HIRASHREE LAKE CITY APARTMENT PHASE IV

By Krishnat Shripatrao Patil

RG-MH-62669 · RERA P53000053944 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
25 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

HIRASHREE LAKE CITY APARTMENT PHASE IV is a Residential / Group Housing project by Krishnat Shripatrao Patil in Kolhapur, Maharashtra, registered with MahaRERA as P53000053944 on 11 Dec 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 23 of the 48 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameHIRASHREE LAKE CITY APARTMENT PHASE IV
  • TypeResidential / Group Housing
  • Location
    • A WARD AMBAI TANK
    • NEAR SHALINI PALACE RANKALA KOLHAPUR
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416012
  • Pincode416012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000053944
  • ReraGenie IDRG-MH-62669

Builder

  • NameKrishnat Shripatrao Patil
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredDec 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed126 files

Current status

48%23 of 48 units booked
69.7%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING FNA10848048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BUILDING F: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes75%
Open ParkingNoNot applicable

Parking filed140

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots140
Closed/Covered140

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,727 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Sep 2024
LandownerVillageDistrict
SARJERAO SHRIPATRAO PATILKolhapur (M Corp.)Kolhapur
BALASAHEB SHRIPATRAO PATILKolhapur (M Corp.)Kolhapur
BABASAHEB SHRIPATRAO PATILKolhapur (M Corp.)Kolhapur
SANJAY SHIVAJI PATILKolhapur (M Corp.)Kolhapur
VIJAY SHIVAJI PATILKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI5360.7
Proposed, not sanctioned5,361 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAYANTARA COMPLEX E WARD NEAR VIVEKANAND COLLEGE TARABAI PARK KOLHAPUR 416003
Estimated costRs 17.62 cr
Cost incurredRs 12.28 cr
Work done69.68%
BuildingWingEstimatedIncurred
BUILDING FNARs 17.12 crRs 12.28 cr
-NARs 50.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHLAND THROUGH SAMBHAJI PATIL
EngineerNISHANT HINDURAO POWAR
EngineerSwarup Yadav
EngineerPrathamesh Sunil Bhosale
Chartered AccountantCA V V TOPKAR AND ASSOCIATES
Chartered AccountantSmeet Shah and Associates
PartnerRole in project
Krishnat Shripatrao Patil-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf17 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf17 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf17 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A Quality Assurance Certificate.pdf17 Apr 2026
Occupational CertificateFile: Complecation Certificate.pdf17 Apr 2026
Withdrawal Update Form 1File: Architect Certificate.pdf15 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf15 Jan 2026
Withdrawal Update Form 3File: CA Certificate.pdf15 Jan 2026
Withdrawal Update Form 1File: Architech Certificate.pdf14 Oct 2025
Withdrawal Update Form 2File: Engineer certificate.pdf14 Oct 2025
Withdrawal Update Form 3File: CA certificate.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: F Building Form 5.pdf7 Oct 2025
Withdrawal Update Form 1File: Architech Certificate.pdf17 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf17 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf17 Jul 2025
Form 2A (FY 2024-2025)File: Form - 2A F Building.pdf10 Jun 2025
Form 1File: Architect Certificate.pdf4 Jun 2025
Form 2File: Engineer Certificate.pdf4 Jun 2025
Form 3File: CA Certificate.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed (1).pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: F Building - Quality Assurance Certificate.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold List .pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold List .pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold List .pdf16 Jan 2025
Details of encumbrances concerned to FinanceFile: Finance Declaration Hirashree.pdf25 Oct 2024
Details of encumbrances concerned to LegalFile: Finance Declaration Hirashree.pdf25 Oct 2024
Details of encumbrances concerned to FinanceFile: Finance Declaration Hirashree.pdf25 Oct 2024
Details of encumbrances concerned to LegalFile: Finance Declaration Hirashree.pdf25 Oct 2024
Details of encumbrances concerned to FinanceFile: Finance Declaration Hirashree.pdf25 Oct 2024
Details of encumbrances concerned to LegalFile: Finance Declaration Hirashree.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: F Building Hirashri Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: F Building Hirashri Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: F Building Hirashri Form 5.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Form 5 F Building.pdf27 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (16).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Jan 2024
Building plan approvalFile: Declaration anout area.pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Declaration anout area.pdf4 Dec 2023
Building plan approvalFile: Sanctioned Plan 1.pdf30 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 1.pdf30 Nov 2023
Building plan approvalFile: Total Project Plan.pdf22 Nov 2023
Building plan approvalFile: Sanctioned Plan 2.pdf22 Nov 2023
Building plan approvalFile: Sanctioned Plan 3.pdf22 Nov 2023

How this compares with Kolhapur

48%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep HIRASHREE LAKE CITY APARTMENT PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SHALINI PALACE RANKALA KOLHAPUR880+ in Kolhapur

2 kmHIRASHREE LAKE CITY APARCompleted 26Lapsed / revoked 9Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: Krishnat Shripatrao Patil

Krishnat Shripatrao Patil has 3 registrations on MahaRERA, including HIRASHREE LAKE CITY APARTMENT PHASE III and HIRASHREE LAKE CITY APARTMENT PHASE IV. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if HIRASHREE LAKE CITY APARTMENT PHASE IV is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HIRASHREE LAKE CITY APARTMENT PHASE IV?

The registered promoter entity is Krishnat Shripatrao Patil, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HIRASHREE LAKE CITY APARTMENT PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HIRASHREE LAKE CITY APARTMENT PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HIRASHREE LAKE CITY APARTMENT PHASE IV?

The professionals named in the filing: Architect: ARCHLAND THROUGH SAMBHAJI PATIL; Engineer: NISHANT HINDURAO POWAR; Engineer: Swarup Yadav; Engineer: Prathamesh Sunil Bhosale; Chartered Accountant: CA V V TOPKAR AND ASSOCIATES; Chartered Accountant: Smeet Shah and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HIRASHREE LAKE CITY APARTMENT PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HIRASHREE LAKE CITY APARTMENT PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HIRASHREE LAKE CITY APARTMENT PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.