Integrated Arya

By Integrated Spaces Limited

RG-MH-08339 · RERA P51800004521 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 117 months
  • 6 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 117 months from the original
4 of 11Construction stages donefurthest along: Staircases, 92%
85 of 167Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 167 documents Report an error

Integrated Arya is a Others project by Integrated Spaces Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004521 on 9 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 117 months from the original filing. 82 of the 167 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameIntegrated Arya
  • TypeOthers
  • Location
    • Off. L. B. S. Marg
    • Narayan Nagar
    • Ghatkopar West
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004521
  • ReraGenie IDRG-MH-08339

Builder

  • NameIntegrated Spaces Limited
  • Entity typeCompany
  • Managing DirectorNishit Savla
  • ChairpersonKanti Savla
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseMar 2019Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed167 files

Current status

49%82 of 167 units booked
102.8%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INTEGRATED ARYANA1191598167

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 92%.

INTEGRATED ARYA: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed109

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots109
Closed/Covered109

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,252 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI7864.0
Proposed, not sanctioned6,891 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKARM SANKALP BLDG PLOT NO 51 ROAD NO 7 VIDYAVIHAR EAST MUMBAI 400077
Estimated costRs 33.72 cr
Cost incurredRs 34.65 cr
Work done102.76%
BuildingWingEstimatedIncurred
INTEGRATED ARYANARs 32.70 crRs 33.60 cr
-NARs 1.02 crRs 1.05 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYMS CONSULTANTS LIMITED
ArchitectYOMESH RAO
EngineerDayanand Salunke
EngineerPRADEEP ASHOK THORAT
Chartered AccountantNEHALI DHAVAL DOSHI
Chartered AccountantVINAY BHUSHAN&associates
PartnerRole in project
Integrated Spaces Limited-

Extensions applied for6

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800011041Mar 2019 → Mar 2022

Reason as filed by the promoterFlooring, Tiling work, Electrification work, Internal and external plumbing work has been completed of Wing A & B and initiate same work in wing C,D,E,F. Due to COVID 19 lockdown, there has been delay in completion of finishing work at site. Hence, we seek further extension of 3 months i.e. upto 31.03.2022.

EXT51800011566Mar 2019 → Jul 2022

Reason as filed by the promoterProject is ready for application for OC we have completed 12 compliance out of 13 compliance for application of OC and we will apply for OC on or before 31-03-2022. For completion of balance finishing work and to take water connection at site, we seek further extension of 4 months i.e. upto 31-07-2022 to complete ancillary work for delivery of project.

EXT51800013666Mar 2019 → Apr 2025

Reason as filed by the promoter1 Due to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis 2 Lack of manpower and labour supply post covid time. Most of the North Indian labourers were away and hence we had a very bad time to re establish the work momentum. 3 Unseasonal and heavy rain during odd months also impacted badly in our project construction phase 4 The sales in the market was absolutely bad and hence we could not get enough business and fresh income to run the construction flow as per the schedule 5 Most of our investors and directors faced issues in fund

EXT51800005822Mar 2019 → Dec 2020

Reason as filed by the promoterDue to adverse market condition and slowdown in Real Estate Industry in 2019, there has been a delay in completion of balance construction and finishing work at site. Hence we seek further extension of 9 months to complete work and obtain Occupation Certificate for the project.

EXT51800000665Mar 2019 → Dec 2020

Reason as filed by the promoter“In the present litigation we are at Consent term stage also awaiting DP 2034 for further approvals. ”

EXT51800025075Mar 2019 → Dec 2028

Reason as filed by the promoterWe "Integrated Spaces Limited", promoters of the project named "Integrated Arya" located at CTS No. 183C/1 and 183C/2 of Village Kirol, Taluka Kurla, District Mumbai Suburhan, 400086 The project consists of total 6 wings and cach wing consist of ground plus & floors. Plinth Approval was received for the project in the year 8 July 2015 and Full CC (G+7) for the project was received on 6th May 2019 We have completed ground plus 7 floors as per the approval received also we have obtained part occupation certificate for ground plus 7 floors dated May 2022. Out of 102 units (including 8ª floor unit

Litigation declared2

CaseCourtStatus
3969/2010City Civil CourtRECORDING EVIDENCE
7545/2017High Court MumbaiPre Admission

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000197800Manohar Shrinivas ChettyIntegrated Spaces Ltd.28/07/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Dec 2022

Documents filed167

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 167 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Arya.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 Arya.pdf11 May 2026
Withdrawal Update Form 3File: Signed CA Certificate Integrated Arya M26.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 Arya Dec 25.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 Arya Dec 25.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 Arya Dec 25.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1 Arya - Sept 25.pdf2 Dec 2025
Withdrawal Update Form 2File: Arya Form 2 - Sept 25.pdf2 Dec 2025
Withdrawal Update Form 3File: Signed CA Certificate Integrated Arya Sept 25.pdf2 Dec 2025
Form 5 (FY 2024-2025)File: ISL Arya Form 5_FY 24-25.pdf2 Dec 2025
Withdrawal Update Form 1File: Form 1 - Arya June 25.pdf27 Nov 2025
Withdrawal Update Form 2File: Arya Form 2 - June 25.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 Arya June 25.pdf27 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A - Arya.pdf3 Oct 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1 (Arya).pdf2 May 2025
Certificates of CA (Form 3)File: Signed_CA Certificate Integrated Arya Mar 25.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Arya Q 4 FY 24-25.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Arya - Inventory.pdf2 May 2025
Declaration in FORM BFile: Arya - Forrm B.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Arya Form-5 23-24.pdf18 Mar 2025
Certificates of CA (Form 3)File: Form 3.pdf12 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Arya.pdf12 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf30 Jan 2025
Certificates of CA (Form 3)File: form 3.pdf27 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf27 Nov 2024
Declaration in FORM BFile: Arya Form B.pdf22 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arya.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arya.pdf9 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf12 Aug 2024
Certificates of CA (Form 3)File: form 3.pdf12 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate for RERA (Arya).pdf24 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Arya form 2A.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Arya.pdf14 May 2024
Certificates of CA (Form 3)File: form 3.pdf14 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Arya.pdf2 Apr 2024
Disclosure of sold/ booked inventoryFile: Arya Inventory Disclosure.pdf7 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Dec 23.pdf5 Feb 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Dec 23.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Audit Report 2022 2023.pdf30 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 (arya)_signed.pdf13 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2 -Arya Sept 23.pdf23 Dec 2023
Certificates of CA (Form 3)File: Signed CA Certificate Integrated Arya sept'23_Signed Final.pdf23 Dec 2023
Details of encumbrances concerned to FinanceFile: Integrated Arya Encumbrances.pdf1 Dec 2023
Details of encumbrances concerned to LegalFile: Integrated Arya Encumbrances.pdf1 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Int Arya_Sep 2023.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Int Arya_Apr-June 2023.pdf26 Aug 2023
Certificates of CA (Form 3)File: Int Arya Form 3 Apr-Jun 23.pdf26 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-FY22-23-Integrated Arya.pdf18 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Integrated Arya-Q1.pdf14 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engineer's Certificate-Q4.pdf14 Jul 2023
Certificates of CA (Form 3)File: Form 3- C A Certificate- Form 3- Final Signed (1).pdf8 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate - Integrated Arya.pdf27 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert June 22.pdf18 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Sep 22.pdf18 Mar 2023
Certificates of CA (Form 3)File: Form 3_CA June 22.pdf18 Mar 2023
Certificates of CA (Form 3)File: Form 3_CA Sept 22.pdf18 Mar 2023
Details of encumbrances concerned to FinanceFile: I Arya - Self Declaration_No Encumbrance.pdf28 Feb 2023
Details of encumbrances concerned to LegalFile: I Arya - Self Declaration_No Encumbrance.pdf28 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form 2.pdf28 Feb 2023
Certificates of CA (Form 3)File: CA form 3.pdf28 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A Arya FY 21-22.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Integrated Arya_FY 21-22_signed.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate -Arya - Dec 22.pdf23 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Integrated Arya_Form 4 - Architect certificate.pdf19 Jan 2023
Certificates of CA (Form 3)File: Form 3_CA Certificate-Arya_signed.pdf19 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_ARYA_EC_Mar 22_Signed.pdf18 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13d_part oc letter with visible sign 190522.pdf3 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate - Arya.pdf25 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_ARYA_EC_Mar 22_Signed.pdf25 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ARYA_EC_Mar'21.pdf25 Nov 2022
Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Integrated Arya_Q1_Form 1_08 08 2022.pdf17 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Signed 09042022.pdf9 Apr 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate_Arya_Signed Final.pdf4 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf1 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ARYA_EC_Mar'21.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 signed INTEGRATED ARYA.pdf20 Oct 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf10 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - 30062021.pdf10 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A March 2021.pdf10 Aug 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Integrated IRS 1Ulve Node108CompletedDec 2016Late, Jul 2017
Integrated BhoomiGhatkopar West96CompletedDec 2016Dec 2016
Shivnagar Karma BhoomjGhatkopar West92CompletedJul 2015Jul 2015
Integrated KarmaGhatkopar East40CompletedDec 2012Nov 2012
Pranay KiranGhatkopar West76CompletedMar 2012Feb 2012

How this compares with Mumbai Suburban

49%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 117 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Integrated Arya on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Narayan Nagar, Ghatkopar West6,700+ in Mumbai Suburban

2 kmIntegrated AryaCompleted 113Lapsed / revoked 69Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 304 registered projects within 2 km.

Builder: Integrated Spaces Limited

Integrated Spaces Limited has 6 registrations on MahaRERA, including Integrated Kamal and Integrated Ahana. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Integrated Arya is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Integrated Arya?

The registered promoter entity is Integrated Spaces Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Integrated Arya?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Integrated Arya?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Integrated Arya?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Integrated Arya?

The professionals named in the filing: Architect: YMS CONSULTANTS LIMITED; Architect: YOMESH RAO; Engineer: Dayanand Salunke; Engineer: PRADEEP ASHOK THORAT; Chartered Accountant: NEHALI DHAVAL DOSHI; Chartered Accountant: VINAY BHUSHAN&associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Integrated Arya?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Integrated Arya. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Integrated Arya to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.