Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
Jan 2027Possession promisedmoved 12 months from the original
0 of 19Construction stages donefurthest along: Earth work and other leveling..., 5%
15 of 15Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 181 documents Report an error

Isle of Taprobane Apartments is a Residential/Group Housing project by Mohandas Joseph Prabhu in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/160623/005995 on 16 Jun 2023. Possession is promised by 26 Jan 2027. The completion date has moved by 12 months from the original filing. 0 of the 15 units on this registration are recorded sold or booked, and 0 of 19 construction stages are filed complete.

At a glance

Project

  • NameIsle of Taprobane Apartments
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/160623/005995
  • ReraGenie IDRG-KA-72543

Builder

  • NameMohandas Joseph Prabhu
  • Entity typeProprietorship Firm
  • GSTIN29AFJPP1523M1Z2
  • Authorized SignatoryMohandas Joseph Prabhu

Key dates

this monthRegisteredJun 2023First promiseJan 2026Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Jun 2023
  • Promised completion26 Jan 2027
  • Revised completionRevised to 26 Jan 2027 (originally 26 Jan 2026)
  • Buildings1 building record
  • Documents filed181 files

Current status

0%0 of 15 units booked
3.3%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Isle of Taprobane Apartments---15015

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 19 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 5%.

Building: 1% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work5%
Foundation footing work5%
Upto Plinth Level4%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)3%
Retaining wall (All types)3%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja work0%
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingNoNot applicable
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners3
LandownerVillageDistrict
Mohandas Joseph Prabhu--
Mohandas Joseph Prabhu--
Mohandas Joseph Prabhu--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.47 cr
Cost incurredRs 24.36 lakh
Spent of the estimate3.26%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.43 crRs 12.18 lakh
Payment of taxesRs 1.24 cr-
On-site expenditure-Salaries of workersRs 81.60 lakhRs 9.74 lakh
Principal sum and interest payable to financial institutions-Scheduled BanksRs 70.96 lakh-
On-site expenditure-Site OverheadRs 62.23 lakhRs 1.22 lakh
Payment of PremiumsRs 30.00 lakh-
On-site expenditure-Consultants FeesRs 15.00 lakhRs 85,500
Payment of feesRs 10.70 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 8.00 lakhRs 36,282
Payment of chargesRs 1.02 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSindhushree PV
EngineerKishor Hegde
Chartered AccountantSuresh Kumar

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/260407/005995Jan 2026 → Jan 2027

Reason as filed by the promoterDelay in getting loan

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed181

As listed on the registration, under the names the promoter filed them with; the newest 80 of 181 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/160623/005995 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: IOT CA certificate dtd 15 OCT 2025.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Q2(2025-26) - ARCHITECT CERTIFICATE dtd 15joct2026.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: q2 ( july to oct ) IOT eng Licence certificate 15-09-2026.pdf14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: IOT CA certificate dtd 15 june 2025.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Q1(2025-26) - ARCHITECT CERTIFICATE dtd 15june2026.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: IOT eng Licence certificate 29-06-2026.pdf15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: IOT CA certificate dtd 15 mar 2026.pdf11 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Q4(2025-26) - ARCHITECT CERTIFICATE dtd 15mar2026.pdf11 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: IOT eng Licence certificate 31-03-2026.pdf11 Apr 2026
MCC APPROVED BUILDING PLANFile: MCC APPROVED BLUEPRINT (3).pdf5 Mar 2026
MCC APPROVED BUILDING ORDER LETTERFile: Building license order letter.pdf5 Mar 2026
approved building planFile: MCC APPROVED BLUEPRINT.pdf16 Feb 2026
Confirmation letter from SBI Bank - Loan to be transferred to the RERA Designated AccountFile: Confirmation Letter from SBI for RERA Account.pdf16 Jan 2026
EC upto dateFile: EC up till date 2026.pdf16 Jan 2026
MCC APPROVED PLANFile: MCC APPROVED BLUEPRINT.pdf16 Jan 2026
ENGINEER CERTIFICATE EX-6File: Form-Ex6 Engineers Certifictae for Pending work as on date 01-01-2026 merged.pdf16 Jan 2026
REPLY TO RERA EXTENSION NOTICEFile: REPLY TO THE RERA KARNATAKA EXTENSION NOTICE.pdf16 Jan 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: IOT CA certificate dtd 15 dec 2025.pdf9 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architects Form 15dec2025 (1).pdf9 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: IOT eng Licence certificate 15-12-2025.pdf9 Jan 2026
1) Conversion ordersFile: 1) Conversion.pdf31 May 2023
2) Flow of titleFile: 2) Flow of title.pdf31 May 2023
2) Flow of title - continuationFile: 2).pdf31 May 2023
3) Typed inheritance documentFile: 3)Typed Inheritance Document.pdf31 May 2023
Balance sheet - 2022File: Balance sheet - 2022.pdf11 May 2023
Form-1 CA CertificateFile: Form-1 CA certificate.pdf11 May 2023
profit and loss account and balance sheet 2019 with CA UDIN along with scheduleFile: Balance sheet 2019.pdf29 Mar 2023
profit and loss account and balance sheet 2020 with CA UDIN along with scheduleFile: Balance sheet 2020.pdf29 Mar 2023
profit and loss account and balance sheet 2021 with CA UDIN along with scheduleFile: Balance sheet 2021.pdf29 Mar 2023
profit and loss account and balance sheet 2022 with CA UDIN along with scheduleFile: Balance sheet 2022.pdf29 Mar 2023
Proforma Of Allotment LetterFile: Allotment letter.pdf29 Mar 2023
Profit-Loss Acoount and Balance sheet 2021-2022File: Balance sheet 2021-2022.pdf8 Mar 2023
CA Certificate mentioning bank account detailsFile: CA Certificate updated.pdf8 Mar 2023
Title DeedFile: TITLE DEED.pdf8 Mar 2023
Certified CDP MapFile: CDP Approved.pdf8 Mar 2023
Building license as Commencement certificateFile: Building license with remark.pdf8 Mar 2023
FAR clarificationFile: FAR - Project Development Details.pdf8 Mar 2023
Water BillFile: WATER BILL - AUG.pdf8 Mar 2023
Allotment letterFile: Allotment letter.pdf8 Mar 2023
Cost DetailsFile: RERA Cost detail.pdf8 Mar 2023
Inheritance document of John Vincent PaisFile: Settlement deed from SIMON PASCAL PAIS to JOHN VINCENT PAIS.pdf8 Mar 2023
Corporation Tax 1997File: Corporation Tax receipt.pdf8 Mar 2023
Release Deed 2006-07File: RELEASE DEED.pdf8 Mar 2023
Deed of RectificationFile: Deed Of Rectification.pdf8 Mar 2023
MUDA Single Site Order & Sketch 2015-16File: MUDA Single site Order & Sketch 2015-16.pdf8 Mar 2023
Corelation TableFile: Corelation Table.pdf8 Mar 2023
E KhataFile: E Khata.pdf8 Mar 2023
Proprietorship registration certificateFile: Registration certificate.JPG8 Feb 2023
Chartered accountant certificate in format form -01File: Chartered accountant Form.pdf8 Feb 2023
Profit and loss account and balance sheet, 2019-20File: Balance sheet 2019.pdf8 Feb 2023
Profit and loss account and balance sheet,2020-21File: Balance sheet 2020.pdf8 Feb 2023
Profit and loss account and balance sheet, 2021-22File: Balance sheet 2021.pdf8 Feb 2023
Bank Statement of AccountFile: Bank Statement.pdf8 Feb 2023
Advocate Search ReportFile: Advocate report.pdf8 Feb 2023
RTC & MRFile: RTC & MR (1).pdf8 Feb 2023
Release Deed to Mirabel from Mary Pais, Mohandas Joseph Prabhu, Nirmala Pinto & NirupaFile: RELEASE DEED.pdf8 Feb 2023
Conversion Order 1977File: Conversion order 1977.pdf8 Feb 2023
Conversion Order 2006File: Conversion 2006.pdf8 Feb 2023
Gift deed from Mary PaisFile: Gift deed.pdf8 Feb 2023
Gift deed from Mirabel to Mohandas Joseph PrabhuFile: 833 - 829(P2)GIFT DEED from Mirabel.pdf8 Feb 2023
TABLE showing RTC , conversion order, sale deedsFile: RTC, SALE DEED TABLE for RERA.pdf8 Feb 2023
Project SpecificationFile: SPECIFICATION.pdf8 Feb 2023
Proforma of Allotment LetterFile: Agreement of Sale Proforma & Allotment.pdf8 Feb 2023
No airport NOCFile: No NOC airport.pdf8 Feb 2023
Water billFile: WATER BILL (2).pdf8 Feb 2023
CDP mapFile: cdp.jpg8 Feb 2023
Plan showing the rain water harvesting sumpFile: Urva Survey Details sumptank-Model.pdf8 Feb 2023
Proprietorship registration certificateFile: Registration certificate.JPG12 Jan 2023
Chartered accountant certificate in format form -01File: Chartered accountant Form.pdf12 Jan 2023
Profit and loss account and balance sheet, 2019-20File: Balance sheet 2019.pdf12 Jan 2023
Profit and loss account and balance sheet,2020-21File: Balance sheet 2020.pdf12 Jan 2023
Profit and loss account and balance sheet, 2021-22File: Balance sheet 2021.pdf12 Jan 2023
RTC & MR copies at the time of conversionFile: RTC & MR.pdf12 Jan 2023
Title deed of mirabel rita sobina monteiro pai and maryFile: TITLE DEED.pdf12 Jan 2023
Release deed / confirmation deed from mary paisFile: RELEASE DEED.pdf12 Jan 2023
conversion order for 0.16 centsFile: Conversion order 16CENTS.pdf12 Jan 2023
Form - BFile: Form B.pdf12 Jan 2023
Single plot layoutFile: SINGLE PLOT LAYOUT.pdf12 Jan 2023
Single Plot OrderFile: SINGLE PLOT ORDER.pdf12 Jan 2023
Certified Carpet area calculationFile: Certified Carpet area.pdf12 Jan 2023

How this compares with Dakshina Kannada

0%of this project is bookeddistrict median 38%
30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Isle of Taprobane Apartments on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: Mohandas Joseph Prabhu

Mohandas Joseph Prabhu has 1 registration on RERA Karnataka, including Isle of Taprobane Apartments. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Isle of Taprobane Apartments is delayed beyond 26 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Isle of Taprobane Apartments?

The registered promoter entity is Mohandas Joseph Prabhu, a proprietorship firm as per the filing. Its GSTIN 29AFJPP1523M1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Isle of Taprobane Apartments?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Isle of Taprobane Apartments?

The professionals named in the filing: Architect: Sindhushree PV; Engineer: Kishor Hegde; Chartered Accountant: Suresh Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Isle of Taprobane Apartments?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Isle of Taprobane Apartments. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Isle of Taprobane Apartments to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.