Home / Browse projects / Nagpur, Maharashtra / INSIGHT
INSIGHT
RG-MH-03753 · RERA P50500030523 · Last updated on MahaRERA portal: 6 May 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INSIGHT is a Plotted project by OZEN DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500030523 on 30 Aug 2021. Possession was promised by 31 Dec 2023 and is now 34 months past that date. 44 of the 44 units on this registration are recorded sold or booked.
At a glance
Project
- NameINSIGHT
- TypePlotted
- Location
- PH NO 38
- WELA HARI
- Wela harichandra
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500030523
- ReraGenie IDRG-MH-03753
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on30 Aug 2021
- Promised completion31 Dec 2023
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed25 files
Current status
Figures as on 6 May 2023, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 6 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMIR VIJAYRAO SANDE |
| Engineer | SAMIR VIJAY RAO SANDE |
| Chartered Accountant | RAKESH THAKRE |
| Partner | Role in project |
|---|---|
| OZEN DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Aug 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Apr 2023
Documents filed25
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ozen Insight Form 5 2021 to 22.pdf | 6 May 2023 |
| Building plan approval or NA orderFile: N A Order.pdf | 5 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: N A Order.pdf | 5 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ozen Architect Certificate fORM 4.pdf | 5 Apr 2023 |
| Layout approvalFile: FINAL REVISED SANCTIONED LAYOUT PLAN.pdf | 9 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: FINAL REVISED SANCTIONED LAYOUT PLAN.pdf | 9 Mar 2023 |
| Layout approvalFile: NMRDA Sanction Letter for Lay Out- Vela Hari Ozen.pdf | 18 Aug 2021 |
| Building plan approval or NA orderFile: NMRDA Sanction Letter for Lay Out- Vela Hari Ozen.pdf | 18 Aug 2021 |
| Building plan approval or NA orderFile: Sanctioned Lay Out Plan from NMRDA Vela Hari Ozen.pdf | 18 Aug 2021 |
| PAN CardFile: PAN Ozen Developers.pdf | 18 Aug 2021 |
| Copy of the legal title reportFile: TITLE VERIFICATION REPORT VELA HARI OZEN DEVELOPER.pdf | 18 Aug 2021 |
| Details of encumbrancesFile: NON Encumbrance Certificate Ozen.pdf | 18 Aug 2021 |
| Copy of Layout Approval (in case of layout)File: NMRDA Sanction Letter for Lay Out- Vela Hari Ozen.pdf | 18 Aug 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: NMRDA Sanction Letter for Lay Out- Vela Hari Ozen.pdf | 18 Aug 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Lay Out Plan from NMRDA Vela Hari Ozen.pdf | 18 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: NMRDA Sanction Letter for Lay Out- Vela Hari Ozen.pdf | 18 Aug 2021 |
| Declaration about Commencement CertificateFile: FORM D Declaration of Commencement Ozen.pdf | 18 Aug 2021 |
| Declaration in FORM BFile: FORM B Ozen.pdf | 18 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Ozen.pdf | 18 Aug 2021 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER Vela Hari OZEN.pdf | 18 Aug 2021 |
| Proforma of Allotment letterFile: Proposed Agreement to Sell Draft Vela Hari OZEN.pdf | 18 Aug 2021 |
| OtherFile: PARTNERSHIP DEED OZEN.pdf | 18 Aug 2021 |
| OtherFile: Proposed SALE DEED Vela Hari Ozen.pdf | 18 Aug 2021 |
| OtherFile: SRO membership NAREDCO Ozen.pdf | 18 Aug 2021 |
| OtherFile: Project Land Sale Deed Ozen Developers.pdf | 18 Aug 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 25 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep INSIGHT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WELA HARI2,800+ in Nagpur
Filed coordinates, straight-line distance. 53 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: OZEN DEVELOPERS
OZEN DEVELOPERS has 5 registrations on MahaRERA, including INSIGHT and OZEN FLORENCE. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that INSIGHT shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if INSIGHT is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INSIGHT?
The registered promoter entity is OZEN DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INSIGHT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for INSIGHT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INSIGHT?
The professionals named in the filing: Architect: SAMIR VIJAYRAO SANDE; Engineer: SAMIR VIJAY RAO SANDE; Chartered Accountant: RAKESH THAKRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INSIGHT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback