Home / Browse projects / Mumbai Suburban, Maharashtra / I SPACE URBAN VISTA

Registered No litigation declared Others project

I SPACE URBAN VISTA

By RT HOUSING PRIVATE LIMITED & SHREE SHANTEE DEVELOPERS

RG-MH-07188 · RERA P51800054640 · Last updated on MahaRERA portal: 18 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedmoved 22 months from the original
3 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 14%
72 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

I SPACE URBAN VISTA is a Others project by RT HOUSING PRIVATE LIMITED & SHREE SHANTEE DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054640 on 2 Feb 2024. Possession is promised by 30 Jun 2029. The completion date has moved by 22 months from the original filing. 0 of the 72 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.

At a glance

Project

  • NameI SPACE URBAN VISTA
  • TypeOthers
  • Location
    • EKSAR ROAD
    • BORIVALI WEST
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • RERA no.P51800054640
  • ReraGenie IDRG-MH-07188

Builder

  • NameRT HOUSING PRIVATE LIMITED & SHREE SHANTEE DEVELOPERS
  • Entity typeCompany
  • CINU68100MH2024PTC433849
  • PartnersDHARMESH BHARAT RATHOD, CHANDRAVADAN JAGANBHAI SURTI

Key dates

this monthRegisteredFeb 2024First promiseAug 2027Revised toJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2024
  • Promised completion30 Jun 2029
  • Revised completionRevised to 30 Jun 2029 (originally 31 Aug 2027)
  • Buildings2 building records
  • Documents filed73 files

Current status

0%0 of 72 units booked
23.0%Work done, per cost certificate

Figures as on 18 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GROWTH 150 SALE COMM AND WING BNA87142034
GROWTH 150 WING ANA141338038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 14%.

GROWTH 150 SALE COMM AND WING B29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure14%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks7%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GROWTH 150 WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Closed/Covered65
BuildingClosed/CoveredTotal
GROWTH 150 SALE COMM AND WING B3333
GROWTH 150 WING A3232

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,532 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
PANCHVATI SADAN CO-OPERATIVE HOUSING SOCIETY LTDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI12629.31
Proposed, not sanctioned2,720 sq m
Buildings approved4
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP No 1 Esspee Tower DATTAPADA ROAD BORIVALI EAST 400066
Estimated costRs 17.65 cr
Cost incurredRs 4.06 cr
Work done23.03%
BuildingWingEstimatedIncurred
GROWTH 150 SALE COMM AND WING BNARs 17.65 crRs 4.06 cr

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR ARCHITECT AND CONSULTANTS
EngineerVISHAL NIKAM
EngineerKailash Gumanaram Anwala
EngineerRavi Gohil
EngineerUNISTEPS CONSULTING
Chartered AccountantABHISHEK CHOUDHARY
Chartered AccountantPiyush Parasmal Jain
Chartered AccountantR H SHUKLA & ASSOCIATES
Chartered AccountantHARDIK SAVLA&ASSOCIATES
Chartered AccountantSmit M Shah
PartnerRole in project
RT HOUSING PRIVATE LIMITED & SHREE SHANTEE DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800054640/WarAug 2027 → Dec 2027

Reason as filed by the promoterNA

EA17092638933Aug 2027 → Jun 2029

Reason as filed by the promoterThe approvals for the upper floors proposed in the project could not be obtained due to some technical issues and as such the full potential FSI could not be generated. These issues have now been resolved and we have already prepared the revised plans for the project. Further, the N.O.C. by the Chief Fire Officer of MCGM has also been received and we are in the process of obtaining amended IoD. Accordingly, the revised timelines for construction of the project has been prepared and same is submitted in the CPM chart along with this application for extension. We are also submitting the consents

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5_2026_Rudra Pinnacle.pdf18 Sep 2026
Withdrawal Update Form 1File: form 1 comp.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3_June 26_Pinnacle_LH.pdf12 Aug 2026
Form 2A (FY 2024-2025)File: form 2A (engineer certificate) Panchavati march 2025.........pdf6 Aug 2026
Form 2A (FY 2025-2026)File: form 2 2025-26.pdf5 Aug 2026
Withdrawal Update Form 1File: Form -I -Rudra Pinnacle.pdf17 Jul 2026
Withdrawal Update Form 1File: Form -I -Rudra Pinnacle.pdf17 Jul 2026
Withdrawal Update Form 1File: Form -I -Rudra Pinnacle.pdf17 Jul 2026
Withdrawal Update Form 2File: Rudra Pinnacle Form 2.pdf17 Jul 2026
Withdrawal Update Form 2File: Rudra Pinnacle Form 2.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2 Panchavti Sadan 31032026.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3_Mar 26_Pinnacle.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3_Mar 26_Pinnacle.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3_Mar 26_Pinnacle.pdf17 Jul 2026
Withdrawal Update Form 1File: Rudra Pinncle form 1.pdf3 Apr 2026
Withdrawal Update Form 2File: Rudra Pinnacle Form 2.pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3 Rudra Pinnacle.pdf3 Apr 2026
Withdrawal Update Form 1File: Form1.pdf22 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 - 21112025 - Rudra Pinnacle.pdf22 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 SSD (1).pdf17 Jan 2026
Building plan approvalFile: Panchavati Amended IOA.pdf15 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Shree Shantee Developers 25042025 (1).pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 (1).pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_signed.pdf30 Jan 2024
Details of encumbrances concerned to FinanceFile: Annexure A SSD.pdf25 Jan 2024
Details of encumbrances concerned to FinanceFile: Declaration cum undertaking (2).pdf25 Jan 2024
Details of encumbrances concerned to LegalFile: Annexure A SSD.pdf25 Jan 2024
Details of encumbrances concerned to LegalFile: Declaration cum undertaking (2).pdf25 Jan 2024
Other - FinanceFile: Declaration cum undertaking (2).pdf24 Jan 2024
Other - FinanceFile: Annexure A SSD.pdf24 Jan 2024
Other - TechnicalFile: Annexure A SSD.pdf24 Jan 2024
Other - TechnicalFile: Declaration cum undertaking (2).pdf24 Jan 2024
Other - LegalFile: Declaration cum undertaking (2).pdf20 Jan 2024
Other - LegalFile: Annexure A SSD.pdf20 Jan 2024
Layout approvalFile: 01_11zon.pdf18 Jan 2024
Layout approvalFile: 03_11zon.pdf18 Jan 2024
Layout approvalFile: 04_11zon.pdf18 Jan 2024
Layout approvalFile: 05_11zon.pdf18 Jan 2024
Layout approvalFile: 06_11zon.pdf18 Jan 2024
Layout approvalFile: 07_11zon.pdf18 Jan 2024
Layout approvalFile: 08_11zon.pdf18 Jan 2024
Building plan approvalFile: Panchavati IOA.pdf18 Jan 2024
Layout approvalFile: 02_11zon.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 01_11zon.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 03_11zon.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 04_11zon.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 05_11zon.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 06_11zon.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 07_11zon.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 08_11zon.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 02_11zon.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Panchavati IOA.pdf18 Jan 2024
Other - TechnicalFile: CC CONFIRMATION FROM SRA.pdf18 Jan 2024
Copy of the legal title reportFile: Title Report RERA SSD-Panchavati-Growth 30122023.pdf2 Jan 2024
Declaration about Commencement CertificateFile: CC declaration Panchavati 18012024.pdf2 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A disclosure of interest in other real estates_Chandresh Surti.pdf2 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A disclosure of interest in other real estates_Dharmesh.pdf2 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200289153852_For_Asset_Based_Search_05_12_2023_17_15_40_370.pdf19 Dec 2023
Proforma of Agreement for saleFile: AFS for pANCHAVATI-SHREE SHANTI-15122023.pdf19 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report on AFS-19122023.pdf19 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1Architect Certificate.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate.pdf29 Nov 2023
PAN CardFile: Shree Shantee Developers Pan Card.pdf28 Nov 2023
Details of encumbrances concerned to FinanceFile: Encumbrnace details.pdf28 Nov 2023
Details of encumbrances concerned to LegalFile: Encumbrnace details.pdf28 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Shree Shantee Plinth CC issued.pdf28 Nov 2023
Declaration in FORM BFile: Form B Promoter.pdf28 Nov 2023
Proforma of Allotment letterFile: final Allotment Letter panchvati-Growth- 24112023.pdf28 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Account.pdf28 Nov 2023
Deviation Report with respect to Allotment letterFile: DEVIATION to ALLOTMENT LETTER.pdf28 Nov 2023

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 22 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep I SPACE URBAN VISTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI WEST6,700+ in Mumbai Suburban

Builder: RT HOUSING PRIVATE LIMITED & SHREE SHANTEE DEVELOPERS

RT HOUSING PRIVATE LIMITED & SHREE SHANTEE DEVELOPERS has 1 registration on MahaRERA, including I SPACE URBAN VISTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if I SPACE URBAN VISTA is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of I SPACE URBAN VISTA?

The registered promoter entity is RT HOUSING PRIVATE LIMITED & SHREE SHANTEE DEVELOPERS, a company as per the filing. Its CIN U68100MH2024PTC433849 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in I SPACE URBAN VISTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for I SPACE URBAN VISTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at I SPACE URBAN VISTA?

The professionals named in the filing: Architect: AAKAR ARCHITECT AND CONSULTANTS; Engineer: VISHAL NIKAM; Engineer: Kailash Gumanaram Anwala; Engineer: Ravi Gohil; Engineer: UNISTEPS CONSULTING; Chartered Accountant: ABHISHEK CHOUDHARY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in I SPACE URBAN VISTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About I SPACE URBAN VISTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save I SPACE URBAN VISTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.