ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Jaliyan Heights Goregaon

Completed No litigation declared Others project

Jaliyan Heights Goregaon

By Jaliyan Developer

RG-MH-97722 · RERA P51800012880 · Last updated on MahaRERA portal: 12 Apr 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 95%
2Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Jaliyan Heights Goregaon is a Others project by Jaliyan Developer in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012880 on 7 Sep 2017. The registration is recorded completed; possession was promised by 30 Dec 2024. The completion date has moved by 24 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameJaliyan Heights Goregaon
  • TypeOthers
  • Location
    • Aarey Road
    • Goregaon East
    • Borivali
    • Mumbai Suburban
    • 400063
  • Pincode400063
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012880
  • ReraGenie IDRG-MH-97722

Builder

  • NameJaliyan Developer
  • Entity typePartnership
  • PartnerPremila R Thakkar
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2017First promiseDec 2022Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Sep 2017
  • Promised completion30 Dec 2024
  • Revised completionRevised to 30 Dec 2024 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Jaliyan Heights Goregaon Phase 1NA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Jaliyan Heights Goregaon Phase 1: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 12 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,190 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2810.41
Proposed, not sanctioned1,186 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMALAD WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRasik Hingoo
EngineerJayesh Shah
Chartered AccountantVipul M Gharpure
PartnerRole in project
Jaliyan Developer-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800011562Dec 2022 → Dec 2023

Reason as filed by the promoterDCCO of the project is proposed to be extended by 12 months i.e. from 30/12/2022 to 30/12/2023 on account of delay in getting approval for further floors due to 2nd wave of Covid-19

EXT51800018325Dec 2022 → Dec 2024

Reason as filed by the promoterDCCO of the project is proposed to be extended by 12 months i.e. from 30/12/2023 to 30/12/2024 on account of delay in getting approval for further floors & currently we had completed the whole building RCC work , Internal & External work and our project will be completed in almost more than 7 to 8 month so please accept our extension request for 1 year.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000303322KUNDANMAL KOTHARIJALIYAN DEVELOPERS14/11/2022
CC12501659POOJA SANJAY MISHRAJaliyan Developer22/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2025

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_signed.pdf12 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf27 Jan 2025
Certificates of CA (Form 3)File: CA Certificate Form 3.pdf27 Jan 2025
Certificates of CA (Form 3)File: CA Certificate-Form3.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A New Formate.pdf7 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_compressed.pdf2 Mar 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Goregaon.pdf2 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Goregaon Form 5.pdf2 Mar 2024
Declaration in FORM BFile: Form B Affidavit Jaliyan Heights Goregaon.pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Jaliyan Heights Goregaon FY 22 23.pdf19 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1.pdf17 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form2.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Form 2A ( Mar 23 ).pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Form 2A ( Sep 23 ).pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory.pdf17 Feb 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf21 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Jaliyan Heights Goregaon CC 14th Upper.pdf11 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jaliyan Height Goregaon Architect certificate for Rera 14 (1).pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate form 2.pdf11 Aug 2023
Certificates of CA (Form 3)File: Jaliyan Height Goregaon Form 3 CA certificate.pdf11 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate for Rera 13 Form 1 ( Oct 22 to Dec 22 ).pdf4 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 ( Oct 22 to Dec 22 ).pdf4 Mar 2023
Certificates of CA (Form 3)File: CA Certificate Rera Form 3 ( Oct 22 to Dec 22 ).pdf4 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5.pdf23 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate for Rera Form 1.pdf18 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 RERA.pdf18 Nov 2022
Certificates of CA (Form 3)File: CA Form 3 Goregaon.pdf18 Nov 2022
Certificates of CA (Form 3)File: CA RERA Goregaon Form 3 ( Sep 22 ).pdf18 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Form 1 for Rera Goregaon Site_compressed.pdf8 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate of Goregaon site-compressed.pdf8 Jun 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Units.pdf8 Jun 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate goregaon site_compressed_compressed (2) (1).pdf8 Jun 2022
Declaration in FORM BFile: Form B Declaration.pdf26 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold Inventory.pdf17 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure for Flats Goregaon.pdf13 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Goregaon New Third FurtherCC_signed.pdf28 Mar 2022
Declaration about Commencement CertificateFile: Declaration About CC Format D ( Goregaon ).pdf28 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Goregaon Architect Certificate-10_compressed.pdf28 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect certificate for Rera 11.pdf28 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Goregaon Engineer Certificate-10_compressed.pdf28 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate-11_compressed (1).pdf28 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate-1.pdf28 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate-3.pdf28 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200233620781_For_Asset_Based_Search_28_03_2022_14_44_03_662.pdf28 Mar 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked Unsold Goregaon.pdf28 Mar 2022
Certificates of CA (Form 3)File: 11th CA RERA certificate Goregaon_compressed.pdf28 Mar 2022
Certificates of CA (Form 3)File: Form 3 Goregaon RERA CA Certifictate-_compressed_compressed.pdf28 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 goregaon 2021-2022.pdf28 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-2021 Jaliyan Heights Goregaon.pdf31 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate-9 Goregaon.pdf10 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-9 Goregaon.pdf10 May 2021
Certificates of CA (Form 3)File: 9th RERA CA Certificate Jul-Sep-20_compressed-compressed.pdf10 May 2021
Certificates of CA (Form 3)File: 10th RERA CA Certificate Oct-Dec-20-compressed (1).pdf10 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Goregaon Architect certificate for Rera 8.pdf28 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 Goregaon Engineer Certificate-8-compressed.pdf28 Sep 2020
Certificates of CA (Form 3)File: From 3 CA Certificate-compressed.pdf28 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-7 (1).pdf18 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-7-compressed.pdf18 Feb 2020
Certificates of CA (Form 3)File: CA Certificate-7-compressed.pdf18 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Goregaon Architect Certificate-6.pdf9 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Goregaon Engineer Certificate 6th RERA.pdf9 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Goregaon Engineer Certificate 6th RERA.pdf9 Dec 2019
Certificates of CA (Form 3)File: Jaliyan Heights Goregaon Q2 - 19-20.pdf9 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Jaliyan Heights Goregaon.pdf9 Dec 2019
Details of encumbrancesFile: Scan Copy of Non Encumbrance Certificate.pdf17 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5th Architect Certificate of Goregaon.pdf3 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5th Engineer Certificate of Goregaon_compressed.pdf3 Sep 2019
Certificates of CA (Form 3)File: CA Certificate-5_compressed.pdf3 Sep 2019
Certificates of CA (Form 3)File: 4th CA Certificate- Form 3_.pdf5 Jun 2019
Certificates of CA (Form 3)File: CA Certificate-Q4 - SIGNED_compressed.pdf5 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4th Architect Certificate Form 1.pdf6 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3rd Engineer certificate form 2.pdf6 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4th Engineer Certificate Form 2_.pdf6 May 2019
Certificates of CA (Form 3)File: CA Certificate-2 Form 3.pdf6 May 2019
Proforma of Allotment letterFile: Performa of Printed Sale Agreement-Rera Agreement-Final.pdf6 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 2.pdf29 Apr 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jaliyan Heights Goregaon on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon East6,700+ in Mumbai Suburban

2 kmJaliyan Heights GoregaonCompleted 143Lapsed / revoked 71Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 348 registered projects within 2 km.

Builder: Jaliyan Developer

Jaliyan Developer has 3 registrations on MahaRERA, including Jaliyan Heights Borivali and Jaliyan Heights Goregaon. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Jaliyan Heights Goregaon is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jaliyan Heights Goregaon?

The registered promoter entity is Jaliyan Developer, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jaliyan Heights Goregaon?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Jaliyan Heights Goregaon?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Jaliyan Heights Goregaon?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jaliyan Heights Goregaon?

The professionals named in the filing: Architect: Rasik Hingoo; Engineer: Jayesh Shah; Chartered Accountant: Vipul M Gharpure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jaliyan Heights Goregaon?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jaliyan Heights Goregaon. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jaliyan Heights Goregaon to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.