Home / Browse projects / Palghar, Maharashtra / JAY MAA RESIDENCY PHASE 2

Registration lapsed No litigation declared Others project

JAY MAA RESIDENCY PHASE 2

By SURAJ MANGLAPRASAD MISHRA

RG-MH-29332 · RERA P99000029158 · Last updated on MahaRERA portal: 5 Aug 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 32 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
3 of 11Construction stages donefurthest along: Stilt Floor, 50%
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

JAY MAA RESIDENCY PHASE 2 is a Others project by SURAJ MANGLAPRASAD MISHRA in Palghar, Maharashtra, registered with MahaRERA as P99000029158 on 3 May 2021. Possession was promised by 20 Jun 2025 and is now 16 months past that date. The completion date has moved by 32 months from the original filing.

At a glance

Project

  • NameJAY MAA RESIDENCY PHASE 2
  • TypeOthers
  • Location
    • NAGZARI NAKA
    • BEHIND BHARAT PETROL PUMP
    • Nagzari
    • Palghar
    • 401501
  • Pincode401501
  • RERA no.P99000029158
  • ReraGenie IDRG-MH-29332

Builder

  • NameSURAJ MANGLAPRASAD MISHRA
  • Entity typeIndividual

Key dates

16 months past promisethis monthRegisteredMay 2021First promiseOct 2022Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 May 2021
  • Promised completion20 Jun 2025
  • Revised completionRevised to 20 Jun 2025 (originally 31 Oct 2022)
  • Buildings1 building record
  • Documents filed44 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
building no 5 A wingNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

building no 5 A wing: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered10
Open Space30

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area952 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MADHUKUMAR RAMDEV SHARMAVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI951.82
Proposed, not sanctioned952 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchH-2 Poonam Complex 89-93 Co-op Hsg Society Bldg No 92, Shanti Park, Mira Road East Thane 401107

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH SATGHARE
EngineerDINESH MESHRAM
Chartered AccountantANIL PARMAR
PartnerRole in project
SURAJ MANGLAPRASAD MISHRA-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000016651Oct 2022 → Apr 2024

Reason as filed by the promoterWe are applying for extension due to the lack of funds, and delay in approval from the concerned authority and we have some unsold inventory which needs to be sell but we are not able to sell those inventory because of the project expiry.

EXT99000012782Oct 2022 → Apr 2023

Reason as filed by the promoterDue to covid selling was goes down And recently last 5 month RBI was increase finance rate of interest.

EXT99000024446Oct 2022 → Jun 2025

Reason as filed by the promoterWe could not complete our project on time due to financial issues and other factors have affected the project, hence we have taken 100% consent from purchaser for further extension of our project till 20/6/2025. Sir, to complete the project materials is important aspect and we have shortage of material due to financial issues. The sales of our project was down and we could not generate finance. Our project is 95% completed and we need time for completion till 20th June 2025. We assure you that we will complete the project on time hence we humbly request you to grant extension for our project t

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1) QPR.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) QPR.pdf5 Aug 2024
CERSAI detailsFile: CERSAI_Search_Report_200316047756_For_Asset_Based_Search_05_08_2024_15_45_26_372.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate on Project Cost Fund withdrawal Form 3 QPR.pdf5 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory .pdf30 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION ABOUT BANK ACCOUNT .pdf30 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 (2022-23) jay maa.pdf29 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 (2023-24) Jay Maa.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Jay maa.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf24 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf24 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf24 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jay Maa Developers Form 3_compressed.pdf24 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN JAY MAA.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf31 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance.pdf31 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality Assurance.pdf31 May 2023
Declaration in FORM BFile: Form-B Madhu Kumar Sharma .pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect Certificate.pdf24 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf24 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory.pdf18 May 2023
Declaration about Commencement CertificateFile: Declaration Commencement certificate.pdf1 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Structural engineer report.pdf1 Nov 2022
Disclosure of sold/ booked inventoryFile: Declaration sold inventory .pdf1 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020-21.pdf1 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021-22.pdf1 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022-23.pdf1 Nov 2022
Other - TechnicalFile: self declaration- resolution.pdf1 Nov 2022
Declaration in FORM BFile: Form B-compressed Deepak Sharma.pdf29 Apr 2021
Proforma of Allotment letterFile: Jay Maa Residency Phase -II-converted-compressed (1).pdf29 Apr 2021
Copy of the legal title reportFile: Format A Legal Title Report.pdf28 Apr 2021
Declaration in FORM BFile: Form B Prabhu Ji-compressed.pdf28 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Apr 2021
Proforma of Allotment letterFile: RERA ALLOTMEBNT BLDG NO 5.pdf9 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4FCEC0F8-9737-4FBD-B342-4B313FB119C4-converted-min (1).pdf22 Mar 2021
Building plan approvalFile: MYSCAN_20210218_0001.PDF19 Feb 2021
PAN CardFile: pan card.pdf19 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20210218_0001.PDF19 Feb 2021
Declaration in FORM BFile: affidavit_compressed.pdf19 Feb 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: rcc engineer_compressed.pdf19 Feb 2021
Layout approvalFile: MYSCAN_20210218_0002.PDF18 Feb 2021
Details of encumbrancesFile: PNG image 16-converted.pdf18 Feb 2021
Copy of Layout Approval (in case of layout)File: MYSCAN_20210218_0002.PDF18 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect letter-compressed (1).pdf18 Feb 2021

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 32 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAY MAA RESIDENCY PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND BHARAT PETROL PUMP3,200+ in Palghar

Builder: SURAJ MANGLAPRASAD MISHRA

SURAJ MANGLAPRASAD MISHRA has 1 registration on MahaRERA, including JAY MAA RESIDENCY PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that JAY MAA RESIDENCY PHASE 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if JAY MAA RESIDENCY PHASE 2 is delayed beyond 20 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAY MAA RESIDENCY PHASE 2?

The registered promoter entity is SURAJ MANGLAPRASAD MISHRA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAY MAA RESIDENCY PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAY MAA RESIDENCY PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAY MAA RESIDENCY PHASE 2?

The professionals named in the filing: Architect: RAJESH SATGHARE; Engineer: DINESH MESHRAM; Chartered Accountant: ANIL PARMAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAY MAA RESIDENCY PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAY MAA RESIDENCY PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAY MAA RESIDENCY PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.