Home / Browse projects / Solapur, Maharashtra / INSTYLE RESIDENCY

Completed No litigation declared Residential / Group Housing project

INSTYLE RESIDENCY

By T6 REALTY PVT LTD

RG-MH-01260 · RERA P52600001808 · Last updated on MahaRERA portal: 30 Nov 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 47 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

INSTYLE RESIDENCY is a Residential / Group Housing project by T6 REALTY PVT LTD in Solapur, Maharashtra, registered with MahaRERA as P52600001808 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 47 months from the original filing.

At a glance

Project

  • NameINSTYLE RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Solapur
    • Solapur (M Corp.)
    • Solapur North
    • 413002
  • Pincode413002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600001808
  • ReraGenie IDRG-MH-01260

Builder

  • NameT6 REALTY PVT LTD
  • Entity typeCompany
  • ChairpersonRAJKUMAR BADRINARAYAN ZAWAR
  • Managing DirectorVIJAY BADRINARAYAN ZAWAR
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseJul 2019Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 17 Jul 2019)
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INSTYLE RESIDENCYNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

INSTYLE RESIDENCY: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 30 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
LANDSCAPINGNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,500 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3075.0
Proposed, not sanctioned2,100 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSOLAPUR BRANCH

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogesh Hiremath
EngineerKARAN GOLANDE
EngineerGaurav Zawar
Chartered AccountantSAC & CO LLP
PartnerRole in project
T6 REALTY PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600005361Jul 2019 → Jul 2020

Reason as filed by the promoter(Due to change in project plan, hence we request you for the extension in time limit for our project till 16/07/2020.)

EXT52600010988Jul 2019 → Dec 2022

Reason as filed by the promoterExtension is needed Due to change in the plan and also please note that no units are sold and so no question of 51% allottees sign arises.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jun 2023

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 22-23.pdf30 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certficate 310323.pdf26 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE 310322.pdf26 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICATE 310323.pdf26 Jun 2023
Disclosure of sold/ booked inventoryFile: details of unsold inventory 310323.pdf26 Jun 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf26 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCH CERTIFICATE 300323.pdf22 Jun 2023
Certificates of CA (Form 3)File: Form 3 T6 Realty Private Limited 30062022 signed_compressed.pdf22 Jun 2023
Certificates of CA (Form 3)File: Form 3 T6 Realty Private Limited 30092022 signed_compressed.pdf22 Jun 2023
Certificates of CA (Form 3)File: Form 3 AS T6 Realty 30032023 both sign_compressed.pdf22 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: full occupancy certificate.pdf22 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Completion certificate.pdf22 Jun 2023
Details of encumbrances concerned to FinanceFile: encumbrance merged.pdf6 Mar 2023
Details of encumbrances concerned to LegalFile: encumbrance merged.pdf6 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discl of int rbz.pdf6 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discl of int sbz.pdf6 Mar 2023
Proforma of Allotment letterFile: form of allotement lette.pdf6 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank account for rera.pdf6 Mar 2023
Deviation Report with respect to Allotment letterFile: no deviation allotement letter.pdf6 Mar 2023
Deviation Report with respect to model copy of AgreementFile: no deviation copy of agreement.pdf6 Mar 2023
Certificates of CA (Form 3)File: Form 3 both signed_compressed.pdf27 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 t6 realty-fy 21-22 signed.pdf27 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 53-4 Vapar Parvana.pdf25 Jul 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE T6-converted.pdf14 Apr 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE T6-converted.pdf14 Apr 2022
Certificates of CA (Form 3)File: FORM 3 CA 311221-promoter signed copy.pdf13 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate (1)_compressed.pdf11 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE_compressed.pdf11 Apr 2022
CERSAI detailsFile: CERSAI CERTIFICATE t6 realty.pdf23 Mar 2022
Disclosure of sold/ booked inventoryFile: unsold inventory 311221-t6realty to be updated.pdf21 Mar 2022
Disclosure of sold/ booked inventoryFile: Disclosure SoldUnsold.pdf21 Oct 2021
Certificates of CA (Form 3)File: Form 3 - Sept 21- Sign.pdf21 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2 Certificates of CA (Form 5)-19-20.pdf18 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 3 Certificates of CA (Form 5)-20-21.pdf18 Oct 2021
Declaration about Commencement CertificateFile: Declaration of cc-format D.pdf12 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 30092021.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A 300921_compressed.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 300921_compressed.pdf12 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure SoldUnsold.pdf12 Oct 2021
Certificates of CA (Form 3)File: Form 3 - Sept 21- Sign.pdf12 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 31-03-2021.pdf1 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerrtificate 31032021.pdf1 Oct 2021
Certificates of CA (Form 3)File: Form 3 - T6 realty- 31-03-2021.pdf1 Oct 2021
Certificates of CA (Form 5)File: FORM 5 - Signed - 2019-20.pdf1 Oct 2021
Certificates of CA (Form 5)File: Form 5-2020-21.pdf1 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE 270821.pdf1 Sep 2021
Declaration in FORM BFile: Form B updeted.pdf10 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate.pdf10 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enggineer Certificate.pdf10 Jan 2020
Certificates of CA (Form 3)File: RERA Formats 18-19 Q 1.pdf10 Jan 2020
Certificates of CA (Form 3)File: RERA Formats 18-19 Q 2.pdf10 Jan 2020
Certificates of CA (Form 3)File: RERA Formats 18-19 Q 3.pdf10 Jan 2020
Certificates of CA (Form 3)File: RERA Formats 18-19 Q 4.pdf10 Jan 2020
Certificates of CA (Form 3)File: RERA Formats 19-20 Q 1.pdf10 Jan 2020
Certificates of CA (Form 3)File: RERA Formats 19-20 Q 2.pdf10 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf10 Jan 2020
Certificates of CA (Form 5)File: Signed Certificate.pdf29 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf10 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engeneers Certficate.pdf10 Aug 2018
Certificates of CA (Form 3)File: Signed Certificate.pdf10 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf26 Jul 2017
Certificates of CA (Form 3)File: CA certificate.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf24 Jul 2017
Details of encumbrancesFile: Self Declaration about encumbrance - t6 Realy Pvt.pdf20 Jul 2017
Declaration in FORM BFile: Form B.pdf20 Jul 2017
Building plan approvalFile: revised plan after premium fsi.pdf19 Jul 2017
Layout approvalFile: revised plan before premium fsi.pdf19 Jul 2017
Copy of the legal title reportFile: Search report.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: revised plan before premium fsi.pdf19 Jul 2017
Building Plan Approval (IOD)File: revised plan after premium fsi.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter.pdf19 Jul 2017
Proforma of Allotment letterFile: Allotment Letter T6.pdf19 Jul 2017
PAN CardFile: T 6 PAN.pdf18 Jul 2017

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 47 months
39%of Solapur registrations have lapsed or been cancelledthis one is completed

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep INSTYLE RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Solapur550+ in Solapur

2 kmINSTYLE RESIDENCYCompleted 23Lapsed / revoked 13Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 42 registered projects within 2 km.

Builder: T6 REALTY PVT LTD

T6 REALTY PVT LTD has 2 registrations on MahaRERA, including INSTYLE RESIDENCY and FOUR SEASONS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if INSTYLE RESIDENCY is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INSTYLE RESIDENCY?

The registered promoter entity is T6 REALTY PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INSTYLE RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INSTYLE RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INSTYLE RESIDENCY?

The professionals named in the filing: Architect: Yogesh Hiremath; Engineer: KARAN GOLANDE; Engineer: Gaurav Zawar; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INSTYLE RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INSTYLE RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INSTYLE RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.