Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Feb 2023Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 58 documents Report an error

Horizon Greens and Planet is a Mixed Development project by Horizon Properties in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/333/PR/200304/003322 on 4 Mar 2020. Possession is promised by 13 Feb 2023. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameHorizon Greens and Planet
  • TypeMixed Development
  • Location
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/333/PR/200304/003322
  • ReraGenie IDRG-KA-62153

Builder

  • NameHorizon Properties
  • Entity typePartnership Firm
  • Authorized SignatoryAbdul Vaheed Kudroli
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2020First promiseMay 2022Revised toFeb 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Mar 2020
  • Promised completion13 Feb 2023
  • Revised completionRevised to 13 Feb 2023 (originally 13 May 2022)
  • Buildings3 building records
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A - ENCLAVE-----13
BLOCK B - GREENS---16016
BLOCK C- PLANET---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 25 Feb 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 25 Feb 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,983 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSS Engineers & Consultants
EngineerMr. Vimal Anil

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMay 2022 → Feb 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed58

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/333/PR/200304/003322 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PlanFile: Kuttar Plan.pdf25 Feb 2020
NOCFile: Fire NOC.pdf25 Feb 2020
PARTNERSHIP DEEDFile: Partnership deed.pdf25 Feb 2020
Project Head DetailsFile: Project Head Details.docx25 Feb 2020
Previous Project detailsFile: Previous project details.docx25 Feb 2020
Profit and Loss 2016-17File: IT Return - 2016-17.pdf25 Feb 2020
Profit and Loss 2017-18File: IT Return - 2018-19.pdf25 Feb 2020
Profit and Loss 2018-19File: IT Return 2017-18.pdf25 Feb 2020
Plan license letterFile: Commencement Certificate.pdf25 Feb 2020
CertificateFile: Firm Certificate.pdf-
Commencement Certificate-
Kuttar Plan-
Proforma of Sale Deed-
Sale Deed and RTC-
Project Specifications-
Kuttar EC-
3(1) Affidavit-
Kuttar RTC-
Gift Deed-
Proforma of agreement-
Conversion Order-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Balance Sheet 2018 - 2019File: Balance Sheet 2018.pdf-
Balance Sheet 2017 - 2018File: Balance Sheet 2017.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet 2016.pdf-
Audited Profit and Loss Statement 2018 - 2019File: P&L Statement 2018.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P&L Statement 2017.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P&L Statement 2016.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 2018-19.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 2017-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2016-17.pdf-
Form B-
Prospectus/BrochureFile: ilovepdf_merged (1).pdf-
Advertisement Copy 1File: ilovepdf_merged (1).pdf-
Tower Excel SheetFile: PRM_KA_RERA_1257_333_PR_200304_003322.xlsx-
Occupancy CertificateFile: occupancy certificate-enclave.pdf-
Completion certificate issued by the competent authorityFile: occupancy certificate-planet.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 9 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Horizon Greens and Planet on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: Horizon Properties

Horizon Properties has 2 registrations on RERA Karnataka, including Horizon Greens and Planet and Oriole Horizon. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Horizon Greens and Planet is delayed beyond 13 Feb 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Horizon Greens and Planet?

The registered promoter entity is Horizon Properties, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Horizon Greens and Planet?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Horizon Greens and Planet?

The professionals named in the filing: Architect: SS Engineers & Consultants; Engineer: Mr. Vimal Anil. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Horizon Greens and Planet?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Horizon Greens and Planet. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Horizon Greens and Planet to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.