Hubtown Greenwoods A wing

By Hubtown Limited

RG-MH-09579 · RERA P51700000365 · Last updated on MahaRERA portal: 17 Nov 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 2 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2018Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Stilt Floor, 97%
0Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

Hubtown Greenwoods A wing is a Residential / Group Housing project by Hubtown Limited in Thane, Maharashtra, registered with MahaRERA as P51700000365 on 15 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2018. The completion date has moved by 2 months from the original filing.

At a glance

Project

  • NameHubtown Greenwoods A wing
  • TypeResidential / Group Housing
  • Location
    • Pokhran Road No.1
    • Near Vartak Nagar
    • VARTAKNAGAR
    • Thane
    • 400606
  • Pincode400606
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700000365
  • ReraGenie IDRG-MH-09579

Builder

  • NameHubtown Limited
  • Entity typeCompany
  • DirectorsShailesh Ghisulal Hingarh, Abhijeet Bireshchandra Datta
  • Other registrations19 more →
  • Completed11 of 20
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseJul 2018Revised toSep 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2017
  • Promised completion30 Sep 2018
  • Revised completionRevised to 30 Sep 2018 (originally 31 Jul 2018)
  • Buildings1 building record
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hubtown Greenwoods A wingNA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Nov 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 97%.

Hubtown Greenwoods A wing: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor97%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%

Progress on shared amenities15

As on 17 Nov 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes65%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes55%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingYes30%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes45%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes60%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered88
Open Space12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area425 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7073.16
Proposed, not sanctioned7,073 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIDC Andheri E Mumbai

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs Spaceage Consultants Mr Shashi Jadhav
EngineerRajeevan Paramban
Chartered AccountantMH Dalal & Association
Chartered AccountantParashar Darji
PartnerRole in project
Hubtown Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700000522Jul 2018 → Jul 2019

Reason as filed by the promoterApplied for OC expected in a months time

Litigation declared4

CaseCourtStatus
525 OF 2014/2014Consumer court Mumbai for filing Written Statement
CC No 597 of 2015/2015State CommissionNA
M A No 206 of 2015/2015Thane Courtna
Writ Petition No 7949 of 2015/2015Bombay High CourtNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Hubtown Greenwoods A CHS LTD.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Greenwoods A.pdf5 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Greenwoods A.pdf31 Oct 2018
Certificates of CA (Form 3)File: CA Form 3 Greenwoods A wing.pdf26 Oct 2018
Certificates of CA (Form 5)File: CA Form 5 Greenwoods A wing.pdf26 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 41011.pdf20 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 070113.pdf20 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 101213.pdf20 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A WING.pdf10 Aug 2018
Certificates of Architect (Form 4)File: FORM - IV A WING.pdf10 Aug 2018
OtherFile: OC A,C Wing.pdf10 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Greenwoods A Wing.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WING - A.pdf29 Mar 2018
OtherFile: Sample Agreement - Greenwood.pdf9 Dec 2017
Building plan approvalFile: CC Greenwoods A,B,C,D.pdf10 Jul 2017
Layout approvalFile: Layout Greenwoods.pdf10 Jul 2017
Copy of the legal title reportFile: Title Report Greenwoods- JSA.pdf10 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Greenwoods.pdf10 Jul 2017
Building Plan Approval (IOD)File: CC Greenwoods A,B,C,D.pdf10 Jul 2017
Declaration in FORM BFile: Form B Greenwoods A.pdf10 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Form I Greenwoods A wing.pdf10 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Greenwoods A.pdf10 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Greenwood A.pdf10 Jul 2017
Proforma of Allotment letterFile: Agree and Allot A wing.pdf10 Jul 2017
Certificates of Architect (Form 4)File: Architect certificate Form I Greenwoods A wing.pdf10 Jul 2017
PAN CardFile: Pan Card Hubtown.pdf6 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate greenwood-A.pdf6 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hubtown Sunmist B wingAndhieri East61CompletedDec 2012Late, Sep 2014

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 2 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hubtown Greenwoods A wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Vartak Nagar7,600+ in Thane

2 kmHubtown Greenwoods A winCompleted 49Lapsed / revoked 20Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 187 registered projects within 2 km.

Builder: Hubtown Limited

Hubtown Limited has 20 registrations on MahaRERA, including Hubtown Greenwoods A wing and Hubtown Greenwoods D Wing. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Hubtown Greenwoods A wing is delayed beyond 30 Sep 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hubtown Greenwoods A wing?

The registered promoter entity is Hubtown Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hubtown Greenwoods A wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hubtown Greenwoods A wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hubtown Greenwoods A wing?

The professionals named in the filing: Architect: Ms Spaceage Consultants Mr Shashi Jadhav; Engineer: Rajeevan Paramban; Chartered Accountant: MH Dalal & Association; Chartered Accountant: Parashar Darji. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hubtown Greenwoods A wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hubtown Greenwoods A wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hubtown Greenwoods A wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.