ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / JADE CHSL

Registered No litigation declared Others project

JADE CHSL

By SHREE MAHAVIR CONSTRUCTIONS

RG-MH-36568 · RERA P51800046042 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
42 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

JADE CHSL is a Others project by SHREE MAHAVIR CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046042 on 15 Jun 2022. Possession is promised by 31 Dec 2029. 5 of the 47 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameJADE CHSL
  • TypeOthers
  • Location
    • VALNAI SHANKAR LANE ROAD
    • KANDIVALI WEST
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • RERA no.P51800046042
  • ReraGenie IDRG-MH-36568

Builder

  • NameSHREE MAHAVIR CONSTRUCTIONS
  • Entity typePartnership
  • PartnersCHAINROOP DUGAR, PRASHANT SHAH, SNEHAL PATEL

Key dates

this monthRegisteredJun 2022PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Current status

11%5 of 47 units booked
50.6%Work done, per cost certificate

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA242325025
B WINGNA242322022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

A WING56%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
B WING56%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed246

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots246
Closed/Covered246
BuildingClosed/CoveredTotal
A WING123123
B WING123123

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,196 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Dec 2025
LandownerVillageDistrict
JADE CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7115.04
Proposed, not sanctioned2,608 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch30 NAVYUG SOCIETY KRISHNA KUNJ V L MEHTA ROAD MUMBAI 400056
Estimated costRs 37.50 cr
Cost incurredRs 18.97 cr
Work done50.6%
BuildingWingEstimatedIncurred
A WINGNARs 17.50 crRs 9.49 cr
B WINGNARs 17.50 crRs 9.49 cr
-NARs 2.50 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARIVARTAN
ArchitectJASH DESAI
EngineerDWIJEN BHATT
EngineerVISHAL KAILASH NATH SINGH
Chartered AccountantNEHALIC & CO
PartnerRole in project
SHREE MAHAVIR CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Jade.pdf2 May 2026
Withdrawal Update Form 2File: Signed Engineer Certificate of Jade.pdf2 May 2026
Withdrawal Update Form 3File: Signed CA Certificate of Jade.pdf2 May 2026
Withdrawal Update Form 1File: Architect Certificate Jade.pdf5 Mar 2026
Withdrawal Update Form 2File: Signed Engineer Certificate of Jade.pdf5 Mar 2026
Withdrawal Update Form 3File: Signed CA Certificate of Jade.pdf5 Mar 2026
Withdrawal Update Form 1File: Jade form 1.pdf28 Feb 2026
Withdrawal Update Form 2File: form 2.pdf28 Feb 2026
Withdrawal Update Form 3File: Jade FIRM 3.pdf28 Feb 2026
Withdrawal Update Form 1File: Architect form 1 Jade 01-07-2025.pdf9 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Jade.pdf9 Feb 2026
Withdrawal Update Form 3File: CA Certificate-Jade.pdf9 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Jade.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Jade.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Jade.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Jade.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate jade.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate jade.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Jade.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 23Jade.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23 Jade.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certificate Dec 23 Jade.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Annual Report Certificate Jade 22 23.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architeect Certificate - Jade.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cerificate-Jade.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Jade_0001.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jade Architech certificate.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Jade.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Jade.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jade.pdf13 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate JAde.pdf13 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Jade.pdf13 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architeect certificate -jade Scan.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cerificate- Jade scan.pdf16 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - jade Scan.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritifcate.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf18 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect Certificate - Jade.pdf5 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate - Jade.pdf5 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Jade.pdf5 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf2 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Jade CHSL.pdf2 Jun 2022
Declaration in FORM BFile: Form B.pdf1 Jun 2022
Building plan approvalFile: IOD Drawing 19082021_02 and 03.pdf27 May 2022
Building plan approvalFile: IOD Drawing 19082021_04 and 05.pdf27 May 2022
Building plan approvalFile: IOD dt.pdf27 May 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing 19082021_02 and 03.pdf27 May 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing 19082021_04 and 05.pdf27 May 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD dt.pdf27 May 2022
Layout approvalFile: PLANS 1.pdf21 May 2022
PAN CardFile: PAN CARD.pdf21 May 2022
Copy of the legal title reportFile: TITLE REPORT.pdf21 May 2022
Details of encumbrancesFile: NO ENCUMBRACE.pdf21 May 2022
Copy of Layout Approval (in case of layout)File: PLANS 1.pdf21 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf21 May 2022
Declaration about Commencement CertificateFile: CC DECLARATION.pdf21 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1.pdf21 May 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf21 May 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf21 May 2022

How this compares with Mumbai Suburban

11%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JADE CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI WEST6,700+ in Mumbai Suburban

Builder: SHREE MAHAVIR CONSTRUCTIONS

SHREE MAHAVIR CONSTRUCTIONS has 1 registration on MahaRERA, including JADE CHSL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JADE CHSL is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JADE CHSL?

The registered promoter entity is SHREE MAHAVIR CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JADE CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JADE CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JADE CHSL?

The professionals named in the filing: Architect: PARIVARTAN; Architect: JASH DESAI; Engineer: DWIJEN BHATT; Engineer: VISHAL KAILASH NATH SINGH; Chartered Accountant: NEHALIC & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JADE CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JADE CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JADE CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.