ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Integrated IRS II

Completed No litigation declared Residential / Group Housing project

Integrated IRS II

By Integrated Spaces Limited

RG-MH-08344 · RERA P52000005863 · Last updated on MahaRERA portal: 5 Jun 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Integrated IRS II is a Residential / Group Housing project by Integrated Spaces Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000005863 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2023. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameIntegrated IRS II
  • TypeResidential / Group Housing
  • Location
    • D P Road
    • Sector No. 21
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000005863
  • ReraGenie IDRG-MH-08344

Builder

  • NameIntegrated Spaces Limited
  • Entity typeCompany
  • Managing DirectorNishit Savla
  • ChairpersonKanti Savla
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseMar 2019Revised toSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IRS TOWER IINA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

IRS TOWER II: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered34
Open Space4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,497 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2216.0
Proposed, not sanctioned2,216 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKarma Sankalp Building, Road No 7, Rajawadi, Opp Somaiya College, Mumbai- 400077

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShri Vivek Bhosale
EngineerDayanand Salunke
EngineerKrishna Pandey
Chartered AccountantVarun A. Tiwari
Chartered AccountantVijay Kumar Jain
PartnerRole in project
Integrated Spaces Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000015421Mar 2019 → Sep 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30/09/2023

EXT52000000666Mar 2019 → Mar 2020

Reason as filed by the promoter“We had agreed to reserve 32 Residential premises out of 36 Residential premises proposed in the building known as INTEGRATED IRS TOWER II to the Members of IRS (Mumbai) CHS Ltd. (proposed) (hereinafter referred to as the said proposed Society). the Proposed Society has allotted 23 premises to members out of which 13 members have executed the Agreement and remaining 9 Residential Premises are yet to be allotted to the members of the said Proposed Society. Further, the members of the Proposed Society are not paying as per the schedule date of payment whereby cash flow is severely affected which

Litigation declared1

CaseCourtStatus
197/2015Civil Court Senior Division PanvelISSUE

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jun 2023

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: IRS II form 2A.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Integrated IRS II_FY22-23_Signed.pdf18 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRS II (1).pdf6 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - IRS II 20th June 23.pdf5 Sep 2023
Certificates of CA (Form 3)File: Form 3 - IRS II 20th June 23.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-FY22-23-Integrated IRS II.pdf18 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate_OC_20-06-2023.pdf27 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Architech Certificate.pdf27 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- IRS II- FY 22-23-Q4.pdf9 Jun 2023
Certificates of CA (Form 3)File: CA Certificate Integrated IRS II Mar'23 -Final (1).pdf2 Jun 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate - Integrated IRS Tower 2.pdf3 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer certificate IRS II Jun-22.pdf22 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer certificate IRS II Sep-22.pdf22 Mar 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate Integrated IRS II June'22.pdf22 Mar 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate Integrated IRS II Sept'22.pdf22 Mar 2023
CERSAI detailsFile: CERSAI IRS 2.pdf2 Mar 2023
Disclosure of sold/ booked inventoryFile: INVENTORY IRS 2.pdf2 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form 2.pdf28 Feb 2023
Certificates of CA (Form 3)File: CA form 3.pdf28 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A_IRS-II_March 2021.pdf10 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A_IRS-II_March 2022.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Integrated IRS-II_FY 21-22_signed.pdf28 Jan 2023
Certificates of CA (Form 3)File: Form 3_CA Certificate-IRS II_signed.pdf19 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_IRS2_31 12 22.pdf18 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_IRS2_EC_Mar'22 Signed.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate_IRS-II_Q2.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 IRS II.pdf8 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19_form 1 (irs tower 2)_compressed.pdf17 Aug 2022
Certificates of CA (Form 3)File: Signed CA cert.pdf16 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31122021.pdf8 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRS2_EC_Mar'21.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 CERTIFICATE FY 19-20 161021.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 CERTIFICATE FY 19-20 161021.pdf16 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 - 30062021.pdf10 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate - IRS-II.pdf22 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate - IRS-II.pdf22 Jun 2021
Certificates of CA (Form 3)File: Final Form 3 IRS II January 2020 to December 2020 V2.pdf22 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf18 Dec 2020
Details of Restarting of Construction work post lockdownFile: IRS-II.pdf20 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRS Tower II.pdf19 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRS Tower II.pdf19 Mar 2020
Form 2AFile: Form 2A IRS Tower II.pdf19 Mar 2020
Certificates of CA (Form 3)File: Form 3 IRS Tower II.pdf19 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRS Tower 2.pdf24 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRS Tower 2.pdf24 Dec 2019
Form 2AFile: Form 2A IRS Tower 2.pdf24 Dec 2019
Certificates of CA (Form 3)File: Form 3 IRS Tower 2.pdf24 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRS Tower 2.pdf23 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRS Tower 2.pdf23 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRS Tower 2.pdf23 Oct 2019
Form 2AFile: Form 2A IRS Tower 2.pdf23 Oct 2019
Certificates of CA (Form 3)File: Form 3 IRS II.pdf23 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRS Tower-II.pdf22 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRS Tower-II.pdf22 Jul 2019
Form 2AFile: Form 2A IRS Tower-II.pdf22 Jul 2019
Certificates of CA (Form 3)File: Form 3 IRS Tower- II.pdf22 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRS Tower 2.pdf7 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRS Tower 2.pdf7 Mar 2019
Form 2AFile: Form 2A IRS Tower 2.pdf7 Mar 2019
Certificates of CA (Form 3)File: Form 3 IRS Tower 2.pdf7 Mar 2019
Certificates of CA (Form 5)File: FORM 5 IRS II.pdf10 Dec 2018
Certificates of CA (Form 3)File: Form 3 IRS Tower II.pdf6 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate IRS Tower-2.pdf2 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC IRS Tower II.pdf2 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf4 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC of IRS Tower-II.pdf4 Sep 2018
Certificates of CA (Form 3)File: Form 3 IRSII.pdf4 Sep 2018
Certificates of CA (Form 3)File: Form 3 I IRS II new.pdf30 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf27 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ECIRS Tower 2.pdf27 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate IRS II.pdf9 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf9 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC IRS II.pdf9 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC IRS2.pdf9 Mar 2018
Certificates of CA (Form 3)File: Form 3 IRS II.pdf9 Mar 2018
Certificates of CA (Form 3)File: Form 3 IRS 2.pdf9 Mar 2018
Details of encumbrancesFile: Details of encumbrances IRS II.pdf29 Jul 2017
Declaration in FORM BFile: Affidavit cum declaration IRS II.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form 3_IRS II.pdf29 Jul 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Integrated IRS 1Ulve Node108CompletedDec 2016Late, Jul 2017
Integrated BhoomiGhatkopar West96CompletedDec 2016Dec 2016
Shivnagar Karma BhoomjGhatkopar West92CompletedJul 2015Jul 2015
Integrated KarmaGhatkopar East40CompletedDec 2012Nov 2012
Pranay KiranGhatkopar West76CompletedMar 2012Feb 2012

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 54 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Integrated IRS II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sector No. 215,900+ in Raigarh

2 kmIntegrated IRS IICompleted 89Lapsed / revoked 28Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: Integrated Spaces Limited

Integrated Spaces Limited has 6 registrations on MahaRERA, including Integrated Kamal and Integrated Ahana. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Integrated IRS II is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Integrated IRS II?

The registered promoter entity is Integrated Spaces Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Integrated IRS II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Integrated IRS II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Integrated IRS II?

The professionals named in the filing: Architect: Shri Vivek Bhosale; Engineer: Dayanand Salunke; Engineer: Krishna Pandey; Chartered Accountant: Varun A. Tiwari; Chartered Accountant: Vijay Kumar Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Integrated IRS II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Integrated IRS II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Integrated IRS II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.