ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / INFINITY OMKARA BUILDING D AND F

Registered No litigation declared Residential / Group Housing project

INFINITY OMKARA BUILDING D AND F

By INFINITY DEVELOPERS

RG-MH-82069 · RERA P51500056230 · Last updated on MahaRERA portal: 6 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
20 of 55Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 80%
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

INFINITY OMKARA BUILDING D AND F is a Residential / Group Housing project by INFINITY DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500056230 on 22 May 2024. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameINFINITY OMKARA BUILDING D AND F
  • TypeResidential / Group Housing
  • Location
    • KUMBHEFAL
    • Kubhephal
    • Aurangabad
    • 431007
  • Pincode431007
  • RERA no.P51500056230
  • ReraGenie IDRG-MH-82069

Builder

  • NameINFINITY DEVELOPERS
  • Entity typePartnership
  • PartnersSHAILESH DEVJIBHAI PATEL, NAVIN MANJIBHAI PATEL, MANOJ BABULAL JAIN
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed44 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING D WING ANA70000
BUILDING D WING BNA70000
BUILDING D WING CNA70000
BUILDING F WING ANA70000
BUILDING F WING BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 6 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

BUILDING D WING A45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D WING B45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D WING C45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING F WING A45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING F WING B45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed390

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots390
Closed/Covered195
Open Space195
BuildingClosed/CoveredOpen SpaceTotal
BUILDING D WING A393978
BUILDING D WING B393978
BUILDING D WING C393978
BUILDING F WING A393978
BUILDING F WING B393978

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,700 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11163.78
Proposed, not sanctioned9,464 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 13 SPACE OLYMPIA SUTGIRNI CHOWK CHHATRAPATI SAMBHAJI NAGAR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN SCOPE
EngineerGRIDS CONSULTANTS
Chartered AccountantSUDARSHAN KARWA AND CO
PartnerRole in project
INFINITY DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 June 24.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Sep 24.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Dec 24.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form-3 Declaration Jun 24.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form-3 Declaration Sep 24.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form-3 Declaration Dec 24.pdf6 Mar 2025
Building plan approvalFile: Revised Permission Drawing Infinity Developers compressed.pdf4 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Permission Drawing Infinity Developers compressed.pdf4 May 2024
Declaration about Commencement CertificateFile: Format D.pdf4 May 2024
Other - TechnicalFile: Sale deed Compressed.pdf4 May 2024
Other - TechnicalFile: Omkara Plot Declaration.pdf4 May 2024
Other - TechnicalFile: cc verification.pdf4 May 2024
Details of encumbrances concerned to FinanceFile: ENC.pdf22 Apr 2024
Details of encumbrances concerned to LegalFile: ENC.pdf22 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disc of Interest Praveen Patel.pdf22 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Amit Gangwal.pdf22 Apr 2024
Other - LegalFile: 16 Land Ownership Declaration.pdf22 Apr 2024
Other - LegalFile: Sale deed Compressed.pdf22 Apr 2024
Other - LegalFile: New Partnership deed.pdf22 Apr 2024
Other - FinanceFile: Partnership Deed Infinity.pdf22 Apr 2024
Other - TechnicalFile: 2 Commencement Certificates _ NA Order for plotted development.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: INFINITY Form-2 (O).pdf3 Apr 2024
Other - TechnicalFile: Infinity Developer Annexure 'A'.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (O).pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf2 Apr 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf1 Apr 2024
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf1 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf1 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf1 Apr 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf30 Mar 2024
PAN CardFile: INFINITY PAN.pdf30 Mar 2024
Copy of the legal title reportFile: INFINITY SEARCH REPORT.pdf30 Mar 2024
Details of encumbrances concerned to FinanceFile: NO LEGAL ENC.pdf30 Mar 2024
Details of encumbrances concerned to LegalFile: NO LEGAL ENC.pdf30 Mar 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf30 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Inifinity CC_compressed.pdf30 Mar 2024
Declaration in FORM BFile: Form-B.pdf30 Mar 2024
CERSAI detailsFile: CERSAI FIN ENC Declaration.pdf30 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disc of Interest Manoj Jain.pdf30 Mar 2024
Proforma of Allotment letterFile: Model Form of Allottment Letter.pdf30 Mar 2024
Proforma of Agreement for saleFile: ATS Draft RERA.pdf30 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format-A.pdf30 Mar 2024
Deviation Report with respect to Allotment letterFile: No Deviation Allo Letter.pdf30 Mar 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation Agree to Sale.pdf30 Mar 2024

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep INFINITY OMKARA BUILDING D AND F on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KUMBHEFAL1,400+ in Aurangabad

Builder: INFINITY DEVELOPERS

INFINITY DEVELOPERS has 3 registrations on MahaRERA, including INFINITY OMKARA and Legacy Millennia. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if INFINITY OMKARA BUILDING D AND F is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INFINITY OMKARA BUILDING D AND F?

The registered promoter entity is INFINITY DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INFINITY OMKARA BUILDING D AND F?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INFINITY OMKARA BUILDING D AND F?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INFINITY OMKARA BUILDING D AND F?

The professionals named in the filing: Architect: DESIGN SCOPE; Engineer: GRIDS CONSULTANTS; Chartered Accountant: SUDARSHAN KARWA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INFINITY OMKARA BUILDING D AND F?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INFINITY OMKARA BUILDING D AND F. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INFINITY OMKARA BUILDING D AND F to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.