INDRAYANI VATIKA F BUILDING

By SANSKRUTI DEVELOPERS

RG-MH-23014 · RERA P52100032443 · Last updated on MahaRERA portal: 29 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 90%
29 of 79Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

INDRAYANI VATIKA F BUILDING is a Others project by SANSKRUTI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100032443 on 4 Jan 2022. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 12 months from the original filing. 50 of the 79 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameINDRAYANI VATIKA F BUILDING
  • TypeOthers
  • Location
    • DEHU
    • Haveli
    • Pune
    • 412109
  • Pincode412109
  • RERA no.P52100032443
  • ReraGenie IDRG-MH-23014

Builder

  • NameSANSKRUTI DEVELOPERS
  • Entity typePartnership
  • PartnersDEEPAK BALASAHEB RAYKAR, VIKAS SHIVAJIRAO GAIKWAD
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked

Key dates

16 months past promisethis monthRegisteredJan 2022First promiseJun 2024Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Jan 2022
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed86 files

Current status

63%50 of 79 units booked

Figures as on 29 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INDRAYANI VATIKA F BUILDINGNA9979079

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

INDRAYANI VATIKA F BUILDING: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 29 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area450 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
KAMAL SAHADU BODAKEDEHUPune

Approvals and building plan

Sanctioning authorityDEHU NAGAR PANCHAYAT OFFICE
Permissible FSI5819.19
Proposed, not sanctioned4,219 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJM ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCS ARCHITECTS
EngineerAIJAJ NADAF NADAF
Chartered AccountantAMOL C DATAR AND ASSOCIATES
PartnerRole in project
SANSKRUTI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024337Jun 2024 → Jun 2025

Reason as filed by the promoterConstruction of the said project is 80% completed. We need extension to complete the pending work.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Aug 2023

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 01-04-2025.pdf29 May 2025
Form 2File: FORM 2 01-04-2025.pdf29 May 2025
Form 3File: FORM 3 01-04-2025.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 01-04-2025.pdf29 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-2024.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 12 2024 (1).pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 12 2024 (4).pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31 12 2024 (1).pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31 12 2024 (1).pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30 09 2024.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 09 2024 (2).pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 09 2024 (2).pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 09 2024 (3).pdf16 Dec 2024
Declaration in FORM BFile: 5 (1).pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-3-22.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-6-22.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-9-22.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-3-23.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-9-23.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-12-23.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-6-24.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 MARCH 2022.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 JUNE 2022.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 SEPT 2022.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 MARCH 2023.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 JUNE 2024.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 SEPT 2023.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 DEC 2023.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-2024.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SEPT 2023.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DEC 2023.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MARCH 2024.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JUNE 2024.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 2022.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2022.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 2023.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2023.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2023.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2024.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-2023.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-2024.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 04-05-24.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM 2A 04-05-24.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM 2 04-05-24.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGINEER CERTIFICATE FORM 2A 04-05-24.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 04-05-24.pdf4 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SANSKRUTI DEVELOPERS Part Completion-F-Wing and Club House.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 14-07-2023.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 14-07-2023.pdf14 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate Form 2A 14-07-2023.pdf14 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 14-07-2023.pdf14 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 14-07-2023.pdf14 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory.pdf23 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf21 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_compressed.pdf21 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A.pdf21 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 INDRAYANI VATIKA F WING 23-01-23 (2).pdf21 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5.pdf21 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised CA Certificate_compressed.pdf26 Sep 2022
Details of encumbrancesFile: Indrayani Vatika F bldg Encum.pdf20 Sep 2022
Proforma of Allotment letterFile: Final-Wing F- FLAT DRAFT-RERA - Indrayani Vatika- Sanskruti developer - Dehu SN 134 and 135 Sep 2022
Layout approvalFile: 01_compressed.pdf1 Apr 2022
Building plan approvalFile: 04_compressed.pdf1 Apr 2022
Building plan approvalFile: 05_compressed.pdf1 Apr 2022
Building plan approvalFile: 06_compressed.pdf1 Apr 2022
Copy of Layout Approval (in case of layout)File: 01_compressed.pdf1 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf1 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 05_compressed.pdf1 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 06_compressed.pdf1 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC (1)_compressed (1).pdf1 Apr 2022
Copy of the legal title reportFile: Dehu 134 flow of title certificate_compressed.pdf25 Dec 2021
Copy of the legal title reportFile: 134 dehu search report_compressed.pdf21 Dec 2021
Proforma of Allotment letterFile: Revised- 2- F- Agreement Draft.pdf13 Dec 2021
Layout approvalFile: Layout.pdf11 Dec 2021
Building plan approvalFile: F Building.pdf11 Dec 2021
PAN CardFile: 11-Sanskruti Pan (4).pdf11 Dec 2021
Copy of the legal title reportFile: 134 title report.pdf11 Dec 2021
Details of encumbrancesFile: No Encumbrance Certificate.pdf11 Dec 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf11 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: F Building.pdf11 Dec 2021

How this compares with Pune

63%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INDRAYANI VATIKA F BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEHU13,700+ in Pune

Builder: SANSKRUTI DEVELOPERS

SANSKRUTI DEVELOPERS has 6 registrations on MahaRERA, including INDRAYANI VATIKA and INDRAYANI VATIKA E BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that INDRAYANI VATIKA F BUILDING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if INDRAYANI VATIKA F BUILDING is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDRAYANI VATIKA F BUILDING?

The registered promoter entity is SANSKRUTI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDRAYANI VATIKA F BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INDRAYANI VATIKA F BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDRAYANI VATIKA F BUILDING?

The professionals named in the filing: Architect: CS ARCHITECTS; Engineer: AIJAJ NADAF NADAF; Chartered Accountant: AMOL C DATAR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDRAYANI VATIKA F BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDRAYANI VATIKA F BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDRAYANI VATIKA F BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.