021 Q3.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate fy 20202021 Q4.pdf30 Sep 2022
Certificates of CA (Form 3)File: CA certificate f y 20202021 Q1.pdf30 Sep 2022
Certificates of CA (Form 3)File: CA certificate f y 20202021 Q2.pdf30 Sep 2022
Certificates of CA (Form 3)File: CA certificate f y 20202021 Q3.pdf30 Sep 2022
Certificates of CA (Form 3)File: CA certificate f y 20202021 Q4.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA certificate form 5 f y 20202021.pdf30 Sep 2022
CERSAI detailsFile: CERSAI undertaking.pdf5 Sep 2022
Disclosure of sold/ booked inventoryFile: Disclosure of flats- sold- unsold- booked 4-8-22-compressed.pdf4 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Bldg-2.pdf21 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q1.pdf16 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q2.pdf16 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q3.pdf16 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q4.pdf16 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Q1_optimised.pdf16 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Q2_Optimised.pdf16 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Q3_optimised.pdf16 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Q4_Optimised.pdf16 Jul 2021
Certificates of CA (Form 3)File: Form 3_Q1_optimised.pdf16 Jul 2021
Certificates of CA (Form 3)File: Form 3_Q2_Optimised.pdf16 Jul 2021
Certificates of CA (Form 3)File: Form 3_Q3_Optimised.pdf16 Jul 2021
Certificates of CA (Form 3)File: Form 3_Q4_optimised.pdf16 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf16 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: June -No-6- 2020.pdf7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sept- No7-2020.pdf7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Dec-No 8-2020.pdf7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Dec-No 8-2020.pdf7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March-No-9-2021.pdf7 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration.pdf1 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf30 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan1-.pdf21 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Scan6.pdf21 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: scan5-.pdf21 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: scan4-.pdf21 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: scan3-.pdf21 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Scan2-.pdf21 Aug 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_Signed_Kishor Pabari.pdf30 Jul 2020
Details of Restarting of Construction work post lockdownFile: Work Status 26-06-2020.pdf26 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate.pdf11 May 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate.pdf11 May 2020
Certificates of CA (Form 3)File: Form 3_CA Certificate.pdf11 May 2020
Building plan approvalFile: NA Order.pdf10 Apr 2018
Building plan approvalFile: TP-Order.pdf10 Apr 2018
Layout approvalFile: Cherpoli Approved Layout.PDF10 Apr 2018
PAN CardFile: JD HOUSING LLP-Pan card.pdf10 Apr 2018
PAN CardFile: Ganesh Shirke _Pan Card.pdf10 Apr 2018
Copy of the legal title reportFile: Title Certificate-1-5.pdf10 Apr 2018
Copy of the legal title reportFile: Title Certificate-6-10.pdf10 Apr 2018
Copy of the legal title reportFile: Title Certificate-11-15.pdf10 Apr 2018
Details of encumbrancesFile: Declaration of encumbrance_GS.pdf10 Apr 2018
Copy of Layout Approval (in case of layout)File: Cherpoli Approved Layout.PDF10 Apr 2018
Building Plan Approval (IOD)File: NA Order.pdf10 Apr 2018
Building Plan Approval (IOD)File: TP-Order.pdf10 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: TP-Order.pdf10 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf10 Apr 2018
Declaration in FORM BFile: Affidavit Cum Declaration _JJ.pdf10 Apr 2018
Declaration in FORM BFile: Affidavit-Ganesh_Form B.pdf10 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-form-1.pdf10 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf10 Apr 2018
Certificates of CA (Form 3)File: CA -Cert -form-3.pdf10 Apr 2018
Proforma of Allotment letterFile: MODEL AGREEMENT_JD.pdf10 Apr 2018
Proforma of Allotment letterFile: MODEL AGREEMENT_GS.pdf10 Apr 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JD Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Cherpoli7,600+ in Thane

2 kmJD ParkCompleted 5Lapsed / revoked 14Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: JD Housing LLP

JD Housing LLP has 1 registration on MahaRERA, including JD Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JD Park is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JD Park?

The registered promoter entity is JD Housing LLP, a partnership as per the filing. Its GSTIN 27AAJFJ4296J1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JD Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JD Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JD Park?

The professionals named in the filing: Architect: VIJAY BAHULEKAR; Engineer: ADVANCE CREATIVE DESIGN CONSULTANCY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JD Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JD Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JD Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.