Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
24 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

JANKI PARK BUILDING NO 3 is a Residential / Group Housing project by JANKI DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000078780 on 13 Jan 2025. Possession is promised by 30 May 2027. 4 of the 28 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameJANKI PARK BUILDING NO 3
  • TypeResidential / Group Housing
  • Location
    • NEAR KARDAL PETROL PUMP
    • PALGHAR ROAD
    • SAPHALE EAST
    • Saphale
    • Palghar
    • 401102
  • Pincode401102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000078780
  • ReraGenie IDRG-MH-23468

Builder

  • NameJANKI DEVELOPERS
  • Entity typePartnership
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2025PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2025
  • Promised completion30 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

14%4 of 28 units booked
82.7%Work done, per cost certificate

Figures as on 15 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SECTOR 1 BUILDING NO 3 -RAJANI HILLSno wing8828028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SECTOR 1 BUILDING NO 3 -RAJANI HILLS · wing no wing: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area817 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Aug 2025
LandownerVillageDistrict
S S CORPORATIONSaphalePalghar

Approvals and building plan

Sanctioning authorityCollector
Permissible FSI1231.08
Proposed, not sanctioned1,231 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRADHA CHANDRA HERITAGE, TANDULWADI ROAD, NEAR MSEB OFFICE, SAPHALE EAST, TAL. PALGHAR, DIST. PALGHAR 401102
Estimated costRs 2.74 cr
Cost incurredRs 2.27 cr
Work done82.71%
BuildingWingEstimatedIncurred
SECTOR 1 BUILDING NO 3 -RAJANI HILLSno wingRs 2.24 crRs 2.02 cr
-NARs 50.00 lakhRs 25.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRoshan Patil
EngineerMohammed Bhati
Chartered AccountantAshvin Thumar
Chartered AccountantHitesh Gondaliya
PartnerRole in project
JANKI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 May 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 BLD 3 31032026.pdf15 Aug 2026
Withdrawal Update Form 1File: FORM 1 BLD 3 Q1.pdf15 Aug 2026
Withdrawal Update Form 2File: FORM 2 BLD 3 Q4.pdf15 Aug 2026
Withdrawal Update Form 2File: FORM 2 BLD 3 Q1.pdf15 Aug 2026
Withdrawal Update Form 3File: BUILDING 3 Q4 FORM3pdf-FINAL.pdf15 Aug 2026
Withdrawal Update Form 3File: BUILDING 3 Q1 FORM3pdf- FINALpdf FINAL.pdf15 Aug 2026
Withdrawal Update Form 1File: FORM 1 Q1 RAJANI HILLS.pdf5 Aug 2026
Withdrawal Update Form 1File: FORM 1 Q1 RAJANI HILLS.pdf5 Aug 2026
Withdrawal Update Form 1File: FORM 1 Q1 RAJANI HILLS.pdf5 Aug 2026
Withdrawal Update Form 2File: FORM 2 Q1 RAJANI HILLS.pdf5 Aug 2026
Withdrawal Update Form 2File: FORM 2 Q1 RAJANI HILLS.pdf5 Aug 2026
Withdrawal Update Form 2File: FORM 2 Q1 RAJANI HILLS.pdf5 Aug 2026
Withdrawal Update Form 3File: BUILDING 3 Q4 FORM3pdf-FINAL.pdf5 Aug 2026
Withdrawal Update Form 3File: BUILDING 3 Q1 FORM3pdf- FINAL.pdf5 Aug 2026
Withdrawal Update Form 3File: BUILDING 3 Q1 FORM3pdf- FINALpdf FINAL.pdf5 Aug 2026
Withdrawal Update Form 1File: FORM 1 Q1 RAJANI HILLS.pdf4 Aug 2026
Withdrawal Update Form 2File: FORM 2 Q1 RAJANI HILLS.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 - Dec 2025 Janki Developers (2).pdf4 Aug 2026
Withdrawal Update Form 1File: FORM 1 Q3 BLD NO 3.pdf4 Mar 2026
Withdrawal Update Form 2File: Form 2 BLD 3 Q3.pdf4 Mar 2026
Withdrawal Update Form 3File: Form 3 - Dec 2025 Janki Developers (2).pdf4 Mar 2026
Withdrawal Update Form 1File: FORM 1 Q3 BLD NO 3.pdf22 Feb 2026
Withdrawal Update Form 1File: Form 1 BLD 3 Q2.pdf22 Feb 2026
Withdrawal Update Form 2File: Form 2 BLD 3 Q3.pdf22 Feb 2026
Withdrawal Update Form 2File: Form 2 BLD 3 Q2.pdf22 Feb 2026
Withdrawal Update Form 3File: Form3 June25.pdf22 Feb 2026
Withdrawal Update Form 3File: Form 3 - September 2025.pdf22 Feb 2026
Withdrawal Update Form 1File: Form 1 BLD 3 Q1.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1 BLD 3 Q1.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1 BLD 3 Q2.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2 BLD 3 Q1.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2 BLD 3 Q1.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2 BLD 3 Q2.pdf14 Feb 2026
Withdrawal Update Form 3File: land cost clarification.pdf14 Feb 2026
Withdrawal Update Form 3File: land cost clarification.pdf14 Feb 2026
Withdrawal Update Form 3File: land cost clarification.pdf14 Feb 2026
Form 1File: FORM - 1.pdf17 Jan 2026
Form 2File: FORM - 2.pdf17 Jan 2026
Form 3File: FORM 3.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD OR BOOKING INVENTORY (3) (1).pdf17 Jan 2026
Form 5 (FY 2024-2025)File: RERA FORM - 5.pdf1 Oct 2025
Withdrawal Update Form 1File: form bldg3 30062025.pdf29 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf29 Sep 2025
Withdrawal Update Form 3File: land cost clarification.pdf29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1.pdf11 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3.pdf11 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf11 May 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION-AGREEMENT.pdf23 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A REVISED.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: land cost clarification.pdf1 Dec 2024
Proforma of Agreement for saleFile: AFS.pdf1 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B REVISED.pdf1 Dec 2024
Copy of the legal title reportFile: REPORT KARDAL_11zon (1).pdf13 Nov 2024
Declaration in FORM BFile: FORM B-BLDG 3- OWNER.pdf9 Nov 2024
Building plan approvalFile: blueptint highlighted.pdf6 Nov 2024
Layout approvalFile: layout with plot area.pdf6 Nov 2024
Copy of Layout Approval (in case of layout)File: layout with plot area.pdf6 Nov 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf6 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: blueptint highlighted.pdf6 Nov 2024
Declaration about Commencement CertificateFile: FORM D.pdf6 Nov 2024
CERSAI detailsFile: CERSAI.pdf6 Nov 2024
Other - TechnicalFile: 50-2024.pdf6 Nov 2024
Other - TechnicalFile: CC VERIFICATION_compressed.pdf6 Nov 2024
Other - TechnicalFile: Gmail - cc Issued by Collector Palghar at village Kardal order date 21 Aug 2024.pdf6 Nov 2024
Other - TechnicalFile: PLOT AREA DECLARATION.pdf6 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF FINANCE AVAILED.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 revised 2.pdf4 Nov 2024
PAN CardFile: Janki Pan Card.pdf12 Oct 2024
Details of encumbrances concerned to FinanceFile: LOE-FINANCE.pdf12 Oct 2024
Details of encumbrances concerned to FinanceFile: Letter of encumbrance - Legal.pdf12 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report- Allotment Letter .pdf12 Oct 2024
Details of encumbrances concerned to LegalFile: LOE-FINANCE.pdf12 Oct 2024
Details of encumbrances concerned to LegalFile: Letter of encumbrance - Legal.pdf12 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Amir Gavankar.pdf12 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Shraddha Pawar .pdf12 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Vidhika Gaikwad .pdf12 Oct 2024

How this compares with Palghar

14%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JANKI PARK BUILDING NO 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALGHAR ROAD, SAPHALE EAST3,200+ in Palghar

2 kmJANKI PARK BUILDING NO 3Completed 22Lapsed / revoked 7Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: JANKI DEVELOPERS

JANKI DEVELOPERS has 4 registrations on MahaRERA, including Monika Residency and JANKI PARK BUILDING NO 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if JANKI PARK BUILDING NO 3 is delayed beyond 30 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JANKI PARK BUILDING NO 3?

The registered promoter entity is JANKI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JANKI PARK BUILDING NO 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JANKI PARK BUILDING NO 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JANKI PARK BUILDING NO 3?

The professionals named in the filing: Architect: Roshan Patil; Engineer: Mohammed Bhati; Chartered Accountant: Ashvin Thumar; Chartered Accountant: Hitesh Gondaliya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JANKI PARK BUILDING NO 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JANKI PARK BUILDING NO 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JANKI PARK BUILDING NO 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.