Home / Browse projects / Mumbai Suburban, Maharashtra / HILTON ENCLAVE WING A, B, B-1

Completed No litigation declared Residential / Group Housing project

HILTON ENCLAVE WING A, B, B-1

By BHAVANI DEVELOPERS PVT LTD

RG-MH-58751 · RERA P51800012042 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
19 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 80%
4Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

HILTON ENCLAVE WING A, B, B-1 is a Residential / Group Housing project by BHAVANI DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012042 on 1 Sep 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 24 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameHILTON ENCLAVE WING A, B, B-1
  • TypeResidential / Group Housing
  • Location
    • JIVDAYA LANE
    • GHATKOPAR WEST
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012042
  • ReraGenie IDRG-MH-58751

Builder

  • NameBHAVANI DEVELOPERS PVT LTD
  • Entity typeCompany
  • Managing DirectorHASMUKHRAI MADHULAL BARVALIA

Key dates

this monthRegisteredSep 2017First promiseJun 2021Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA120000
WING B B1NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 80%.

WING A89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
WING B B191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered1
Open Space2
BuildingClosed/CoveredOpen SpaceTotal
WING A022
WING B B1101

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,478 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2775.72
Proposed, not sanctioned1,383 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 13/13A, ZEST BUSINESS SPACES, M G ROAD, GHATKOPAR EAST MUMBAI 77

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAYUREE CONSULTANTS
PartnerRole in project
BHAVANI DEVELOPERS PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013506Jun 2021 → Jun 2023

Reason as filed by the promoterPresently, substantial work of the project has been completed and an application for certificate of completion has been made to the concerned local authority. Copy of said application is submitted herewith. However, the procedural time period for issuance of completion certificate by the said local authority as per our estimation would be six months. Hence, we request your honour to grant extension till 30-06-2023 to safeguard the interest of the allottees.

EXT51800009292Jun 2021 → Jun 2022

Reason as filed by the promoter3. However, in view of current lockdown restrictions and difficulty in procuring materials and labour unavailability on account of outbreak of a pandemic COVID-19 and also due to slowdown in the market due to ongoing Covid 19 pandemic, the said project will need time till 30th June, 2022 for its completion. It may be noted that the revised extended registration certificate of the project till 30th June 2022 is required for the purpose of business.

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000196111Dharmista B ShahBhavani Developers Pvt Ltd.20/02/2021
CC006000000198600SURESH PANDYABHAVANI DEVELOPERS PVT LTD08/10/2021
CC006000000198601MANJULA KANTILAL RAWALBHAVANI DEVELOPERS PVT. LTD.08/10/2021
CC006000000439693Ashwin Ratanshi ShahBhavani Developers Pvt. Ltd17/03/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Oct 2023

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCTY REG LETTER.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BHAVANI_ARCHITECT_CERTIFICATE_TILL_31032022.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHAVANI_ENGINEER_CERTIFICATE_TILL_31032022.pdf29 Jan 2024
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf29 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC BHAVANI 2353347_OC_signed.pdf11 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECT'S CERTFICATE_form 4.pdf11 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT'S CERTFICATE_form 4.pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hilton_Enclave_RERA_Form_1_Architect_Certificate_till_31_12_2022.pdf20 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hilton_Enclave_RERA_Form_2_Engineer_Certificate_till_31_12_2022.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LIST BHAVANI DEVELOPERS.pdf19 Jan 2023
Declaration about Commencement CertificateFile: CC SELF DECLARATION20230112_13184325.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE CERTIFICATE 25-05-20.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE 15-05-21.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE 18-05-22.pdf18 Jan 2023
Certificates of CA (Form 3)File: Hilton_Enclave_RERA_Form_3_CA_Certificate_till_31_12_2022.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-compressed.pdf6 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE-compressed.pdf6 May 2019
Certificates of CA (Form 3)File: FORM 3_compressed.pdf6 May 2019
Certificates of CA (Form 5)File: FORM 5.pdf23 Apr 2019
Certificates of CA (Form 5)File: FORM 5_.pdf23 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: CC COPY BHAVANI DEV.pdf5 Apr 2019
Certificates of CA (Form 3)File: CA CERTIFICATE 30 NOV 17.pdf24 Jan 2018
Certificates of CA (Form 3)File: CA CERTIFICATE 30 NOV 17.pdf24 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf22 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf22 Jan 2018
Layout approvalFile: LAYOUT PLAN.pdf31 Jul 2017
Building plan approvalFile: IOD BHAVANI DEV.pdf31 Jul 2017
Copy of the legal title reportFile: TITLE REPORT BHAVANI DEV COMP.pdf31 Jul 2017
Details of encumbrancesFile: encumbrances declaration bhavani.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD BHAVANI DEV.pdf31 Jul 2017
Declaration in FORM BFile: form B.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architects certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE FOR RERA.pdf31 Jul 2017
Proforma of Allotment letterFile: Bhvani Developers Agreement Draft pdf.pdf31 Jul 2017
Proforma of Allotment letterFile: BHAVANI_DEVELOPERS_ALLOTMENT_LETTER_ PDF.PDF31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HILTON ENCLAVE WING A, B, B-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR WEST6,700+ in Mumbai Suburban

2 kmHILTON ENCLAVE WING A, BCompleted 114Lapsed / revoked 66Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 292 registered projects within 2 km.

Builder: BHAVANI DEVELOPERS PVT LTD

BHAVANI DEVELOPERS PVT LTD has 1 registration on MahaRERA, including HILTON ENCLAVE WING A, B, B-1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if HILTON ENCLAVE WING A, B, B-1 is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HILTON ENCLAVE WING A, B, B-1?

The registered promoter entity is BHAVANI DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HILTON ENCLAVE WING A, B, B-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HILTON ENCLAVE WING A, B, B-1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HILTON ENCLAVE WING A, B, B-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HILTON ENCLAVE WING A, B, B-1?

The professionals named in the filing: Architect: MAYUREE CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HILTON ENCLAVE WING A, B, B-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HILTON ENCLAVE WING A, B, B-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HILTON ENCLAVE WING A, B, B-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.