Home / Browse projects / Nagpur, Maharashtra / JALARAM MANGALAM
JALARAM MANGALAM
RG-MH-01563 · RERA P50500009887 · Last updated on MahaRERA portal: 6 Jul 2023
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
JALARAM MANGALAM is a Others project by SHRI JALARAM DUGDHA KENDRA in Nagpur, Maharashtra, registered with MahaRERA as P50500009887 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameJALARAM MANGALAM
- TypeOthers
- Location
- HINGNA ROAD
- HINGNA
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440016
- Pincode440016
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500009887
- ReraGenie IDRG-MH-01563
Builder
- NameSHRI JALARAM DUGDHA KENDRA
- Entity typePartnership
- PartnersDHARMENDRA KATARIA, YOGESH KATARIA, KANTILAL KATARIA, NILESH KATARIA, SANJAY KATARIA, CHAYABEN KATARIA, VINAL KATARIA, MANHARLAL KATARIA, VASUMATI KATARIA, KETAN KATARIA, BHARAT KATARIA
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Aug 2017
- Promised completion30 Dec 2022
- Revised completionRevised to 30 Dec 2022 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed51 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| JALARAM MANGALAM | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
JALARAM MANGALAM: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ravi Sonkusare |
| Architect | SANDEEP PANDIT ARCHITECTS |
| Engineer | Devesh H Warhade |
| Chartered Accountant | CA Kavita Loya |
| Chartered Accountant | CA Sajjad Rasul |
| Partner | Role in project |
|---|---|
| SHRI JALARAM DUGDHA KENDRA | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterExplanatory Notes for Extension of Registration 1) There has been a delay in the completion of the Project as the Covid-19 pandemic has resulted in shortage of manpower as all the daily waged construction workers had gone back to their native villages/places in April 2020. Following which, all the construction work had come to an absolute stop. Once they came back in the month of Oct/Nov 2020 we were hit by the problem of shortage of raw material caused due to disruption in the supply chain at national level. Also, there was shortage for a prolonged period and by the time we were assured of re
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC004000000030372 | Kunal Prashant Dashottar | Jalaram Dugdha Kendra | 05/06/2022 |
| CC004000000030403 | Kunal Prashant Dashottar | Jalaram Dugdha Kendra | 08/07/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jul 2023
Documents filed51
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy 2 JM.pdf | 6 Jul 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 3 JM (Residency).pdf | 6 Jul 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: by laws Annexture B Commercial_compressed.pdf | 6 Jul 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: by laws Annexture B Residencial_compressed.pdf | 6 Jul 2023 |
| CERSAI detailsFile: CERSAI Letter.pdf | 7 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Sold unsold - By Management.pdf | 7 Jan 2022 |
| Declaration about Commencement CertificateFile: Format D.pdf | 5 Jan 2022 |
| Certificates of CA (Form 3)File: Jalaram-Form3-Q1-20-21_compressed.pdf | 3 Jan 2022 |
| Certificates of CA (Form 3)File: Jalaram-Form3-Q2-20-21_compressed.pdf | 3 Jan 2022 |
| Certificates of CA (Form 3)File: Jalaram-Form3-Q3-20-21_compressed.pdf | 3 Jan 2022 |
| Certificates of CA (Form 3)File: Jalaram-Form3-Q4-20-21_compressed.pdf | 3 Jan 2022 |
| Certificates of CA (Form 3)File: Jalaram-Form3-Q1-21-22_compressed.pdf | 3 Jan 2022 |
| Certificates of CA (Form 3)File: Jalaram-Form3-Q2-21-22_compressed.pdf | 3 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Jalaram-Form5-2020-21.pdf | 3 Jan 2022 |
| PAN CardFile: PAN JDK.pdf | 14 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf | 14 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A.pdf | 14 Aug 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part occupancy.pdf | 13 Aug 2021 |
| Certificates of CA (Form 3)File: Jalaram Form 3-Q3-18-19_compressed.pdf | 15 Jun 2021 |
| Certificates of CA (Form 3)File: Jalaram Form 3-Q4-18-19_compressed.pdf | 15 Jun 2021 |
| Certificates of CA (Form 3)File: Jalaram Form 3-Q1-19-20_compressed.pdf | 15 Jun 2021 |
| Certificates of CA (Form 3)File: Jalaram Form 3-Q2-19-20_compressed.pdf | 15 Jun 2021 |
| Certificates of CA (Form 3)File: Jalaram Form 3-Q3-19-20_compressed.pdf | 15 Jun 2021 |
| Certificates of CA (Form 3)File: Jalaram Form 3-Q4-19-20_compressed.pdf | 15 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Jalaram Form-5-18-19.pdf | 15 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Jalaram Form-5-19-20.pdf | 15 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jalamram Mangalam.pdf | 29 Nov 2019 |
| Certificates of CA (Form 3)File: Form 3 31032018 Compressed.pdf | 16 Jan 2019 |
| Certificates of CA (Form 5)File: scan0070.pdf | 14 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates-1.pdf | 9 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates-2.pdf | 9 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates-2.pdf | 9 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates-3.pdf | 9 Apr 2018 |
| OtherFile: Other-NA certificate.pdf | 9 Apr 2018 |
| Layout approvalFile: layout plan.pdf | 29 Jul 2017 |
| Building plan approvalFile: Sanction plan.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Search Report-2.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Search Report-1.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Self_Declaration_-_unencumbrance.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: layout plan.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: Sanction plan.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Form B-19082017.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate-1.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: Chartered Accountant Form-3-2.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: Chartered Accountant Form-3-1.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 51 filed documents as one ZIP, foldered, with a manifest
Keep JALARAM MANGALAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HINGNA2,800+ in Nagpur
Filed coordinates, straight-line distance. 31 registered projects within 2 km.
Sunrise Park
Sirsikar Developers & Builders Pvt. Ltd.
SHIVAJI KINGDOM CITY-3
SHIVAJI TOWNS INFRACON
PRATEEK NAIDU INDUSTRIAL PARK
VIJAY PRABHAKARRAO NAIDU
SILVER STAR 3
TIRUPATI DEVELOPERS
SHIVAJI KINGDOM CITY-2
SHIVAJI HOMES INFRA
Sumangal Vihar
Sunil Laddhad & Nimish Laddhad (AOP)
See every Nagpur project, with the district possession charts
Builder: SHRI JALARAM DUGDHA KENDRA
SHRI JALARAM DUGDHA KENDRA has 1 registration on MahaRERA, including JALARAM MANGALAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if JALARAM MANGALAM is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of JALARAM MANGALAM?
The registered promoter entity is SHRI JALARAM DUGDHA KENDRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in JALARAM MANGALAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against JALARAM MANGALAM?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for JALARAM MANGALAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at JALARAM MANGALAM?
The professionals named in the filing: Architect: Ravi Sonkusare; Architect: SANDEEP PANDIT ARCHITECTS; Engineer: Devesh H Warhade; Chartered Accountant: CA Kavita Loya; Chartered Accountant: CA Sajjad Rasul. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JALARAM MANGALAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback