HIRASNAGAR
RG-MH-24192 · RERA P52100010702 · Last updated on MahaRERA portal: 8 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 72 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HIRASNAGAR is a Residential / Group Housing project by M/S.Ramchandr M Thakur in Pune, Maharashtra, registered with MahaRERA as P52100010702 on 31 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 72 months from the original filing.
At a glance
Project
- NameHIRASNAGAR
- TypeResidential / Group Housing
- Location
- Gat No. 1230
- Pirangut
- Mulshi
- Pune
- 412115
- Pincode412115
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100010702
- ReraGenie IDRG-MH-24192
Builder
- NameM/S.Ramchandr M Thakur
- Entity typePartnership
- PartnersSnehalata Ramchandra Thakur, Ashish Nitin Thakur, Monish Nitin Thakur, Seema Nitin Thakur
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed67 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| E | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 99%.
E: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed38
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ajit Thakur & Associates |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | NB Sayed & Associates |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Partner | Role in project |
|---|---|
| M/S.Ramchandr M Thakur | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to some technical difficulties and due to the market conditions, we wish to extend the completion date by a year i.e. up to 30/12/2020
Reason as filed by the promoterThe delay in the completion of the real estate project has been primarily caused by a combination of procurement issues, site conditions, coordination challenges, and Insufficient funds. By implementing the outlined action plan, we aim to mitigate these delays and move forward efficiently. However, we assure you that our utmost priority is to safeguard the interests of the allottees and ensure the successful completion of the project. We kindly request an extension under section 7(3) until 31-12-2025, allowing us sufficient time to complete all necessary procedures and meet our commitments to
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 of Hirasnagar_For FY 2024-25.pdf | 8 Jun 2026 |
| Form 1File: Form 1 - Hirasnagar as on Sep 2025.pdf | 13 May 2026 |
| Form 2File: Form 2 - Hirasnagar as on Sep 2025.pdf | 13 May 2026 |
| Form 3File: Form 3 - Hirasnagar as on Sep 2025.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Hirasnagar as on Sep 2025.pdf | 13 May 2026 |
| Form 1File: Form 1 - Hirasnagar as on Dec 2025.pdf | 13 May 2026 |
| Form 2File: Form 2 - Hirasnagar as on Dec 2025.pdf | 13 May 2026 |
| Form 3File: Form 3 - Hirasnagar as on Dec 2025.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Hirasnagar as on Dec 2025.pdf | 13 May 2026 |
| Form 1File: Form 1 - Hirasnagar as on June 2025.pdf | 10 Oct 2025 |
| Form 2File: Form 2 - Hirasnagar as on June 2025.pdf | 10 Oct 2025 |
| Form 3File: Form 3 - Hirasnagar as on June 2025.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Hirasnagar as on June 2025.pdf | 10 Oct 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sep 24.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 24.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Mar 25.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 of Hirasnagar as on 30-09-2024.pdf | 17 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 of Hirasnagar as on 31-12-2024.pdf | 17 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 of Hirasnagar as on 31-03-2025.pdf | 17 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Hirasnagar as on Sep 2024.pdf | 17 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Hirasnagar as on Dec 2024.pdf | 17 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Hirasnagar as on March 2025.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 29.pdf | 22 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019-20.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-22.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-24.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 21 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 Jun 24_11zon.pdf | 19 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 24.pdf | 19 Nov 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 19 Nov 2024 |
| Declaration in FORM BFile: Form B.pdf | 14 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 24.pdf | 14 Nov 2024 |
| CERSAI detailsFile: Declaration of CERSAI.pdf | 14 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 14 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 14 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Ramchandra Thakur.pdf | 31 Mar 2018 |
| Building plan approvalFile: Building Plan 1.pdf | 31 Jul 2017 |
| Building plan approvalFile: Building Plan 2.pdf | 31 Jul 2017 |
| Building plan approvalFile: Building Plan 3.pdf | 31 Jul 2017 |
| Building plan approvalFile: Building Plan 4.pdf | 31 Jul 2017 |
| Building plan approvalFile: Building Plan 5.pdf | 31 Jul 2017 |
| Layout approvalFile: Layout.pdf | 31 Jul 2017 |
| Building plan approvalFile: E BLDG RERA AREA 7TH FLOOR PLAN.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Search Title Report-Compressed.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: No Emcumbrance-PDF.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan 1.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan 2.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan 3.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan 4.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan 5.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: E BLDG RERA AREA 7TH FLOOR PLAN.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: form B.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ramchandr m thakur - architect certificate-compressed.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Annexure A signed.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter HIRAS NAGAR RERA.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: HIRAS NAGAR RERA DRAFT AGREEMENT.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HIRASNAGAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pirangut13,700+ in Pune
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
Avian Valley - Solaire
KAKADE ESTATE DEVELOPERS PVT. LTD.
Park Pebbles Phase I
M/s Rainbow Purple Construction LLP
Mahindra Rivenza Phase 2
Mahindra Lifespace Developers limited
Mahindra Rivenza Phase 1
Mahindra Lifespace Developers limited
FOREST TRAILS ATHASHRI B3
LAVIM DEVELOPERS PVT LTD
KOHINOOR WOODSHIRE
INTOFINITY PROMOTERS PRIVATE LIMITED
Builder: M/S.Ramchandr M Thakur
M/S.Ramchandr M Thakur has 1 registration on MahaRERA, including HIRASNAGAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that HIRASNAGAR shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HIRASNAGAR is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HIRASNAGAR?
The registered promoter entity is M/S.Ramchandr M Thakur, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HIRASNAGAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HIRASNAGAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HIRASNAGAR?
The professionals named in the filing: Architect: Ajit Thakur & Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIRASNAGAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback