Home / Browse projects / Palghar, Maharashtra / JAY VIJAY NAGARI NO 2

Registered No litigation declared Residential / Group Housing project

JAY VIJAY NAGARI NO 2

By SUMATINATH BUILDERS

RG-MH-50897 · RERA P99000008746 · Last updated on MahaRERA portal: 19 May 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
14 of 225Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

JAY VIJAY NAGARI NO 2 is a Residential / Group Housing project by SUMATINATH BUILDERS in Palghar, Maharashtra, registered with MahaRERA as P99000008746 on 19 Aug 2017. Possession is promised by 31 Jul 2028. 211 of the 225 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameJAY VIJAY NAGARI NO 2
  • TypeResidential / Group Housing
  • Location
    • VILLAGE NILEMORE
    • NALLASOPARA WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000008746
  • ReraGenie IDRG-MH-50897

Builder

  • NameSUMATINATH BUILDERS
  • Entity typePartnership
  • PartnersSUNDERLAL AKLINGLAL JAIN, DINESH SUNDERLAL JAIN, SHALIBHADRA HOUSING INFRASTRUCTURE PRIVATE LIMITED PRIVATE LIMITED
  • Other registrations3 more →
  • Past their filed date1

Key dates

this monthRegisteredAug 2017PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion31 Jul 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed115 files

Current status

94%211 of 225 units booked
99.4%Work done, per cost certificate

Figures as on 19 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JAY VIJAY NAGARI-NO 2- WING B-C-D-E-FNA47016164225

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

JAY VIJAY NAGARI-NO 2- WING B-C-D-E-F: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes93%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered37
Open Space5

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SAI DISHA DEVELOPERSVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI12493.41
Proposed, not sanctioned11,493 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBORIVALI WEST
Estimated costRs 35.62 cr
Cost incurredRs 35.40 cr
Work done99.38%
BuildingWingEstimatedIncurred
JAY VIJAY NAGARI-NO 2- WING B-C-D-E-FNARs 34.97 crRs 34.75 cr
-NARs 65.50 lakhRs 65.09 lakh

Certifying professionals and partners11

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA
ArchitectKusum Jain
EngineerSHILPLEKHA CONSULTANT
EngineerQamrul Hasan
EngineerSANTOSH MATA PRASAD MISHRA
Chartered AccountantLunawat& Vyas
Chartered AccountantR D LUKAD & CO
Chartered AccountantLunawat & Vyas Chartered Accountants
Chartered AccountantS M BHAT
Chartered AccountantNaveen Mehta
Chartered AccountantMUKESH M CHOKSI
PartnerRole in project
SUMATINATH BUILDERS-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000054655Rajkumar Pandey,Arun Kumar Yadav,Hemant Mishra,Vikrant Yadav,Laxmikant Upadhyay,Vaibhav ChaubeyM/S. SUMATINATH BUILDERS27/05/2018
CC006000000100315RAJKUMAR PANDEYM/S. SUMATINATH BUILDERS29/07/2019
CC006000000078568M/s. Sumatinath BuildersMrs. Rasila Ketan Jain20/03/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: JVN2 - Form 2A - 31-03-2026.pdf19 May 2026
Form 5 (FY 2024-2025)File: 8 JVN2 - Mukesh M Choksi - Form 5 - 31-03-2025.pdf16 May 2026
Form 5 (FY 2025-2026)File: 9 JVN2 - Mukesh M Choksi - Form 5 - 31-03-2026.pdf16 May 2026
Withdrawal Update Form 1File: 24 JVN2 - Form 1 - Kusum Jain - 31-03-2026.pdf1 May 2026
Withdrawal Update Form 2File: 24 JVN2 - Form 2 - Qamrul Hasan - 31-03-2026.pdf1 May 2026
Withdrawal Update Form 3File: JVN2 - Form 3 - SM Bhat - 31-03-2026.pdf1 May 2026
Withdrawal Update Form 1File: 22 JVN2 - Form 1 - Kusum Jain - 30-09-2025.pdf19 Feb 2026
Withdrawal Update Form 2File: 22 JVN2 - Form 2 - Qamrul Hasan - 30-09-2025.pdf19 Feb 2026
Withdrawal Update Form 3File: 12 JVN2 - Form 3 - SM Bhat - 30-09-2025_compressed.pdf19 Feb 2026
Withdrawal Update Form 1File: 23 JVN2 - Form 1 - Kusum Jain - 31-12-2025.pdf18 Feb 2026
Withdrawal Update Form 2File: 23 JVN2 - Form 2 - Qamrul Hasan - 31-12-2025.pdf18 Feb 2026
Withdrawal Update Form 3File: 13 JVN2 - Form 3 - SM Bhat - 31-12-2025_compressed.pdf18 Feb 2026
Withdrawal Update Form 1File: 21 JVN2 - Form 1 - Kusum Jain - 30-06-2025.pdf22 Nov 2025
Withdrawal Update Form 2File: 21 JVN2 - Form 2 - Qamrul Hasan - 30-06-2025.pdf22 Nov 2025
Withdrawal Update Form 3File: 11 JVN2 - Form 3 - SM Bhat - 30-06-2025.pdf22 Nov 2025
Form 2A (FY 2024-2025)File: 8 JVN2 - Santosh Mishra - Form 2A - 31-03-2025.pdf15 Jul 2025
Form 1File: 12 JVN2 - Form 1 - Kusum Jain - 31-03-2023.pdf14 Jul 2025
Form 2File: 12 JVN2 - Form 2 - Qamrul Hasan - 31-03-2023.pdf14 Jul 2025
Form 3File: 2 JVN2 - Form 3 - Lunawat Vyas - 31-03-2023.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 31-03-2023.pdf14 Jul 2025
Form 5 (FY 2022-2023)File: 6 JVN2 - Mukesh M Choksi - Form 5 - 31-03-2023.pdf12 Jul 2025
Form 5 (FY 2023-2024)File: 7 JVN2 - Mukesh M Choksi - Form 5 - 31-03-2024.pdf12 Jul 2025
Form 1File: 20 JVN2 - Form 1 - Kusum Jain - 31-03-2025.pdf10 Jul 2025
Form 2File: 20 JVN2 - Form 2 - Qamrul Hasan - 31-03-2025.pdf10 Jul 2025
Form 3File: 10 JVN2 - Form 3 - SM Bhat - 31-03-2025.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 31-03-2025.pdf10 Jul 2025
Form 1File: 19 JVN2 - Form 1 - Kusum Jain - 31-12-2024.pdf10 Jul 2025
Form 2File: 19 JVN2 - Form 2 - Qamrul Hasan - 31-12-2024.pdf10 Jul 2025
Form 3File: 9 JVN2 - Form 3 - SM Bhat - 31-12-2024.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 31-12-2024.pdf10 Jul 2025
Form 1File: 18 JVN2 - Form 1 - Kusum Jain - 30-09-2024.pdf10 Jul 2025
Form 2File: 18 JVN2 - Form 2 - Qamrul Hasan - 30-09-2024.pdf10 Jul 2025
Form 3File: 8 JVN2 - Form 3 - SM Bhat - 30-09-2024.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 30-09-2024.pdf10 Jul 2025
Form 1File: 17 JVN2 - Form 1 - Kusum Jain - 30-06-2024.pdf10 Jul 2025
Form 2File: 17 JVN2 - Form 2 - Qamrul Hasan - 30-06-2024.pdf10 Jul 2025
Form 3File: 7 JVN2 - Form 3 - SM Bhat - 30-06-2024.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 30-06-2024.pdf10 Jul 2025
Form 1File: 16 JVN2 - Form 1 - Kusum Jain - 31-03-2024.pdf10 Jul 2025
Form 2File: 16 JVN2 - Form 2 - Qamrul Hasan - 31-03-2024.pdf10 Jul 2025
Form 3File: 6 JVN2 - Form 3 - SM Bhat - 31-03-2024.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 31-03-2024.pdf10 Jul 2025
Form 1File: 15 JVN2 - Form 1 - Kusum Jain - 31-12-2023.pdf10 Jul 2025
Form 2File: 15 JVN2 - Form 2 - Qamrul Hasan - 31-12-2023.pdf10 Jul 2025
Form 3File: 5 JVN2 - Form 3 - SM Bhat - 31-12-2023.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 31-12-2023.pdf10 Jul 2025
Form 1File: 14 JVN2 - Form 1 - Kusum Jain - 30-09-2023.pdf10 Jul 2025
Form 2File: 14 JVN2 - Form 2 - Qamrul Hasan - 30-09-2023.pdf10 Jul 2025
Form 3File: 4 JVN2 - Form 3 - SM Bhat - 30-09-2023.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 30-09-2023.pdf10 Jul 2025
Form 1File: 13 JVN2 - Form 1 - Kusum Jain - 30-06-2023.pdf10 Jul 2025
Form 2File: 13 JVN2 - Form 2 - Qamrul Hasan - 30-06-2023.pdf10 Jul 2025
Form 3File: 3 JVN2 - Form 3 - SM Bhat - 30-06-2023.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - 30-06-2023.pdf10 Jul 2025
Form 2A (FY 2017-2018)File: JVN2 - Santosh Mishra - Form 2A - 31-03-2018.pdf3 Jul 2025
Form 2A (FY 2018-2019)File: JVN2 - Santosh Mishra - Form 2A - 31-03-2019.pdf3 Jul 2025
Form 2A (FY 2019-2020)File: JVN2 - Santosh Mishra - Form 2A - 31-03-2020.pdf3 Jul 2025
Form 2A (FY 2020-2021)File: JVN2 - Santosh Mishra - Form 2A - 31-03-2021.pdf3 Jul 2025
Form 2A (FY 2021-2022)File: JVN2 - Santosh Mishra - Form 2A - 31-03-2022.pdf3 Jul 2025
Form 2A (FY 2022-2023)File: JVN2 - Santosh Mishra - Form 2A - 31-03-2023.pdf3 Jul 2025
Form 2A (FY 2023-2024)File: JVN2 - Santosh Mishra - Form 2A - 31-03-2024.pdf3 Jul 2025
Form 5 (FY 2021-2022)File: 5 JVN2 - Lunawat Vyas - Form 5 - 31-03-2022.pdf3 Jul 2025
Form 5 (FY 2020-2021)File: 4 JVN2 - Lunawat Vyas - Form 5 - 31-03-2021.pdf3 Jul 2025
Form 5 (FY 2019-2020)File: 3 JVN2 - Lunawat Vyas - Form 5 - 31-03-2020.pdf3 Jul 2025
Form 5 (FY 2018-2019)File: 2 JVN2 - Lunawat Vyas - Form 5 - 31-03-2019.pdf3 Jul 2025
Form 5 (FY 2017-2018)File: 1 JVN2 - Naveen Mehta - Form 5 - 31-03-2018.pdf3 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Showcause Notice.pdf19 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Showcause Notice.pdf19 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Self Declaration for Bank Account Change - JVN2.pdf14 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Cum Undertaking on Letter Head - JVN2.pdf14 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Self Declaration for Showcause Notice - JVN2.pdf14 Jul 2023
Certificates of CA (Form 3)File: Form 3 Revised Final - 13-07-2023 compressed.pdf13 Jul 2023
Certificates of CA (Form 3)File: Form 3 Revised Final - 05-07-2023.pdf10 Jul 2023
Declaration about Commencement CertificateFile: Draft for Declaration about CC formate D.pdf6 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 31-03-2022.pdf6 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 31-03-2023.pdf6 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked Inventory.pdf6 Jul 2023
Certificates of CA (Form 3)File: Form 3.pdf6 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations - Sunderlalji.pdf6 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations - Dinesh Jain.pdf6 Jul 2023

How this compares with Palghar

94%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAY VIJAY NAGARI NO 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALLASOPARA WEST3,200+ in Palghar

2 kmJAY VIJAY NAGARI NO 2Completed 46Lapsed / revoked 32Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 150 registered projects within 2 km.

Builder: SUMATINATH BUILDERS

SUMATINATH BUILDERS has 4 registrations on MahaRERA, including JAY VIJAY NAGARI NO 1 and JAY VIJAY NAGARI NO 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if JAY VIJAY NAGARI NO 2 is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAY VIJAY NAGARI NO 2?

The registered promoter entity is SUMATINATH BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAY VIJAY NAGARI NO 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JAY VIJAY NAGARI NO 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JAY VIJAY NAGARI NO 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAY VIJAY NAGARI NO 2?

The professionals named in the filing: Architect: SANAT MEHTA; Architect: Kusum Jain; Engineer: SHILPLEKHA CONSULTANT; Engineer: Qamrul Hasan; Engineer: SANTOSH MATA PRASAD MISHRA; Chartered Accountant: Lunawat& Vyas. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAY VIJAY NAGARI NO 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAY VIJAY NAGARI NO 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAY VIJAY NAGARI NO 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.