Home / Browse projects / Mumbai Suburban, Maharashtra / House of Shreeji Sharan

Registered No litigation declared Others project

House of Shreeji Sharan

By Miles Infra LLP

RG-MH-06842 · RERA P51800054896 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
32 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

House of Shreeji Sharan is a Others project by Miles Infra LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054896 on 15 Feb 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 7 of the 39 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameHouse of Shreeji Sharan
  • TypeOthers
  • Location
    • SHIMPOLI ROAD
    • BORIVALI WEST
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054896
  • ReraGenie IDRG-MH-06842

Builder

  • NameMiles Infra LLP
  • Entity typePartnership
  • PartnersMEHUL PRAMOD SANGHAVI, VARUN MEHUL SANGHAVI

Key dates

1 months past promisethis monthRegisteredFeb 2024PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed82 files

Current status

18%7 of 39 units booked
100.0%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A RANK TERRACE CO-OPERATIVE HOUSING SOCIETYNA181017623
WING B RANK TERRACE CO-OPERATIVE HOUSING SOCIETYNA13701616

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

WING A RANK TERRACE CO-OPERATIVE HOUSING SOCIETY100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B RANK TERRACE CO-OPERATIVE HOUSING SOCIETY100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered78
BuildingClosed/CoveredTotal
WING A RANK TERRACE CO-OPERATIVE HOUSING SOCIETY3939
WING B RANK TERRACE CO-OPERATIVE HOUSING SOCIETY3939

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,057 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on26 Sep 2025
LandownerVillageDistrict
RANK TERRACE CO-OPERATIVE HOUSING SOCIETYBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3397.61
Proposed, not sanctioned2,793 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHARAT ASBURY PARK KANDIVALI WEST MUMBAI 400067
Estimated costRs 27.13 cr
Cost incurredRs 27.13 cr
Work done100.0%
BuildingWingEstimatedIncurred
WING A RANK TERRACE CO-OPERATIVE HOUSING SOCIETYNARs 11.94 crRs 11.94 cr
WING B RANK TERRACE CO-OPERATIVE HOUSING SOCIETYNARs 11.94 crRs 11.94 cr
-NARs 3.26 crRs 3.26 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay B Shah
EngineerHitesh R Ladva
EngineerIrfan Khan
Chartered AccountantR V B & Associates
Chartered AccountantA K O R D & CO.
PartnerRole in project
Miles Infra LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_Q4_FY 25-26.pdf16 Jun 2026
Withdrawal Update Form 2File: FORM 2_Q4_FY 25-26.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3 _ House of Shreeji Sharan Q4 FY 25-26 Signed.pdf16 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf8 May 2026
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf8 May 2026
Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf8 May 2026
Withdrawal Update Form 1File: FORM 1 _Q3_FY 25-26.pdf2 Mar 2026
Withdrawal Update Form 2File: FORM 2 _Q3_FY 25-26.pdf2 Mar 2026
Withdrawal Update Form 3File: FORM 3 _Q3_FY 25-26.pdf2 Mar 2026
Withdrawal Update Form 1File: FORM 1_Q2_MILES.pdf18 Dec 2025
Withdrawal Update Form 2File: FORM 2 RANK.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 Q2 Miles.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Miles Inventory Dec 2024.pdf11 Nov 2025
Form 1File: LS CERTIFICATE DEC 2024.pdf11 Nov 2025
Form 3File: Form 3 Q3 FY 24-25 Miles.pdf11 Nov 2025
Form 2File: ENGINEERING CERT Q3 RANK.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: Miles Inventory Sept 2024.pdf11 Nov 2025
Form 1File: RT Q2 FORM 1 (1).pdf11 Nov 2025
Form 2File: ENGINEERING CERT sept 2024 RANK.pdf11 Nov 2025
Form 3File: Miles Infra_Form3_Q2_FY24-25.pdf11 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5_Miles Infra LLP- FY 24-25.pdf8 Nov 2025
Withdrawal Update Form 1File: Form 1 Miles June 2025.pdf4 Oct 2025
Withdrawal Update Form 1File: Form 1 Miles June 2025.pdf4 Oct 2025
Withdrawal Update Form 2File: FORM 2_Miles_Q1.pdf4 Oct 2025
Withdrawal Update Form 2File: FORM 2_Miles_Q1.pdf4 Oct 2025
Withdrawal Update Form 3File: Form 3 - Q1 - FY 25-26 - House of shreeji Sharan (1).pdf4 Oct 2025
Withdrawal Update Form 3File: Form 3 - Q1 - FY 25-26 - House of shreeji Sharan (1).pdf4 Oct 2025
Building plan approvalFile: Approved plan layout RT latest (1).pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: RT Sales Discloser March 2025 (1).pdf4 Jul 2025
Form 3File: FORM 3 Q4 FY 24-25 HOUSE OF SHREEJI SHARAN 1.pdf4 Jul 2025
Form 1File: scan20250623141144.pdf4 Jul 2025
Form 2File: scan20250623141032.pdf4 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RT FORM 1 Dec 2024.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RT form 1 march 2025.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rank Terrace Sept 24_compressed.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rank Terrace Dec 24_compressed.pdf8 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Rank Terrace_compressed.pdf31 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ HOUSE OF SHREEJI SHARAN.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: RT Sales Disclosure 31-12-2024.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Miles Infra_Form3_Q2_FY24-25_compressed.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN_20241226_115454061 (1).pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN_20241226_120654671.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN_20241226_115553101.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERT MARCH 2024 UPDATED.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERT JUNE 2024.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: house of shreeji sharan 30-09-24_0001.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-1 House of Shreeji Sharan -Form 3 SIGNED JUNE 24.pdf21 Nov 2024
Details of encumbrances concerned to FinanceFile: Miles encumbrances.pdf29 Oct 2024
CERSAI detailsFile: miles assets based.pdf29 Oct 2024
CERSAI detailsFile: miles debtor based.pdf29 Oct 2024
Details of encumbrances concerned to LegalFile: Miles encumbrances.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MILLP-RT Form 3 for 2023-24 Q4 dt 2024-06-05 sd.pdf11 Oct 2024
Details of encumbrances concerned to FinanceFile: Non-Encumbrance concerned to finance.pdf28 Jul 2024
Details of encumbrances concerned to LegalFile: Non-Encumbrance concerned to finance.pdf28 Jul 2024
CERSAI detailsFile: Asset Based Declaration.pdf28 Jul 2024
CERSAI detailsFile: Debtor Based Declaration.pdf28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rank Terrace Ca Certificate final.pdf5 Feb 2024
Building plan approvalFile: IOD 2024 RT compressed.pdf16 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD 2024 RT compressed.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Rank Terrace new.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: Scan20231018150636.pdf18 Oct 2023
Details of encumbrances concerned to LegalFile: Scan20231018150636.pdf18 Oct 2023
Proforma of Agreement for saleFile: AFS new rank terrace (1 to 18).pdf18 Oct 2023
Proforma of Agreement for saleFile: AFS new rank terrace_compressed (19 to 36).pdf18 Oct 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER_compressed.pdf10 Oct 2023
Layout approvalFile: 2379777Amendletter_signed.pdf9 Oct 2023
PAN CardFile: Miles Infra PAN card.pdf9 Oct 2023
Copy of the legal title reportFile: Scan20231017123033_compressed.pdf9 Oct 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf9 Oct 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf9 Oct 2023
Copy of Layout Approval (in case of layout)File: 2379777Amendletter_signed.pdf9 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 2392777_FirstCC_signed (1).pdf9 Oct 2023
Declaration about Commencement CertificateFile: CC declaration new.pdf9 Oct 2023
Declaration in FORM BFile: Form B MILES INFRA.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT RERA RANK.pdf9 Oct 2023
CERSAI detailsFile: CERSAI DECLARATION.pdf9 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MPS ANNEXURE A.pdf9 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: VS ANEXXURE A.pdf9 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS DECLARATION.pdf9 Oct 2023

How this compares with Mumbai Suburban

18%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep House of Shreeji Sharan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI WEST6,700+ in Mumbai Suburban

2 kmHouse of Shreeji SharanCompleted 161Lapsed / revoked 88Other 218Dot size: filed unitsN

Filed coordinates, straight-line distance. 467 registered projects within 2 km.

Builder: Miles Infra LLP

Miles Infra LLP has 1 registration on MahaRERA, including House of Shreeji Sharan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if House of Shreeji Sharan is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of House of Shreeji Sharan?

The registered promoter entity is Miles Infra LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in House of Shreeji Sharan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for House of Shreeji Sharan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at House of Shreeji Sharan?

The professionals named in the filing: Architect: Sanjay B Shah; Engineer: Hitesh R Ladva; Engineer: Irfan Khan; Chartered Accountant: R V B & Associates; Chartered Accountant: A K O R D & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in House of Shreeji Sharan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About House of Shreeji Sharan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save House of Shreeji Sharan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.