Home / Browse projects / Raigarh, Maharashtra / JAI MALHAR APARTMENT

Registration lapsed No litigation declared Residential / Group Housing project

JAI MALHAR APARTMENT

By Gajanan Shyamrao Khabale

RG-MH-69054 · RERA P52000018661 · Last updated on MahaRERA portal: 2 May 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 55 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2022Possession promised55 months past this date
5 of 55Construction stages doneacross 5 buildings; furthest along: Stilt Floor, 98%
0Complaints at MahaRERAon this registration
Jump to the 171 documents Report an error

JAI MALHAR APARTMENT is a Residential / Group Housing project by Gajanan Shyamrao Khabale in Raigarh, Maharashtra, registered with MahaRERA as P52000018661 on 22 Nov 2018. Possession was promised by 30 Mar 2022 and is now 55 months past that date.

At a glance

Project

  • NameJAI MALHAR APARTMENT
  • TypeResidential / Group Housing
  • Location
    • SHEDUNG
    • SHEDUNG PANVEL
    • Panvel
    • Raigarh
    • 410221
  • Pincode410221
  • RERA no.P52000018661
  • ReraGenie IDRG-MH-69054

Builder

  • NameGajanan Shyamrao Khabale
  • Entity typeIndividual
  • GSTIN27AOBPS1557D1Z1
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

55 months past promisethis monthRegisteredNov 2018PromisedMar 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Nov 2018
  • Promised completion30 Mar 2022
  • Revised completionNone
  • Buildings5 building records
  • Documents filed171 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA60000
BUILDING NO 2NA60000
BUILDING NO 3NA60000
BUILDING NO 4NA60000
BUILDING NO 5NA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 2 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 98%.

BUILDING NO 156%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor90%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.37%
BUILDING NO 256%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor90%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.37%
BUILDING NO 356%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor90%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.37%
BUILDING NO 456%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor90%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.37%
BUILDING NO 570%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor98%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%

Progress on shared amenities15

As on 2 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes97%
Water SupplyYes97%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes97%
Storm Water DrainsYes97%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes97%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,410 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ATMARAM DAMODAR GAYKARKurlaThane

Approvals and building plan

Permissible FSI6395.0
Proposed, not sanctioned5,533 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAPMC MARKET TURBHE VASHI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMandar V. Bodhankar
EngineerShravani Counsultant
Chartered AccountantSiddhant & Mayur Chartered Accountants
Chartered AccountantRSVA & Co Chartered Accountants
PartnerRole in project
Gajanan Shyamrao Khabale-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 May 2022

Documents filed171

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 171 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera From 5 21-22.PDF2 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf10 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 22_compressed.pdf10 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf10 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed (1).pdf10 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FOrm 1_compressed.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form No 2 March 2022.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FOrm 2_compressed.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 2_compressed.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf10 Mar 2023
Certificates of CA (Form 3)File: Form 3_compressed.pdf10 Mar 2023
Certificates of CA (Form 3)File: BBD Jai Malhar RERA Form as on March 22_compressed.pdf10 Mar 2023
Certificates of CA (Form 3)File: Form 3_compressed.pdf10 Mar 2023
Certificates of CA (Form 3)File: Form 3.pdf10 Mar 2023
Proforma of Allotment letterFile: Form 3_compressed.pdf10 Mar 2023
Declaration about Commencement CertificateFile: CC Declaration Ltr.PDF27 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Inventry List_compressed.pdf27 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC B No 2 3 4 5 dt 30-05-2022.pdf31 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: fORM 1.pdf31 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: fORM 1.pdf31 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: fORM 1.pdf31 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mar 21_compressed.pdf31 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - June 21_compressed.pdf31 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sept 21_compressed.pdf31 Mar 2022
Certificates of CA (Form 3)File: BBD RERA Form as on 31-3-2021_compressed_compressed.pdf31 Mar 2022
Certificates of CA (Form 3)File: BBD RERA Form as on 30-6-2021_compressed.pdf31 Mar 2022
Certificates of CA (Form 3)File: BBD RERA Form as on 30-9-2021_compressed.pdf31 Mar 2022
OtherFile: Oc Application Ltr.pdf28 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 19.pdf9 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 19.pdf9 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mar 20.pdf9 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Jun 20.pdf9 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 20.pdf9 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 20.pdf9 Oct 2021
Certificates of CA (Form 3)File: Form 3 - dec 19.pdf9 Oct 2021
Certificates of CA (Form 3)File: Form 3 - Mar 20.pdf9 Oct 2021
Certificates of CA (Form 3)File: Form 3 - Jun 20.pdf9 Oct 2021
Certificates of CA (Form 3)File: Form 3 - Sep 20.pdf9 Oct 2021
Certificates of CA (Form 3)File: Form 3 - Dec 20.pdf9 Oct 2021
Layout approvalFile: Plan 1.pdf16 Sep 2021
Layout approvalFile: Plan 2.pdf16 Sep 2021
Layout approvalFile: Plan 3.pdf16 Sep 2021
Layout approvalFile: Plan 4.pdf16 Sep 2021
Layout approvalFile: Plan 5.pdf16 Sep 2021
Layout approvalFile: Plan 6.pdf16 Sep 2021
Layout approvalFile: Plan 7.pdf16 Sep 2021
Layout approvalFile: Plan 8.pdf16 Sep 2021
Layout approvalFile: Plan 8.pdf16 Sep 2021
Layout approvalFile: Plan 9.pdf16 Sep 2021
Layout approvalFile: Plan 10.pdf16 Sep 2021
Layout approvalFile: Plan 11.pdf16 Sep 2021
Layout approvalFile: Plan 12.pdf16 Sep 2021
Layout approvalFile: Plan 13.pdf16 Sep 2021
Layout approvalFile: Plan 14.pdf16 Sep 2021
Layout approvalFile: Plan 15.pdf16 Sep 2021
Layout approvalFile: Plan 16.pdf16 Sep 2021
Layout approvalFile: Plan 17.pdf16 Sep 2021
Layout approvalFile: Plan 19.pdf16 Sep 2021
Layout approvalFile: Plan 20.pdf16 Sep 2021
Layout approvalFile: Plan 21.pdf16 Sep 2021
Layout approvalFile: Plan 22.pdf16 Sep 2021
Layout approvalFile: Plan 23.pdf16 Sep 2021
Layout approvalFile: Plan 24.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 1.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 2.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 3.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 4.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 5.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 6.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 7.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 8.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 8.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 9.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 10.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 11.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 12.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 13.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 14.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 15.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan 16.pdf16 Sep 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Matoshree Vahinisaheb ApartmentSurvey No 152-21 to 30 Deravali Village taluka Panvel126CompletedJan 2015Jan 2015
Siddhivnayak ApartmentSurvey No. 53-5429CompletedMay 2014May 2014
Shree Jyotirling ApartmentSurvey No. 148-1 Deravali village Taluka Panvel District Raigadh Pin Code72CompletedFeb 2014Feb 2014

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAI MALHAR APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHEDUNG PANVEL5,900+ in Raigarh

Builder: Gajanan Shyamrao Khabale

Gajanan Shyamrao Khabale has 5 registrations on MahaRERA, including Shivani Heritage and JAI MALHAR APARTMENT. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that JAI MALHAR APARTMENT shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if JAI MALHAR APARTMENT is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAI MALHAR APARTMENT?

The registered promoter entity is Gajanan Shyamrao Khabale, an individual as per the filing. Its GSTIN 27AOBPS1557D1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAI MALHAR APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAI MALHAR APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAI MALHAR APARTMENT?

The professionals named in the filing: Architect: Mandar V. Bodhankar; Engineer: Shravani Counsultant; Chartered Accountant: Siddhant & Mayur Chartered Accountants; Chartered Accountant: RSVA & Co Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAI MALHAR APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAI MALHAR APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAI MALHAR APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.