Home / Browse projects / Aurangabad, Maharashtra / Hrim Ssky City Phase IV

Registered No litigation declared Others project

Hrim Ssky City Phase IV

By Ashok Baheti

RG-MH-07900 · RERA P51500016766 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 56 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 56 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
54 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Hrim Ssky City Phase IV is a Others project by Ashok Baheti in Aurangabad, Maharashtra, registered with MahaRERA as P51500016766 on 12 Jun 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 56 months from the original filing. 51 of the 105 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameHrim Ssky City Phase IV
  • TypeOthers
  • Location
    • BEED BY PASS
    • SATARA PARISAR
    • Satara (CT)
    • Aurangabad
    • 431007
  • Pincode431007
  • RERA no.P51500016766
  • ReraGenie IDRG-MH-07900

Builder

  • NameAshok Baheti
  • Entity typeIndividual
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2018First promiseApr 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Jun 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 28 Apr 2023)
  • Buildings1 building record
  • Documents filed80 files

Current status

49%51 of 105 units booked
100.0%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING D1 AND D2NA12127629105

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

WING D1 AND D2: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Gopikishan Onkardas Chechani (HUF)Jalna (M Cl)Jalna
Vinodkumar Gopikishan Chechani HUFAurangabad (M Corp.)Aurangabad
Vyankatesh Rajendrakumar Chechani HUFJalna (M Cl)Jalna
Dilipkumar Gopikishan Chechani HUFJalna (M Cl)Jalna
Govind Rajkumar Chechani HUFJalna (M Cl)Jalna
Yogesh Rajkumar ChechaniJalna (M Cl)Jalna

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation
Permissible FSI8470.48
Proposed, not sanctioned6,990 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR PROZON MALL, MIDC CHIKALTHANA, AURANGABAD
Estimated costRs 14.51 cr
Cost incurredRs 14.51 cr
Work done100.0%
BuildingWingEstimatedIncurred
WING D1 AND D2NARs 14.10 crRs 14.10 cr
-NARs 41.00 lakhRs 41.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManggal
EngineerAM Jadhav
Chartered AccountantDM Samdani & Co
PartnerRole in project
Ashok Baheti-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500016542Apr 2023 → Apr 2024

Reason as filed by the promoterDue to technical reason we are getting late completion certificate so we required extension for 12 months please grant the extension

EXT51500025274Apr 2023 → Dec 2027

Reason as filed by the promoter3. As per the UDCPR and Town Planning Rules, Without MHADA Building Completion the project didn’t get the completion certificate. The MHADA started advertising of our project in the year 2024. (Advt. Attached). Accordingly, we are completing the MHADA Building , it will take another 18 Months please grant the extension till 31/12/2027

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: From 1.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 Sky City Phase IV Sep-25.pdf27 Apr 2026
Withdrawal Update Form 1File: Architec certificate Sep-25.pdf18 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep-25.pdf18 Feb 2026
Withdrawal Update Form 3File: Form 3 Sky City Phase IV Sep-25.pdf18 Feb 2026
Withdrawal Update Form 1File: Architec certificate Sep-25.pdf25 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep-25.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3 Sky City Phase IV Sep-25.pdf25 Nov 2025
Withdrawal Update Form 1File: Form 1 D1-D2 Phase IV.pdf15 Nov 2025
Withdrawal Update Form 1File: Architec certificate Sep-25.pdf15 Nov 2025
Withdrawal Update Form 2File: FOrm 2 D1-D2 Phase IV.pdf15 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep-25.pdf15 Nov 2025
Withdrawal Update Form 3File: Form 3 Sky City Phase IV Sep-25.pdf15 Nov 2025
Withdrawal Update Form 3File: Form 3 Sky City Phase IV Sep-25.pdf15 Nov 2025
Form 1File: Architect Certificate March-25.pdf24 Jul 2025
Form 2File: Engineer Certificate March-25.pdf24 Jul 2025
Form 3File: Form 3 Hrim Ssky City Phase IV March-25.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory March-25.pdf24 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 Annual Report 23-24 P-IV.pdf24 Jul 2025
Form 1File: Architect Certificate Dec-24.pdf17 Jul 2025
Form 3File: Annexure D Form 3 CA PHASE IV.pdf17 Jul 2025
Form 2File: Form 2 - Engineer's Certificate Dec 2024.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Booking Dec-24.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sky City.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sky City.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec-24.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hrim Ssky City P- IV Form-2 Dec 24.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: Hrim Ssky City Sold Dec 24.pdf26 Feb 2025
Declaration in FORM BFile: Form B phase IV Affidavit.pdf17 Feb 2025
Certificates of CA (Form 3)File: Form 3 Sky city Phase IV_compressed.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosor of Sold Inventory.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form-1 Mar 23.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form-1 Jun 23.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form-1 Sep 23.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form-1 Dec 23.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form-1 Mar 24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form-1 Jun 24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form-1 Sep 24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form-2 Jun 23.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form-2 Sep 24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form-2 Jun 24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form-2 Mar 24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form-2 Dec 23.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form-2 Sep 23.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form-2 Mar 23.pdf3 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Form-2A 22-23.pdf3 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Form-2A 23-24.pdf3 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report 23-24 P-IV.pdf20 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 P-4.pdf2 May 2024
Declaration in FORM BFile: Form B.pdf8 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20Quality Assurance Certificate 2019-20.pdf8 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20-21Quality Assurance Certificate 2020-21.pdf8 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22Quality Assurance Certificate 2021-22.pdf8 May 2023
Declaration about Commencement CertificateFile: Format D.pdf7 May 2023
Disclosure of sold/ booked inventoryFile: Booking Details.pdf7 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: D1-D2_compressed.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 D1-D2 Phase IV.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOrm 2 D1-D2 Phase IV.pdf20 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: D1-D2 AND D3-D4 COMPRESSED.pdf17 Apr 2023
Status of ConveyanceFile: D1-D2 AND D3-D4 COMPRESSED.pdf17 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: P4-18-19.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: P4-19-20.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: P4-20-21.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: P4-21-22.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P IV ARCH.pdf16 Aug 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PIV ENGINEER_compressed.pdf16 Aug 2019
Certificates of CA (Form 3)File: Phase IV Form 3 CA_compressed.pdf16 Aug 2019
Certificates of CA (Form 3)File: New Doc 2018-06-02.pdf2 Jun 2018
Declaration in FORM BFile: form b.pdf22 May 2018
Commencement Certificates / NA Order for plotted developmentFile: CC FULL PROJECT.pdf18 May 2018
Proforma of Allotment letterFile: NO ATS.pdf18 May 2018
Building plan approvalFile: Full Layout compressed.pdf4 May 2018
Layout approvalFile: D1 n D2 Building -compressed.pdf4 May 2018
Layout approvalFile: D1 n D2 compressed.pdf4 May 2018
Copy of the legal title reportFile: legal search-compressed.pdf4 May 2018
Details of encumbrancesFile: No Enc.pdf4 May 2018
Copy of Layout Approval (in case of layout)File: D1 n D2 Building -compressed.pdf4 May 2018
Copy of Layout Approval (in case of layout)File: D1 n D2 compressed.pdf4 May 2018
Building Plan Approval (IOD)File: Full Layout compressed.pdf4 May 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationRegisteredStatusPromisedDelivered
Hrim Ssky City Phase IP51500003143BEED BY PASS, AurangabadAug 2017OngoingOct 2022Not delivered

How this compares with Aurangabad

49%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 56 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Hrim Ssky City Phase IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATARA PARISAR1,400+ in Aurangabad

Builder: Ashok Baheti

Ashok Baheti has 6 registrations on MahaRERA, including Hrim Ssky City Phase I and Hrim Ssky City Phase II. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Hrim Ssky City Phase IV is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hrim Ssky City Phase IV?

The registered promoter entity is Ashok Baheti, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hrim Ssky City Phase IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hrim Ssky City Phase IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hrim Ssky City Phase IV?

The professionals named in the filing: Architect: Manggal; Engineer: AM Jadhav; Chartered Accountant: DM Samdani & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hrim Ssky City Phase IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hrim Ssky City Phase IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hrim Ssky City Phase IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.