Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
Saved.
Isle of Taprobane Apartments is a Residential/Group Housing project by Mohandas Joseph Prabhu in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/160623/005995 on 16 Jun 2023. Possession is promised by 26 Jan 2027. The completion date has moved by 12 months from the original filing. 0 of the 15 units on this registration are recorded sold or booked, and 0 of 19 construction stages are filed complete.
At a glance
Project
- NameIsle of Taprobane Apartments
- TypeResidential/Group Housing
- Location
- Mangalore
- Dakshina Kannada
- PincodeNot stated
- RERA no.PRM/KA/RERA/1257/334/PR/160623/005995
- ReraGenie IDRG-KA-72543
Builder
- NameMohandas Joseph Prabhu
- Entity typeProprietorship Firm
- GSTIN29AFJPP1523M1Z2
- Authorized SignatoryMohandas Joseph Prabhu
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on16 Jun 2023
- Promised completion26 Jan 2027
- Revised completionRevised to 26 Jan 2027 (originally 26 Jan 2026)
- Buildings1 building record
- Documents filed181 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Isle of Taprobane Apartments | - | - | - | 15 | 0 | 15 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 19 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 5%.
Building: 1% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 5% |
| Foundation footing work | 5% |
| Upto Plinth Level | 4% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 3% |
| Retaining wall (All types) | 3% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mohandas Joseph Prabhu | - | - |
| Mohandas Joseph Prabhu | - | - |
| Mohandas Joseph Prabhu | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 3.43 cr | Rs 12.18 lakh |
| Payment of taxes | Rs 1.24 cr | - |
| On-site expenditure-Salaries of workers | Rs 81.60 lakh | Rs 9.74 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 70.96 lakh | - |
| On-site expenditure-Site Overhead | Rs 62.23 lakh | Rs 1.22 lakh |
| Payment of Premiums | Rs 30.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 15.00 lakh | Rs 85,500 |
| Payment of fees | Rs 10.70 lakh | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 8.00 lakh | Rs 36,282 |
| Payment of charges | Rs 1.02 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sindhushree PV |
| Engineer | Kishor Hegde |
| Chartered Accountant | Suresh Kumar |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDelay in getting loan
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed181
As listed on the registration, under the names the promoter filed them with; the newest 80 of 181 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/160623/005995 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: IOT CA certificate dtd 15 OCT 2025.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Q2(2025-26) - ARCHITECT CERTIFICATE dtd 15joct2026.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: q2 ( july to oct ) IOT eng Licence certificate 15-09-2026.pdf | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: IOT CA certificate dtd 15 june 2025.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Q1(2025-26) - ARCHITECT CERTIFICATE dtd 15june2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: IOT eng Licence certificate 29-06-2026.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: IOT CA certificate dtd 15 mar 2026.pdf | 11 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Q4(2025-26) - ARCHITECT CERTIFICATE dtd 15mar2026.pdf | 11 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: IOT eng Licence certificate 31-03-2026.pdf | 11 Apr 2026 |
| MCC APPROVED BUILDING PLANFile: MCC APPROVED BLUEPRINT (3).pdf | 5 Mar 2026 |
| MCC APPROVED BUILDING ORDER LETTERFile: Building license order letter.pdf | 5 Mar 2026 |
| approved building planFile: MCC APPROVED BLUEPRINT.pdf | 16 Feb 2026 |
| Confirmation letter from SBI Bank - Loan to be transferred to the RERA Designated AccountFile: Confirmation Letter from SBI for RERA Account.pdf | 16 Jan 2026 |
| EC upto dateFile: EC up till date 2026.pdf | 16 Jan 2026 |
| MCC APPROVED PLANFile: MCC APPROVED BLUEPRINT.pdf | 16 Jan 2026 |
| ENGINEER CERTIFICATE EX-6File: Form-Ex6 Engineers Certifictae for Pending work as on date 01-01-2026 merged.pdf | 16 Jan 2026 |
| REPLY TO RERA EXTENSION NOTICEFile: REPLY TO THE RERA KARNATAKA EXTENSION NOTICE.pdf | 16 Jan 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: IOT CA certificate dtd 15 dec 2025.pdf | 9 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architects Form 15dec2025 (1).pdf | 9 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: IOT eng Licence certificate 15-12-2025.pdf | 9 Jan 2026 |
| 1) Conversion ordersFile: 1) Conversion.pdf | 31 May 2023 |
| 2) Flow of titleFile: 2) Flow of title.pdf | 31 May 2023 |
| 2) Flow of title - continuationFile: 2).pdf | 31 May 2023 |
| 3) Typed inheritance documentFile: 3)Typed Inheritance Document.pdf | 31 May 2023 |
| Balance sheet - 2022File: Balance sheet - 2022.pdf | 11 May 2023 |
| Form-1 CA CertificateFile: Form-1 CA certificate.pdf | 11 May 2023 |
| profit and loss account and balance sheet 2019 with CA UDIN along with scheduleFile: Balance sheet 2019.pdf | 29 Mar 2023 |
| profit and loss account and balance sheet 2020 with CA UDIN along with scheduleFile: Balance sheet 2020.pdf | 29 Mar 2023 |
| profit and loss account and balance sheet 2021 with CA UDIN along with scheduleFile: Balance sheet 2021.pdf | 29 Mar 2023 |
| profit and loss account and balance sheet 2022 with CA UDIN along with scheduleFile: Balance sheet 2022.pdf | 29 Mar 2023 |
| Proforma Of Allotment LetterFile: Allotment letter.pdf | 29 Mar 2023 |
| Profit-Loss Acoount and Balance sheet 2021-2022File: Balance sheet 2021-2022.pdf | 8 Mar 2023 |
| CA Certificate mentioning bank account detailsFile: CA Certificate updated.pdf | 8 Mar 2023 |
| Title DeedFile: TITLE DEED.pdf | 8 Mar 2023 |
| Certified CDP MapFile: CDP Approved.pdf | 8 Mar 2023 |
| Building license as Commencement certificateFile: Building license with remark.pdf | 8 Mar 2023 |
| FAR clarificationFile: FAR - Project Development Details.pdf | 8 Mar 2023 |
| Water BillFile: WATER BILL - AUG.pdf | 8 Mar 2023 |
| Allotment letterFile: Allotment letter.pdf | 8 Mar 2023 |
| Cost DetailsFile: RERA Cost detail.pdf | 8 Mar 2023 |
| Inheritance document of John Vincent PaisFile: Settlement deed from SIMON PASCAL PAIS to JOHN VINCENT PAIS.pdf | 8 Mar 2023 |
| Corporation Tax 1997File: Corporation Tax receipt.pdf | 8 Mar 2023 |
| Release Deed 2006-07File: RELEASE DEED.pdf | 8 Mar 2023 |
| Deed of RectificationFile: Deed Of Rectification.pdf | 8 Mar 2023 |
| MUDA Single Site Order & Sketch 2015-16File: MUDA Single site Order & Sketch 2015-16.pdf | 8 Mar 2023 |
| Corelation TableFile: Corelation Table.pdf | 8 Mar 2023 |
| E KhataFile: E Khata.pdf | 8 Mar 2023 |
| Proprietorship registration certificateFile: Registration certificate.JPG | 8 Feb 2023 |
| Chartered accountant certificate in format form -01File: Chartered accountant Form.pdf | 8 Feb 2023 |
| Profit and loss account and balance sheet, 2019-20File: Balance sheet 2019.pdf | 8 Feb 2023 |
| Profit and loss account and balance sheet,2020-21File: Balance sheet 2020.pdf | 8 Feb 2023 |
| Profit and loss account and balance sheet, 2021-22File: Balance sheet 2021.pdf | 8 Feb 2023 |
| Bank Statement of AccountFile: Bank Statement.pdf | 8 Feb 2023 |
| Advocate Search ReportFile: Advocate report.pdf | 8 Feb 2023 |
| RTC & MRFile: RTC & MR (1).pdf | 8 Feb 2023 |
| Release Deed to Mirabel from Mary Pais, Mohandas Joseph Prabhu, Nirmala Pinto & NirupaFile: RELEASE DEED.pdf | 8 Feb 2023 |
| Conversion Order 1977File: Conversion order 1977.pdf | 8 Feb 2023 |
| Conversion Order 2006File: Conversion 2006.pdf | 8 Feb 2023 |
| Gift deed from Mary PaisFile: Gift deed.pdf | 8 Feb 2023 |
| Gift deed from Mirabel to Mohandas Joseph PrabhuFile: 833 - 829(P2)GIFT DEED from Mirabel.pdf | 8 Feb 2023 |
| TABLE showing RTC , conversion order, sale deedsFile: RTC, SALE DEED TABLE for RERA.pdf | 8 Feb 2023 |
| Project SpecificationFile: SPECIFICATION.pdf | 8 Feb 2023 |
| Proforma of Allotment LetterFile: Agreement of Sale Proforma & Allotment.pdf | 8 Feb 2023 |
| No airport NOCFile: No NOC airport.pdf | 8 Feb 2023 |
| Water billFile: WATER BILL (2).pdf | 8 Feb 2023 |
| CDP mapFile: cdp.jpg | 8 Feb 2023 |
| Plan showing the rain water harvesting sumpFile: Urva Survey Details sumptank-Model.pdf | 8 Feb 2023 |
| Proprietorship registration certificateFile: Registration certificate.JPG | 12 Jan 2023 |
| Chartered accountant certificate in format form -01File: Chartered accountant Form.pdf | 12 Jan 2023 |
| Profit and loss account and balance sheet, 2019-20File: Balance sheet 2019.pdf | 12 Jan 2023 |
| Profit and loss account and balance sheet,2020-21File: Balance sheet 2020.pdf | 12 Jan 2023 |
| Profit and loss account and balance sheet, 2021-22File: Balance sheet 2021.pdf | 12 Jan 2023 |
| RTC & MR copies at the time of conversionFile: RTC & MR.pdf | 12 Jan 2023 |
| Title deed of mirabel rita sobina monteiro pai and maryFile: TITLE DEED.pdf | 12 Jan 2023 |
| Release deed / confirmation deed from mary paisFile: RELEASE DEED.pdf | 12 Jan 2023 |
| conversion order for 0.16 centsFile: Conversion order 16CENTS.pdf | 12 Jan 2023 |
| Form - BFile: Form B.pdf | 12 Jan 2023 |
| Single plot layoutFile: SINGLE PLOT LAYOUT.pdf | 12 Jan 2023 |
| Single Plot OrderFile: SINGLE PLOT ORDER.pdf | 12 Jan 2023 |
| Certified Carpet area calculationFile: Certified Carpet area.pdf | 12 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep Isle of Taprobane Apartments on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
ROHAN CITY
ROHAN CORPORATION INDIA PRIVATE LIMITED
Bearys Turning Point
Bearys Properties and Developments Private
YAMUNA SKY CITY
YAMUNA HOMES AND DESIGN PRIVATE LIMITED
The Marian Park
Marian Projects Pvt Ltd
Sai Matha Garden
Matha Developers Pvt Ltd
ROHAN MARINA ONE
ROHAN PLAZA PRIVATE LIMITED
See every Dakshina Kannada project, with the district possession charts
Builder: Mohandas Joseph Prabhu
Mohandas Joseph Prabhu has 1 registration on RERA Karnataka, including Isle of Taprobane Apartments. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if Isle of Taprobane Apartments is delayed beyond 26 Jan 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Isle of Taprobane Apartments?
The registered promoter entity is Mohandas Joseph Prabhu, a proprietorship firm as per the filing. Its GSTIN 29AFJPP1523M1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Isle of Taprobane Apartments?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Isle of Taprobane Apartments?
The professionals named in the filing: Architect: Sindhushree PV; Engineer: Kishor Hegde; Chartered Accountant: Suresh Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Isle of Taprobane Apartments?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback