Home / Browse projects / Raigarh, Maharashtra / Indiabulls Greens - 3

Completed No litigation declared Residential / Group Housing project

Indiabulls Greens - 3

By Lucina Land Development Limited

RG-MH-20213 · RERA P52000001590 · Last updated on MahaRERA portal: 6 Nov 2023

Source: official MahaRERA filing

Red flags

  • 22 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
22Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Indiabulls Greens - 3 is a Residential / Group Housing project by Lucina Land Development Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000001590 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2020. 22 complaints are on record with the regulator.

At a glance

Project

  • NameIndiabulls Greens - 3
  • TypeResidential / Group Housing
  • Location
    • Sawala Apta Road
    • Panvel
    • Kon
    • Raigarh
    • 410207
  • Pincode410207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000001590
  • ReraGenie IDRG-MH-20213

Builder

  • NameLucina Land Development Limited
  • Entity typeCompany
  • Executive DirectorMeyyappan Ramanathan
  • Non-executive DirectorsSsatyajit Parrihaar, Manish Riyal
  • Other registrations8 more →
  • Completed4 of 9

Key dates

this monthRegisteredJul 2017PromisedDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2020
  • Revised completionNone
  • Buildings3 building records
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
14G1NA430000
15BNA430000
16ANA430000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

14G1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
15B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
16A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities28

As on 6 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Amphitheatre steps Deck with PergolaYes100%
Badminton CourtYes100%
Cricket Net Practice Space prov for CrecheYes100%
Swimming poolYes100%
Senior citizens’ areaYes100%
Multipurpose LawnYes100%
Multipurpose courtYes100%
Kids’ poolYes100%
Kids Play AreaYes100%
Gymnasium and Yoga StepsYes100%
Half basketballYes100%
Indoor SportsYes100%
Jogging / Walking trackYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,021 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI46810.22
Proposed, not sanctioned46,310 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAtlanta, Nariman Point, Mumbai- 400 023

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnupam De & Associates
ArchitectOctave Consultants
ArchitectRakhi Ubhare
EngineerMr Ramesh Rampure
Chartered AccountantAgarwal Prakash & Co
Chartered AccountantSundar Venkataraman & Co
Chartered AccountantBagaria & Co LLP
PartnerRole in project
Lucina Land Development Limited-

Complaints filed with MahaRERA22

Case no.ComplainantRespondentFiled
CC006000000000030Sanjay MadiaVishal Gaurishankar Damani15/01/2019
CC006000000000247Ganesh More & Mathura MoreLucina Land Development Ltd24/10/2017
CC006000000054708SUJATHA PRASHANT SHETHM/s LUCINA LAND DEVELOPMENT LIMITED26/06/2018
CC006000000000905SIDDHARTH PATRAVALISHARAD AGARWAL & VISHAL DAMANI OF LUCINA LAND DEVELOPMENT LTD, KAPIL SINGH, POONAM RANI, ZILE SINGH14/11/2017
CC006000000001027Adil DoctorIndia Bulls06/11/2017
CC006000000001391HAWA PETTIWALAVishal Gaurishankar Damani23/10/2017
CC006000000012126SAVITHRI SURESHLUCINA LAND DEVELOPMENT LIMITED16/12/2017
CC006000000055387SAVITHRI SURESHLUCINA LAND DEVELOPMENT LTD21/07/2018
CC006000000023519Ritesh OzaLucina Land developement ltd25/02/2019
CC006000000012508Virjanand RastogiIndiabulls Real Estate Limited/ Lucina Land Development06/01/2018
CC006000000055311DEBASMITA MOHANTY AND BIRENDRA MOHANTYLUCINA LAND DEVELOPMENT LTD09/07/2018
CC006000000057636Yash KumarLucina Land Development Ltd11/01/2019
CC006000000058128Sapan ChaturvediM/s Lucina Land Development Limited22/02/2019
CC006000000161305Chetan sheth and Shubhangi ShethLucina Land Development Limited through its Directors19/10/2019
CC006000000089843Nitin Prabhalar Parab & Bipin Prabhakar ParabLucina Land DevelopersLimited28/06/2019
CC006000000141096KA BhanuprakashLucina Land Development Ltd01/10/2019
CC006000000195941Ajay Vijaykumar JainM/s Lucina Land Development Limited08/02/2021
CC006000000193233Neha GoyalLucina Land Development Limited13/10/2020
CC006000000198480SAKET MAHESHWARILucina Land Development Limited27/09/2021
CC006000000199016Shivratan SinghiM/s Lucina Land Development Limited29/09/2022
CC006000000193234Rajender Prasad MittalLucina Land Development Limited13/10/2020
CC12501852Lucina Land Development LimitedDinesh Ramdas Thorat05/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Greens -3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Greens-3_.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Greens-3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Greens-3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Green-3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Greens-3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Greens-3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: INDIABULLS GREEN 3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Panvel Green - 3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IB greens-3.pdf6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Greens 3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Green 3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Green 3.pdf6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Green 3.PDF6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Panvel Green Phase 3 Architect Certificate.pdf6 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase Green 3 Architect Certificate .pdf6 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Greens-3.PDF6 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Greens-3.PDF6 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Greens -3.PDF6 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Green-3.PDF6 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Green-3.PDF6 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Greens -3.PDF6 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Greens -3.PDF6 Nov 2023
Form 2AFile: Quality Assurance Certificate-Indiabulls Greens Panvel-3.PDF6 Nov 2023
Certificates of CA (Form 3)File: Indiabulls Greens 3.pdf6 Nov 2023
Certificates of CA (Form 3)File: Indiabulls Greens_Phase 3_compressed.pdf6 Nov 2023
Certificates of CA (Form 3)File: Indiabulls Greens Phase 3.pdf6 Nov 2023
Certificates of CA (Form 3)File: Indiabulls Greens Panvel Phase 3.pdf6 Nov 2023
Certificates of CA (Form 3)File: Indiabulls Greens_Phase 3_compresse.pdf6 Nov 2023
Details of encumbrancesFile: lldl.pdf3 Apr 2023
Details of encumbrancesFile: LLDL - Greens.pdf21 May 2021
Details of encumbrancesFile: Greens - Encumbrance.PDF23 Jul 2019
Certificates of Architect (Form 4)File: Form 4 for Indiabulls Greens 3.PDF6 May 2019
Form 2AFile: FORM 2A - Indiabulls Greens 3.PDF22 Feb 2019
Certificates of CA (Form 5)File: Green Panvel 3.pdf17 Oct 2018
Details of encumbrancesFile: Greens Encumbrance.pdf2 Feb 2018
Building plan approvalFile: IOD-1.pdf25 Jul 2017
Building plan approvalFile: IOD-2.pdf25 Jul 2017
Building plan approvalFile: IOD-3.pdf25 Jul 2017
Copy of the legal title reportFile: Title Certificate Indiabulls Greens.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD-1.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD-2.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD-3.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: IOD-1.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: IOD-2.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: IOD-3.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE GREENS PANVEL-3.PDF25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Phase 3.pdf25 Jul 2017
Certificates of CA (Form 3)File: Greens Panvel 1 Phase 3.pdf25 Jul 2017
Proforma of Allotment letterFile: Panvel 1 agreement and booking form.pdf25 Jul 2017
Layout approvalFile: Approved and Porposed Layout.pdf24 Jul 2017
PAN CardFile: PAN - Lucina Land Development Ltd.PDF24 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate- Panvel Phase 1.pdf24 Jul 2017
Copy of Layout Approval (in case of layout)File: Approved and Porposed Layout.pdf24 Jul 2017
Declaration in FORM BFile: Form B Panvel .pdf24 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Indiabulls Greens - 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmIndiabulls Greens - 3Completed 10Lapsed / revoked 2Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: Lucina Land Development Limited

Lucina Land Development Limited has 9 registrations on MahaRERA, including Indiabulls Park 1 and Indiabulls Park 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Indiabulls Greens - 3 is delayed beyond 30 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Indiabulls Greens - 3?

The registered promoter entity is Lucina Land Development Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Indiabulls Greens - 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Indiabulls Greens - 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Indiabulls Greens - 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Indiabulls Greens - 3?

The professionals named in the filing: Architect: Anupam De & Associates; Architect: Octave Consultants; Architect: Rakhi Ubhare; Engineer: Mr Ramesh Rampure; Chartered Accountant: Agarwal Prakash & Co; Chartered Accountant: Sundar Venkataraman & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Indiabulls Greens - 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Indiabulls Greens - 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Indiabulls Greens - 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.