Home / Browse projects / Raigarh, Maharashtra / Jayram Residency Phase-I

Registered No litigation declared Residential / Group Housing project

Jayram Residency Phase-I

By Jayram Construction

RG-MH-06553 · RERA P52000052726 · Last updated on MahaRERA portal: 23 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
15 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 65%
56 of 245Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 171 documents Report an error

Jayram Residency Phase-I is a Residential / Group Housing project by Jayram Construction in Raigarh, Maharashtra, registered with MahaRERA as P52000052726 on 22 Sep 2023. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 189 of the 245 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameJayram Residency Phase-I
  • TypeResidential / Group Housing
  • Location
    • off Shedung Vardoli Road
    • Shedung
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052726
  • ReraGenie IDRG-MH-06553

Builder

  • NameJayram Construction
  • Entity typePartnership
  • PartnersRavindra Kisan Maharnavar, Ramdas Kisan Maharnavar

Key dates

this monthRegisteredSep 2023First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings3 building records
  • Documents filed171 files

Current status

77%189 of 245 units booked
60.1%Work done, per cost certificate

Figures as on 23 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA8770070
Building No 2NA8790191
Building No 3NA8784084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 65%.

Building No 135%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 282%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 336%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed312

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots312
Closed/Covered267
Open Space45
BuildingClosed/CoveredOpen SpaceTotal
Building No 19315108
Building No 28416100
Building No 39014104

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,552 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 May 2025

Approvals and building plan

Sanctioning authorityMSRDC
Permissible FSI13297.04
Proposed, not sanctioned13,297 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAPMC Market Vashi
Estimated costRs 42.34 cr
Cost incurredRs 25.43 cr
Work done60.06%
BuildingWingEstimatedIncurred
Building No 1NARs 16.11 crRs 8.06 cr
Building No 2NARs 12.08 crRs 11.48 cr
Building No 3NARs 12.08 crRs 5.44 cr
-NARs 2.06 crRs 45.50 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNEHA JAIN
EngineerAmol Dhumal
EngineerPRAVEEN RAVINDRA MAHARNAVAR
EngineerChetan Gautam Jain
Chartered AccountantBrajesh Goyal And Associates
Chartered AccountantJB PATEL & ASSOCIATES
PartnerRole in project
Jayram Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52000052726/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed171

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 171 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - 2025-26.pdf23 Sep 2026
Form 2A (FY 2024-2025)File: FORM 2A Jayram Residency Phase-I - 2024-25.pdf17 Jul 2026
Withdrawal Update Form 1File: Form-1 - Jayram Ph-1 - 30 June 2026.pdf13 Jul 2026
Withdrawal Update Form 2File: Form-2 - Jayram Ph-1 - 30 June 2026.pdf13 Jul 2026
Withdrawal Update Form 3File: Jayram Construction Form 3 Q1.pdf13 Jul 2026
Withdrawal Update Form 1File: Jayram Phase I - Q4 - Form 1.pdf27 Apr 2026
Withdrawal Update Form 2File: Jayram Phase I - Q4 - Form 2.pdf27 Apr 2026
Withdrawal Update Form 3File: Jayram Phase I - Q4 - Form 3.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 (with date).pdf28 Jan 2026
Withdrawal Update Form 3File: FORM 3 (Final)_compressed.pdf28 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf10 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf10 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf10 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf10 Nov 2025
Withdrawal Update Form 3File: FORM 3 jayram.pdf10 Nov 2025
Withdrawal Update Form 3File: FORM 3 jayram.pdf10 Nov 2025
Layout approvalFile: Sheet No 1.pdf6 Nov 2025
Layout approvalFile: sheet no 2.pdf6 Nov 2025
Layout approvalFile: Sheet no 3.pdf6 Nov 2025
Layout approvalFile: sheet No 4.pdf6 Nov 2025
Layout approvalFile: sheet no 5.pdf6 Nov 2025
Layout approvalFile: sheet no 6.pdf6 Nov 2025
Layout approvalFile: sheet no 7.pdf6 Nov 2025
Layout approvalFile: sheet no 8.pdf6 Nov 2025
Layout approvalFile: sheet no 9.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5_JAYRAM CONSTRUCTION_FY 24-25_SCANNED.pdf8 Oct 2025
Form 1File: FORM-1 -AR - JAYRAM RESIDENCY 30-09-2023.pdf4 Sep 2025
Form 2File: Form 2 - Er - JAYRAM RESIDENCY 30-09-2023.pdf4 Sep 2025
Form 3File: FORM-3 -CA - JAYRAM RESIDENCY 30-09-2023.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30-09-2023.pdf4 Sep 2025
Form 1File: AR- ARCHITECT CERTIFICATE -JAYRAM -30-12-2023.pdf4 Sep 2025
Form 2File: ER- ARCHITECT CERTIFICATE -JAYRAM -30-12-2023.pdf4 Sep 2025
Form 3File: CA- ARCHITECT CERTIFICATE -JAYRAM -30-12-2023_compressed.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31-12-23.pdf4 Sep 2025
Form 1File: AR- Jayram Residency Phase -I 30-09-2024.pdf4 Sep 2025
Form 2File: ER-Jayram Residency Ph-I - 30-09-2024.pdf4 Sep 2025
Form 3File: CA-Jayram Residency Ph-I.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30-09-24.pdf4 Sep 2025
Form 1File: AR - Jayram Residency Ph-I.pdf4 Sep 2025
Form 2File: ER - Jayram Residency Ph-I.pdf4 Sep 2025
Form 3File: CA - Jayram Residency Ph-I.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31-12-24.pdf4 Sep 2025
Withdrawal Update Form 1File: Form-1 -Jayram- Architect Certificate 30-06-2025.pdf4 Sep 2025
Withdrawal Update Form 2File: Form-2 -Jayram- Engineer Certificate 30-06-2025.pdf4 Sep 2025
Withdrawal Update Form 3File: Form 3_Jayram Construction_Jun-25.pdf4 Sep 2025
Form 1File: Form -1 Architect 30-06-2024.pdf3 Sep 2025
Form 2File: Jayram- Engineer Certificate 30-06-2024.pdf3 Sep 2025
Form 3File: Form-3- Jayram Residency Phase -I.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Jayram Residency Phase-I Sold Inventory Disclosure- June 24.pdf3 Sep 2025
Form 1File: Jayram ph-I- ARCHITECT CERTIFICATE 31-03-2024.pdf3 Sep 2025
Form 2File: Jayram ph-I- Engineer Certificate 31-03-2024.pdf3 Sep 2025
Form 3File: Jayram ph-I- CA Certificate 31-03-2024.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Jayram Residency Phase-I Sold Inventory Disclosure- March 24.pdf3 Sep 2025
Withdrawal Update Form 1File: Jayram Architect Certificate.pdf3 Sep 2025
Withdrawal Update Form 1File: Jayram Architect Certificate.pdf3 Sep 2025
Withdrawal Update Form 1File: Jayram Architect Certificate.pdf3 Sep 2025
Withdrawal Update Form 1File: AR- ARCHITECT CERTIFICATE -JAYRAM -30-12-2023.pdf3 Sep 2025
Withdrawal Update Form 1File: Jayram ph-I- ARCHITECT CERTIFICATE 31-03-2024.pdf3 Sep 2025
Withdrawal Update Form 1File: Jayram ph-I- ARCHITECT CERTIFICATE 31-03-2024.pdf3 Sep 2025
Withdrawal Update Form 1File: FORM-1 -AR - JAYRAM RESIDENCY 30-09-2023.pdf3 Sep 2025
Withdrawal Update Form 2File: Jayram Engineer Certificate .pdf3 Sep 2025
Withdrawal Update Form 2File: Jayram Engineer Certificate .pdf3 Sep 2025
Withdrawal Update Form 2File: Form 2 - Er - JAYRAM RESIDENCY 30-09-2023.pdf3 Sep 2025
Withdrawal Update Form 2File: ER- ARCHITECT CERTIFICATE -JAYRAM -30-12-2023.pdf3 Sep 2025
Withdrawal Update Form 2File: Jayram ph-I- Engineer Certificate 31-03-2024.pdf3 Sep 2025
Withdrawal Update Form 2File: Jayram- Engineer Certificate 30-06-2024.pdf3 Sep 2025
Withdrawal Update Form 2File: Form 2 - Er - JAYRAM RESIDENCY 30-09-2023.pdf3 Sep 2025
Withdrawal Update Form 3File: Jayram PH 1 CA Certificate March 2025.pdf3 Sep 2025
Withdrawal Update Form 3File: Jayram PH 1 CA Certificate March 2025.pdf3 Sep 2025
Withdrawal Update Form 3File: FORM-3 -CA - JAYRAM RESIDENCY 30-09-2023.pdf3 Sep 2025
Withdrawal Update Form 3File: jayram CA.pdf3 Sep 2025
Withdrawal Update Form 3File: Jayram ph-I- CA Certificate 31-03-2024.pdf3 Sep 2025
Withdrawal Update Form 3File: Form-3- Jayram Residency Phase -I.pdf3 Sep 2025
Withdrawal Update Form 3File: FORM-3 -CA - JAYRAM RESIDENCY 30-09-2023.pdf3 Sep 2025
Withdrawal Update Form 1File: Jayram Architect Certificate.pdf2 Sep 2025
Withdrawal Update Form 2File: Jayram Engineer Certificate .pdf2 Sep 2025
Withdrawal Update Form 3File: Jayram PH 1 CA Certificate March 2025.pdf2 Sep 2025
Withdrawal Update Form 1File: FORM-1 -AR - JAYRAM RESIDENCY 30-09-2023.pdf1 Sep 2025
Withdrawal Update Form 1File: AR- ARCHITECT CERTIFICATE -JAYRAM -30-12-2023.pdf1 Sep 2025

How this compares with Raigarh

77%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 4 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jayram Residency Phase-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shedung5,900+ in Raigarh

2 kmJayram Residency Phase-ICompleted 5Lapsed / revoked 4Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: Jayram Construction

Jayram Construction has 1 registration on MahaRERA, including Jayram Residency Phase-I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Jayram Residency Phase-I is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jayram Residency Phase-I?

The registered promoter entity is Jayram Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jayram Residency Phase-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jayram Residency Phase-I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jayram Residency Phase-I?

The professionals named in the filing: Architect: NEHA JAIN; Engineer: Amol Dhumal; Engineer: PRAVEEN RAVINDRA MAHARNAVAR; Engineer: Chetan Gautam Jain; Chartered Accountant: Brajesh Goyal And Associates; Chartered Accountant: JB PATEL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jayram Residency Phase-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jayram Residency Phase-I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jayram Residency Phase-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.