ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / IMPERIAL CROWN

Registered No litigation declared Others project

IMPERIAL CROWN

By DYNAMIC ENTERPRISES

RG-MH-04417 · RERA P52000021766 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
7 of 11Construction stages donefurthest along: Installation of Lifts, 88%
55 of 174Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

IMPERIAL CROWN is a Others project by DYNAMIC ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000021766 on 23 Jul 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 119 of the 174 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameIMPERIAL CROWN
  • TypeOthers
  • Location
    • Rasayani
    • Chawane
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000021766
  • ReraGenie IDRG-MH-04417

Builder

  • NameDYNAMIC ENTERPRISES
  • Entity typePartnership
  • PartnersAshok Parushottam Vasani, Mahesh Karsan Gandhi, Jivraj Harilal Devda, Pravin Ramjibhai Rajput, Hitesh Harilal Dewda, Velji Ranchod Patel, Paresh Maneklal Patel, Pradeep Avchar Barvadiya, Mansukhlal Parsotambhai Vasani

Key dates

this monthRegisteredJul 2019First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed56 files

Current status

68%119 of 174 units booked
77.1%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IMPERIAL CROWNNA131316212174

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 88%.

IMPERIAL CROWN: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.88%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed229

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots229
Closed/Covered229

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,090 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCollector of Raigad
Permissible FSI6398.76
Proposed, not sanctioned6,399 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai Chambers Shop No -8 9 10 and 72 , Plot No 44 CBD Belapur
Estimated costRs 22.08 cr
Cost incurredRs 17.03 cr
Work done77.12%
BuildingWingEstimatedIncurred
IMPERIAL CROWNNARs 19.80 crRs 17.03 cr
-NARs 2.28 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDestination Architecture Interior Designs
EngineerHitesh Kantilal Parasiya
EngineerS. V. Patel & Associates
Chartered AccountantPratik N Pandya & Complany
Chartered AccountantJDC & ASSOCIATES LLP
PartnerRole in project
DYNAMIC ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07022619762Dec 2025 → Dec 2026

Reason as filed by the promoterThe project construction is substantially completed and only minor finishing works remain. However, the application for Occupancy Certificate (OC) is currently pending due to delay in approvals from the concerned local authority. Since the issuance of OC is essential for project completion and handover, additional time is required to obtain the same. The delay is purely administrative and beyond the control of the promoter. Therefore, an extension is sought to complete the remaining minor works and secure the Occupancy Certificate in compliance with RERA provisions

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 2024-2025.pdf11 Jun 2026
Form 5 (FY 2023-2024)File: DE Form 5 2023-24.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 - Imperial Crown as on March 2026.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2 - Imperial Crown as on March 2026.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3 - Imperial Crown as on March 2026.pdf3 Jun 2026
Withdrawal Update Form 1File: Form 1 - Imperial Crown as on Dec 2025.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2 - Imperial Crown as on Dec 2025.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 - Imperial Crown as on Dec 2025.pdf6 Feb 2026
Form 1File: Form 1 - Imperial Crown as on June 2025.pdf29 Dec 2025
Form 2File: Form 2 - Imperial Crown as on June 2025.pdf29 Dec 2025
Form 3File: Form 3 - Imperial Crown as on June 2025_.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Imperial Crown as on June 2025_.pdf29 Dec 2025
Form 1File: Form 1 - Imperial Crown as on Sept 2025.pdf29 Dec 2025
Form 2File: Form 2 - Imperial Crown as on Sept 2025.pdf29 Dec 2025
Form 3File: Form 3 - Imperial Crown as on Sept 2025_.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Imperial Crown as on Sept 2025_.pdf29 Dec 2025
Form 1File: Imperial Crown - Form 1 March 2025.pdf21 Jun 2025
Form 2File: Imperial Crown Form 2 March 2025.pdf21 Jun 2025
Form 3File: Imperial Crown - Form 3 March 2025.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold - Unsold list March 2025.pdf21 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Imperial Crown as on Dec 2023.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Imperial Crown as on Dec 2023.pdf2 Feb 2024
Certificates of CA (Form 3)File: Form 3 - Imperial Crown as on Dec 2023_compressed.pdf2 Feb 2024
Certificates of CA (Form 3)File: Form 3 New.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Sep 2023
Certificates of CA (Form 3)File: Form 3.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Feb 2023
Certificates of CA (Form 3)File: Form 3.pdf9 Feb 2023
Declaration about Commencement CertificateFile: Imperial Crown Format D.pdf6 Jan 2023
CERSAI detailsFile: Imperial Crown.pdf7 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Imperial Crown Form 5.pdf1 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Dynamic Enterprises.pdf30 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: img06528_rotated_compressed.pdf23 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Imperial Crown RERA CERTIFICATE.pdf23 Aug 2021
Certificates of CA (Form 3)File: Form 3 Dynamic Enterprise Certificate (Imperial Crown) 1.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2019-2020.pdf23 Aug 2021
Disclosure of sold/ booked inventoryFile: IMPERIAL CROWN.pdf31 May 2021
Building plan approvalFile: Sheet 1.pdf20 Jul 2019
Layout approvalFile: Sheet 1.pdf20 Jul 2019
Layout approvalFile: MYSCAN_20190703_0002(1).pdf20 Jul 2019
Layout approvalFile: MYSCAN_20190703_0006(1).pdf20 Jul 2019
Layout approvalFile: MYSCAN_20190703_0004(1)_compressed.pdf20 Jul 2019
Details of encumbrancesFile: encumbrance imperial.pdf20 Jul 2019
Copy of Layout Approval (in case of layout)File: Sheet 1.pdf20 Jul 2019
Copy of Layout Approval (in case of layout)File: MYSCAN_20190703_0002(1).pdf20 Jul 2019
Copy of Layout Approval (in case of layout)File: MYSCAN_20190703_0006(1).pdf20 Jul 2019
Copy of Layout Approval (in case of layout)File: MYSCAN_20190703_0004(1)_compressed.pdf20 Jul 2019
Building Plan Approval (IOD)File: Sheet 1.pdf20 Jul 2019
Declaration in FORM BFile: form B imperial.pdf20 Jul 2019
Proforma of Allotment letterFile: Agreement Draft - Imperial Crown .pdf20 Jul 2019
Copy of the legal title reportFile: SEARCH REPORT IMPERIAL _compressed.pdf19 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: imperial Crown cc_compressed-1-8.pdf19 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: imperial Crown cc_compressed-9-13.pdf19 Jul 2019
Certificates of CA (Form 3)File: Form 3_compressed.pdf19 Jul 2019

How this compares with Raigarh

68%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IMPERIAL CROWN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rasayani5,900+ in Raigarh

2 kmIMPERIAL CROWNCompleted 3Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: DYNAMIC ENTERPRISES

DYNAMIC ENTERPRISES has 1 registration on MahaRERA, including IMPERIAL CROWN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if IMPERIAL CROWN is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IMPERIAL CROWN?

The registered promoter entity is DYNAMIC ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IMPERIAL CROWN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IMPERIAL CROWN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IMPERIAL CROWN?

The professionals named in the filing: Architect: Destination Architecture Interior Designs; Engineer: Hitesh Kantilal Parasiya; Engineer: S. V. Patel & Associates; Chartered Accountant: Pratik N Pandya & Complany; Chartered Accountant: JDC & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IMPERIAL CROWN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IMPERIAL CROWN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IMPERIAL CROWN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.