ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / IPSIT DEEP DARSHAN

Registered No litigation declared Mixed project

IPSIT DEEP DARSHAN

By IPSIT INCLINE

RG-MH-68226 · RERA PM1180002600345 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 35.00 crore secured on the land, in favour of CAPRI GLOBAL CAPITAL LIMITED
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 20Construction stages doneacross 2 buildings; furthest along: Excavation, 50%
140 of 140Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 12 documents Report an error

IPSIT DEEP DARSHAN is a Mixed project by IPSIT INCLINE in Mumbai Suburban, Maharashtra, registered with MahaRERA as PM1180002600345 on 5 May 2026. Possession is promised by 31 Dec 2029. 0 of the 140 units on this registration are recorded sold or booked, and 0 of 20 construction stages are filed complete.

At a glance

Project

  • NameIPSIT DEEP DARSHAN
  • TypeMixed
  • Location
    • S.V.ROAD
    • BORIVALI
    • Kanheri
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1180002600345
  • ReraGenie IDRG-MH-68226

Builder

  • NameIPSIT INCLINE
  • Entity typePartnership
  • GSTIN27AAKFI1168D1ZH
  • PartnersPRASANNA GADKARI, TEJASHRI GADKARI

Key dates

this monthRegisteredMay 2026PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 May 2026
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed12 files

Current status

0%0 of 140 units booked

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IPSIT DEEP DARSHANA WING 2221632487
IPSIT DEEP DARSHANB WING 221951253

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 20 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 50%.

IPSIT DEEP DARSHAN · wing A WING 5%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
IPSIT DEEP DARSHAN · wing B WING 5%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed138

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots138
Stilt / Ground10
Podiums / Upper Parking Floor82
Basement46
BuildingStilt / GroundPodiums / Upper Parking FloorBasementTotal
IPSIT DEEP DARSHAN A WING5412369
IPSIT DEEP DARSHAN B WING5412369

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,670 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofCAPRI GLOBAL CAPITAL LIMITED
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on22 Apr 2026
LandownerVillageDistrict
DIP DARSHAN CO OPERATIVE HOUSING SOCIETY LTDBorivaliMumbai Suburban
NEW DEEP DARSHAN CO OPERATIVE HOUSING SOCIETY LTDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI9179.17
Proposed, not sanctioned9,179 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUMIT ENCLAVE GROUND FLOOR PLOT NO564 TPS 3 20FT FLYOVER ROADJUNCTION OF LINK ROAD and SV ROAD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSuresh Gaikwad
EngineerJyotiba Patil
Chartered AccountantPraveen Jain
PartnerRole in project
IPSIT INCLINE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed12

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: 11 IDD Parking.pdf23 Apr 2026
Declaration and undertaking (Annexure A)File: Annexure A Specimen format of Declaration.pdf23 Apr 2026
Building plan approvalFile: 1 Basement highlight.pdf22 Apr 2026
Building plan approvalFile: 2 Ground Floor highlight.pdf22 Apr 2026
Building plan approvalFile: 3 Second to Forth Floor Seventh Floor highlight.pdf22 Apr 2026
Building plan approvalFile: 4 Fifth to Six Floor.pdf22 Apr 2026
Building plan approvalFile: 5 Eight to Nine Floor.pdf22 Apr 2026
Building plan approvalFile: 6 Ten to Eleven Floor.pdf22 Apr 2026
Building plan approvalFile: 7 Twelve Thirteen Floor.pdf22 Apr 2026
Building plan approvalFile: 8 Fourteen to Fifteen Floor.pdf22 Apr 2026
Building plan approvalFile: 9 Sixteen Seventeen Twenty Floor.pdf22 Apr 2026
Building plan approvalFile: 10 Eighteen Nineteen Floor.pdf22 Apr 2026

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IPSIT DEEP DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI6,700+ in Mumbai Suburban

2 kmIPSIT DEEP DARSHANCompleted 154Lapsed / revoked 89Other 216Dot size: filed unitsN

Filed coordinates, straight-line distance. 459 registered projects within 2 km.

Builder: IPSIT INCLINE

IPSIT INCLINE has 1 registration on MahaRERA, including IPSIT DEEP DARSHAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if IPSIT DEEP DARSHAN is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IPSIT DEEP DARSHAN?

The registered promoter entity is IPSIT INCLINE, a partnership as per the filing. Its GSTIN 27AAKFI1168D1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IPSIT DEEP DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IPSIT DEEP DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IPSIT DEEP DARSHAN?

The professionals named in the filing: Architect: Suresh Gaikwad; Engineer: Jyotiba Patil; Chartered Accountant: Praveen Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IPSIT DEEP DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IPSIT DEEP DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IPSIT DEEP DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.