Home / Browse projects / Nagpur, Maharashtra / PRATEEK NAIDU INDUSTRIAL PARK
PRATEEK NAIDU INDUSTRIAL PARK
RG-MH-53013 · RERA P50500015828 · Last updated on MahaRERA portal: 12 Aug 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 17 months past the filed date
- Completion date moved by 28 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRATEEK NAIDU INDUSTRIAL PARK is a Plotted project by VIJAY PRABHAKARRAO NAIDU in Nagpur, Maharashtra, registered with MahaRERA as P50500015828 on 27 Mar 2018. Possession was promised by 31 May 2025 and is now 17 months past that date. The completion date has moved by 28 months from the original filing. 78 of the 98 units on this registration are recorded sold or booked.
At a glance
Project
- NamePRATEEK NAIDU INDUSTRIAL PARK
- TypePlotted
- Location
- Hingna Road
- Hingna MIDC
- Nildoh
- Hingna
- Nagpur
- 440016
- Pincode440016
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500015828
- ReraGenie IDRG-MH-53013
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Mar 2018
- Promised completion31 May 2025
- Revised completionRevised to 31 May 2025 (originally 5 Jan 2023)
- BuildingsNot stated in filing
- Documents filed74 files
Current status
Figures as on 12 Aug 2024, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 12 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Vijay Naidu | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PAWAN GUPTA |
| Engineer | M D Construction |
| Chartered Accountant | Nachiket Dhandekar |
| Chartered Accountant | Shikha Kodwani |
| Partner | Role in project |
|---|---|
| VIJAY PRABHAKARRAO NAIDU | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Pandemic Deadlines were not meet
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Mar 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IP Form 1 30062024.pdf | 12 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IP Form 2 300062024.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Form 3 IP 30062024.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: IP Sold Unsold 30062024.pdf | 12 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 IP 30062024.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: IP From5 - FY 21-22.pdf | 7 Aug 2024 |
| Certificates of CA (Form 3)File: 1 From-3PNIP 31 Dec 2022.pdf | 7 Aug 2024 |
| Certificates of CA (Form 3)File: 2 From-3PNIP 31 March 2023.pdf | 7 Aug 2024 |
| Certificates of CA (Form 3)File: 3 From-3PNIP 30 June 2023.pdf | 7 Aug 2024 |
| Certificates of CA (Form 3)File: 4 From-3PNIP 30 Sep 2023.pdf | 7 Aug 2024 |
| Certificates of CA (Form 3)File: 5 From-3PNIP 31 Dec 2023.pdf | 7 Aug 2024 |
| Certificates of CA (Form 3)File: 6 From-3PNIP31march2024.pdf | 7 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: IP From-5 2019-2020.pdf | 7 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: IP From5 - FY 19-20.pdf | 7 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: IP From5 - FY 20-21.pdf | 7 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: IP From5 - FY 21-22.pdf | 7 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: IP From5 - FY 22-23.pdf | 7 Aug 2024 |
| Certificates of CA (Form 3)File: 1 Form 3 PNIP March'24.pdf | 3 Jul 2024 |
| Certificates of CA (Form 3)File: Reconcillation of Table C.pdf | 3 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 3 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A Declaration Cum Undertaking.pdf | 3 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Self Declaration for Change In Bank.pdf | 3 Jul 2024 |
| Declaration in FORM BFile: Form B forExtension.pdf | 2 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Industrial Park.pdf | 28 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 28 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance to Legal.pdf | 15 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance to Finance.pdf | 15 Jun 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance to Legal.pdf | 15 Jun 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance to Finance.pdf | 15 Jun 2024 |
| Declaration about Commencement CertificateFile: Format D Declaration of Commencement.pdf | 15 Jun 2024 |
| Declaration in FORM BFile: Form B.pdf | 15 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31032024.pdf | 15 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31032024.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 31032020.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31032021.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31032022.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31032023.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 31032024.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 1 IP Sold Unsold Dec'22.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 2 IP Sold Unsold Mar'23.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 3 IP Sold Unsold June'23.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 4 IP Sold Unsold Sept'23.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 5 IP Sold Unsold Dec'23.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 6 IP Sold Unsold Mar'24.pdf | 15 Jun 2024 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 15 Jun 2024 |
| Certificates of CA (Form 3)File: (1) Form 3 PNIP Dec'22.pdf | 15 Jun 2024 |
| Certificates of CA (Form 3)File: (2) Form 3 PNIP March'23.pdf | 15 Jun 2024 |
| Certificates of CA (Form 3)File: (3) Form 3 PNIP June'23.pdf | 15 Jun 2024 |
| Certificates of CA (Form 3)File: (4) Form 3 PNIP Sept'23.pdf | 15 Jun 2024 |
| Certificates of CA (Form 3)File: (5) Form 3 PNIP Dec'23.pdf | 15 Jun 2024 |
| Certificates of CA (Form 3)File: (6) Form 3 PNIP March'24.pdf | 15 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 15 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020.pdf | 15 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf | 15 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf | 15 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2023.pdf | 15 Jun 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation to Allotment Letter.pdf | 15 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation to Agreement of Sale.pdf | 15 Jun 2024 |
| OtherFile: Declaration On Going Project.pdf | 21 Mar 2018 |
| Building plan approval or NA orderFile: Sanctioned MAP-Plan.pdf | 20 Mar 2018 |
| Layout approvalFile: Layout Approval Old.pdf | 20 Mar 2018 |
| Layout approvalFile: Layout Approval New.pdf | 20 Mar 2018 |
| PAN CardFile: Pan Card Vijay Naidu.pdf | 20 Mar 2018 |
| Copy of the legal title reportFile: POA For Vijay Naidu (RF).pdf | 20 Mar 2018 |
| Details of encumbrancesFile: Details of Encumbrances.pdf | 20 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: Layout Approval Old.pdf | 20 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: Layout Approval New.pdf | 20 Mar 2018 |
| Building Plan Approval (IOD)File: Sanctioned MAP-Plan.pdf | 20 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Annexure-B.pdf | 20 Mar 2018 |
| Declaration in FORM BFile: FORM-B.pdf | 20 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Architect Certificate.pdf | 20 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engineer Certificate.pdf | 20 Mar 2018 |
| Certificates of CA (Form 3)File: Form 3-CA Certificate.pdf | 20 Mar 2018 |
| Proforma of Allotment letterFile: Drfat Sale Deed for Prateek Infrastructure for RERA.pdf | 20 Mar 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Prateek Naidu Residential ParkP50500034446 | Hingana, Nagpur | 44 | Apr 2022 | Completed | Apr 2025 | Sep 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PRATEEK NAIDU INDUSTRIAL PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hingna MIDC2,800+ in Nagpur
Filed coordinates, straight-line distance. 33 registered projects within 2 km.
Sunrise Park
Sirsikar Developers & Builders Pvt. Ltd.
SHIVAJI KINGDOM CITY-3
SHIVAJI TOWNS INFRACON
SILVER STAR 3
TIRUPATI DEVELOPERS
SHIVAJI KINGDOM CITY-2
SHIVAJI HOMES INFRA
Sumangal Vihar
Sunil Laddhad & Nimish Laddhad (AOP)
ARCTIC
Dhuni Constructions Pvt. Ltd.
See every Nagpur project, with the district possession charts
Builder: VIJAY PRABHAKARRAO NAIDU
VIJAY PRABHAKARRAO NAIDU has 3 registrations on MahaRERA, including PRATEEK NAIDU INDUSTRIAL PARK and Prateek Naidu Residential Park. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that PRATEEK NAIDU INDUSTRIAL PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PRATEEK NAIDU INDUSTRIAL PARK is delayed beyond 31 May 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRATEEK NAIDU INDUSTRIAL PARK?
The registered promoter entity is VIJAY PRABHAKARRAO NAIDU, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRATEEK NAIDU INDUSTRIAL PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRATEEK NAIDU INDUSTRIAL PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRATEEK NAIDU INDUSTRIAL PARK?
The professionals named in the filing: Architect: PAWAN GUPTA; Engineer: M D Construction; Chartered Accountant: Nachiket Dhandekar; Chartered Accountant: Shikha Kodwani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRATEEK NAIDU INDUSTRIAL PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback