Home / Browse projects / Nagpur, Maharashtra / IMPERIAL HEIGHTS
IMPERIAL HEIGHTS
By IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA
RG-MH-02357 · RERA P50500012942 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 144 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
IMPERIAL HEIGHTS is a Residential / Group Housing project by IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA in Nagpur, Maharashtra, registered with MahaRERA as P50500012942 on 7 Sep 2017. Possession is promised by 31 Dec 2035. The completion date has moved by 144 months from the original filing.
At a glance
Project
- NameIMPERIAL HEIGHTS
- TypeResidential / Group Housing
- Location
- Rengapar
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500012942
- ReraGenie IDRG-MH-02357
Builder
- NameIMPERIAL GRUH NIRMAN SAHAKARI SANSTHA
- Entity typeSociety
- ChairpersonSANJAY VITTHALDAS JARIWALA
- SecretorySANJAY GANPATRAO PATIL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Sep 2017
- Promised completion31 Dec 2035
- Revised completionRevised to 31 Dec 2035 (originally 30 Dec 2023)
- Buildings10 building records
- Documents filed164 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-G | NA | 6 | 0 | 0 | 0 | 0 |
| WING-H | NA | 6 | 0 | 0 | 0 | 0 |
| Wing-A | NA | 7 | 0 | 0 | 0 | 0 |
| Wing-F | NA | 5 | 0 | 0 | 0 | 0 |
| WING-I | NA | 6 | 0 | 0 | 0 | 0 |
| WING-J | NA | 6 | 0 | 0 | 0 | 0 |
| WING-E | NA | 6 | 0 | 0 | 0 | 0 |
| WING-D | NA | 6 | 0 | 0 | 0 | 0 |
| WING-C | NA | 6 | 0 | 0 | 0 | 0 |
| WING-B | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building10
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
48 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Internal walls, at 80%.
WING-G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING-H91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing-A27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 1% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing-F0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-I91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING-J91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING-E78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 38% |
WING-D0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-C0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-B0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 99% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 97% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 97% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 60% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING-G | 1 | 1 |
| WING-H | 1 | 1 |
| Wing-A | 1 | 1 |
| Wing-F | 1 | 1 |
| WING-I | 1 | 1 |
| WING-J | 1 | 1 |
| WING-E | 1 | 1 |
| WING-D | 1 | 1 |
| WING-C | 1 | 1 |
| WING-B | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NAVIN LANJEWAR |
| Engineer | P GHUSE |
| Partner | Role in project |
|---|---|
| IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO REVISED SANCTION OF OTHER BUILDINGS
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 May 2023
Documents filed164
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 164 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM-1 IMPERIAL HEIGHT MARCH 2026.pdf | 17 Apr 2026 |
| Form 2File: FORM-2 MARCH 2026 IMPERIAL HEIGHTS.pdf | 17 Apr 2026 |
| Form 3File: FORM-3 IMPERIAL HEIGHTS MAR-2026 SC.pdf | 17 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH 2026 2.pdf | 17 Apr 2026 |
| Form 1File: FORM-1 DEC-2025 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 DEC-2025 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 DEC-2025.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD DEC-2025.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 SEP-2025 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 SEP-2025 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 SEP-2025.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD SEP-2025.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 JUN-2025 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 JUN-2025 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 JUN-2025.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD JUN-2025.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 MAR-2025 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 MAR-2025 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 MAR-2025.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD MAR-2025.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 DEC-2024 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 DEC-2024 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 DEC-2024.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD DEC-2024.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 SEP-2024 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 SEP-2024 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 SEP-2024.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD SEP-2024.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 JUN-2024 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 JUN-2024 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 JUN-2024.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD JUN-2024.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 MAR-2024 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 MAR-2024 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 MAR-2024.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD MAR-2024.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 DEC-2023 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 DEC-2023 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 DEC-2023.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD DEC-2023.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 SEP-2023 IMPERIAL HEIGHT.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 SEP-2023 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 SEP-2023.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD SEP-2023.pdf | 2 Apr 2026 |
| Form 1File: FORM-1 JUN-2023.pdf | 2 Apr 2026 |
| Form 2File: FORM-2 JUN-2023 IMPERIAL HEIGHTS.pdf | 2 Apr 2026 |
| Form 3File: FORM-3 JUN-2023.pdf | 2 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD JUN-2023.pdf | 2 Apr 2026 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM -5 Imperial Heights 18-19 c.pdf | 25 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM -5 Imperial heights 19-20 c.pdf | 25 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM -5 Imperial Heights 20-21 c.pdf | 25 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM -5 Imperial Heights 21-22 c.pdf | 25 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM -5 imperial heights 22-23 c.pdf | 25 Apr 2024 |
| Declaration about Commencement CertificateFile: Format D Imperial heights_compressed.pdf | 6 Dec 2023 |
| Building plan approvalFile: Building plan.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: Building plan.pdf | 23 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 23 Aug 2023 |
| Declaration in FORM BFile: FORM B Imperial Gruh Nirman_.pdf | 23 Aug 2023 |
| Proforma of Allotment letterFile: Imperial Heights Allotment_compressed.pdf | 23 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Imperial Heights_compressed.pdf | 23 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Imperial Heights Deviation Report Allotment Letter.pdf | 23 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Imperial Heights Deviation Report_ ATS.pdf | 23 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Heights _Form-2-Engineers Certificate_Sept-18.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Heights _Form-2-Engineers Certificate_Sept-18.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_DEC 18_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_MAR 19_C.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_JUN 19_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_SEP 19_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_DEC 19_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Heights _Form-2-Engineers Certificate_Mar-20.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Heights _Form-2-Engineers Certificate_June-20.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_SEP 20_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_DEC 20_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Heights _Form-2-Engineers Certificate_Mar-21.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Heights _Form-2-Engineers Certificate_June-21.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_SEP 21_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_DEC 21_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_MAR 22_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMPERIAL HEIGHTS_FORM 2_JUN 22_c.pdf | 14 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Heights _Form-2-Engineers Certificate_Sep-22.pdf | 14 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 164 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep IMPERIAL HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Rengapar2,800+ in Nagpur
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA
IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA has 1 registration on MahaRERA, including IMPERIAL HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if IMPERIAL HEIGHTS is delayed beyond 31 Dec 2035?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of IMPERIAL HEIGHTS?
The registered promoter entity is IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in IMPERIAL HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for IMPERIAL HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at IMPERIAL HEIGHTS?
The professionals named in the filing: Architect: NAVIN LANJEWAR; Engineer: P GHUSE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in IMPERIAL HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.