Home / Browse projects / Kolhapur, Maharashtra / HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H
HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H
RG-MH-31020 · RERA P53000079354 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H is a Residential / Group Housing project by Krishnat Shripatrao Patil in Kolhapur, Maharashtra, registered with MahaRERA as P53000079354 on 28 Feb 2025. Possession is promised by 31 Dec 2028. 9 of the 64 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.
At a glance
Project
- NameHIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H
- TypeResidential / Group Housing
- Location
- A WARD RANKALA
- AMBAI TANK
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416012
- Pincode416012
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000079354
- ReraGenie IDRG-MH-31020
Builder
- NameKrishnat Shripatrao Patil
- Entity typeIndividual
- Other registrations2 more →
- Completed2 of 3
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Feb 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed72 files
Current status
Figures as on 17 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING G | NA | 10 | 8 | 32 | 0 | 32 |
| BUILDING H | NA | 10 | 8 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
BUILDING G47%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING H0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 75% |
| Open Parking | No | Not applicable |
Parking filed64
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING G | 32 | 32 |
| BUILDING H | 32 | 32 |
Land and ownership5
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANJAY SHIVAJI PATIL | Kolhapur (M Corp.) | Kolhapur |
| BABASAHEB SHRIPATRAO PATIL | Kolhapur (M Corp.) | Kolhapur |
| BALASAHEB SHRIPATRAO PATIL | Kolhapur (M Corp.) | Kolhapur |
| VIJAY SHIVAJI PATIL | Kolhapur (M Corp.) | Kolhapur |
| SARJERAO SHRIPATRAO PATIL | Kolhapur (M Corp.) | Kolhapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING G | NA | Rs 14.61 cr | Rs 4.86 cr |
| BUILDING H | NA | Rs 10.69 cr | - |
| - | NA | Rs 50.00 lakh | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHLAND THROUGH SAMBHAJI PATIL |
| Architect | Sambhaji Patil |
| Engineer | BHIVA BALASO BUDAKE |
| Engineer | NISHANT HINDURAO POWAR |
| Engineer | Swarup Yadav |
| Chartered Accountant | CA V V TOPKAR AND ASSOCIATES |
| Chartered Accountant | V V Topkar and associates |
| Chartered Accountant | Smeet Shah and Associates |
| Partner | Role in project |
|---|---|
| Krishnat Shripatrao Patil | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jan 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 17 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Quality Asurance Certificate.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 15 Jan 2026 |
| Withdrawal Update Form 1File: Architech certificate.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: G Building Form 5.pdf | 7 Oct 2025 |
| Form 1File: Architect Certificate.pdf | 17 Jul 2025 |
| Form 2File: Engineer Certificate.pdf | 17 Jul 2025 |
| Form 3File: CA Certificate.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold List.pdf | 17 Jul 2025 |
| OthersFile: Form 2A Quality Assurance Certificate.pdf | 17 Jul 2025 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 17 Jul 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 17 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 NEW NEW.pdf | 17 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form - 2A - G and H.pdf | 10 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed (2).pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate.pdf | 14 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Concerned to Finance NEW.pdf | 18 Feb 2025 |
| CERSAI detailsFile: CERSAI DECLARATION NEW.pdf | 18 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrances Concerned to Finance NEW.pdf | 18 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured Finance.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 NEW NEW.pdf | 15 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Self Declaration for Opnening Bank Account landowner.pdf | 8 Feb 2025 |
| Other - FinanceFile: Self Declaration for Opening Bank Account landowner.pdf | 8 Feb 2025 |
| Other - TechnicalFile: Self Declaration Promoter Name shall be name Organisation.pdf | 8 Feb 2025 |
| Other - TechnicalFile: CC Verification.pdf | 8 Feb 2025 |
| Building plan approvalFile: 1.pdf | 30 Jan 2025 |
| Building plan approvalFile: 13.pdf | 30 Jan 2025 |
| Building plan approvalFile: 14.pdf | 30 Jan 2025 |
| Building plan approvalFile: 15.pdf | 30 Jan 2025 |
| Building plan approvalFile: 16.pdf | 30 Jan 2025 |
| Copy of the legal title reportFile: Legal Title and Search Report.pdf | 30 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Legal.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 1.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 16.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 15.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 14.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 13.pdf | 30 Jan 2025 |
| Other - LegalFile: Sale Deed_11zon (6).pdf | 30 Jan 2025 |
| Other - LegalFile: 7-12_compressed (1).pdf | 30 Jan 2025 |
| Other - LegalFile: Landowner Self Declaration for DA Sharing.pdf | 30 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank Account Declaration.pdf | 30 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrances concerned to Legal.pdf | 30 Jan 2025 |
| Other - FinanceFile: Landowner Self Declaration for DA Sharing.pdf | 30 Jan 2025 |
| Other - TechnicalFile: Annexure A - One Plot One Registration.pdf | 30 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement to Sell.pdf | 30 Jan 2025 |
| Proforma of Agreement for saleFile: Agr_for_RERA_FINAL[1].pdf | 30 Jan 2025 |
| Layout approvalFile: Layout Plan.PDF | 25 Jan 2025 |
| PAN CardFile: Pan Card.pdf | 25 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.PDF | 25 Jan 2025 |
| Proforma of Allotment letterFile: Allottment Letter - New.pdf | 25 Jan 2025 |
| Declaration in FORM BFile: Form B - Promoter.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 25 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 25 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D - Declaration about CC.pdf | 25 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: No Deviation - Allotment Letter.pdf | 25 Jan 2025 |
| Other - TechnicalFile: Annexure A - One Plot One Registration.pdf | 25 Jan 2025 |
| Other - TechnicalFile: Self Declaration Technical.pdf | 25 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 25 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Bank Letter.pdf | 25 Jan 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HIRASHREE LAKE CITY APARTMENT PHASE V Buildi on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBAI TANK880+ in Kolhapur
Filed coordinates, straight-line distance. 52 registered projects within 2 km.
GRUHALAXMI RACHANA
BATU BUILDERS
SRI SRI RESIDENCY
SRI SRI BUILDERS AND DEVELOPERS PROPRIETOR
ONE EARTH
DESHPANDE INFRA
DRONAGIRI
ASHTIN INDIA PVT LTD
JEWEL SQUARE
RATNARAJ BUILDERS AND DEVELOPERS
SAPPHIRE SKY
S.S.Builders and Developers
See every Kolhapur project, with the district possession charts
Builder: Krishnat Shripatrao Patil
Krishnat Shripatrao Patil has 3 registrations on MahaRERA, including HIRASHREE LAKE CITY APARTMENT PHASE III and HIRASHREE LAKE CITY APARTMENT PHASE IV. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H?
The registered promoter entity is Krishnat Shripatrao Patil, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H?
The professionals named in the filing: Architect: ARCHLAND THROUGH SAMBHAJI PATIL; Architect: Sambhaji Patil; Engineer: BHIVA BALASO BUDAKE; Engineer: NISHANT HINDURAO POWAR; Engineer: Swarup Yadav; Chartered Accountant: CA V V TOPKAR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIRASHREE LAKE CITY APARTMENT PHASE V Building G and Building H?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback