ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / HILL CREST

Registered No litigation declared Residential / Group Housing project

HILL CREST

By SH BUILDCON

RG-MH-31410 · RERA P52000079745 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 68%
126 of 126Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

HILL CREST is a Residential / Group Housing project by SH BUILDCON in Raigarh, Maharashtra, registered with MahaRERA as P52000079745 on 24 Mar 2025. Possession is promised by 31 Dec 2029. 0 of the 126 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameHILL CREST
  • TypeResidential / Group Housing
  • Location
    • PLOT NO. 75(35)
    • SECTOR 9
    • ULWE
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000079745
  • ReraGenie IDRG-MH-31410

Builder

  • NameSH BUILDCON
  • Entity typePartnership
  • PartnersLadhavji Vashram Patel, Kamlesh Vasharambhai Bhanushali, Madireddy Konda Reddy, Anand Soni

Key dates

this monthRegisteredMar 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Mar 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

0%0 of 126 units booked
9.3%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HILL CRESTNA141411511126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 68%.

HILL CREST: 6% average across the applicable activities

ActivityProgress
Excavation68%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed137

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots137
Closed/Covered120
Open Space17

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,398 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 May 2025

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI11131.49
Proposed, not sanctioned11,131 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHAWARE CENTURION MALL,PLOT NO 88-91, SECTOR – 19A,NERUL EAST, NAVI MUMBAI,DIST. THANE, MAHARASHTRA , PIN 400706.
Estimated costRs 40.00 cr
Cost incurredRs 3.71 cr
Work done9.28%
BuildingWingEstimatedIncurred
HILL CRESTNARs 36.80 crRs 3.71 cr
-NARs 3.20 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajesh RC Architect
EngineerS R Consultants
EngineerBuilt to Last Services
Chartered AccountantJiten Bhanushali & Associates
Chartered AccountantJiten
Chartered AccountantVishal
PartnerRole in project
SH BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: SH Q3 SIGN FORM 1.pdf13 May 2026
Withdrawal Update Form 2File: FORM 2.pdf13 May 2026
Withdrawal Update Form 3File: SH Q3 Form 3.pdf13 May 2026
Withdrawal Update Form 1File: SH Q3 SIGN FORM 1.pdf13 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf13 Mar 2026
Withdrawal Update Form 3File: SH Q3 Form 3.pdf13 Mar 2026
Withdrawal Update Form 1File: 1 FORM 1 Q1 FY 25-26.pdf3 Dec 2025
Withdrawal Update Form 2File: 2 FORM 2 Q1 FY 25-26.pdf3 Dec 2025
Withdrawal Update Form 3File: 3 FORM 3 Q1 FY 25-26.pdf3 Dec 2025
Withdrawal Update Form 1File: 1 FORM 1 Q1 FY 25-26.pdf26 Jul 2025
Withdrawal Update Form 2File: 2 FORM 2 Q1 FY 25-26.pdf26 Jul 2025
Withdrawal Update Form 3File: 3 FORM 3 Q1 FY 25-26.pdf26 Jul 2025
Form 1File: FORM 1 - Q4.pdf27 May 2025
Form 2File: FORM 2 - Q4.pdf27 May 2025
Form 3File: Form 3 Q4 FY 24-25.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SALES.pdf27 May 2025
Form 2A (FY 2024-2025)File: FORM 2A Q4.pdf27 May 2025
Form 5 (FY 2024-2025)File: FORM 5 Q4 FY 24-25.pdf27 May 2025
Layout approvalFile: 5 Copy of Layout_Part1.pdf20 Mar 2025
Layout approvalFile: 6 Building Plan 2,3,4,5,6,7,9,10,12,13.pdf20 Mar 2025
Layout approvalFile: 6 Building Plan 1st Floor.pdf20 Mar 2025
Layout approvalFile: 6 Building Plan 8 11.pdf20 Mar 2025
Layout approvalFile: 6 Building Plan Elevation.pdf20 Mar 2025
Building plan approvalFile: 6 Buildin Plan Ground Floor.pdf20 Mar 2025
Building plan approvalFile: 6 Building Plan 1st Floor.pdf20 Mar 2025
Building plan approvalFile: 6 Building Plan 2,3,4,5,6,7,9,10,12,13.pdf20 Mar 2025
Building plan approvalFile: 6 Building Plan 8 11.pdf20 Mar 2025
Building plan approvalFile: 6 Building Plan Elevation.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: 5 Copy of Layout_Part1.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: 6 Building Plan 2,3,4,5,6,7,9,10,12,13.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: 6 Building Plan 1st Floor.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: 6 Building Plan 8 11.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: 6 Building Plan Elevation.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3 New-final.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Buildin Plan Ground Floor.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 1st Floor.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 2,3,4,5,6,7,9,10,12,13.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 8 11.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Elevation.pdf20 Mar 2025
Other - LegalFile: SH BUILDCON TP 101-148_11zon.pdf20 Mar 2025
Other - LegalFile: SH BUILDCON TP 1 -50_11zon.pdf20 Mar 2025
Other - LegalFile: SH BUILDCON TP 51 -100_11zon.pdf20 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 19 Declaration of rera bank account.pdf20 Mar 2025
Deviation Report with respect to Allotment letterFile: 18 Deviation Report - Allotment Letter.pdf20 Mar 2025
Deviation Report with respect to model copy of AgreementFile: 16 Deviation Report - Agreement.pdf20 Mar 2025
PAN CardFile: 1 PAN Card.pdf11 Mar 2025
Copy of the legal title reportFile: 2 Title Search.pdf11 Mar 2025
Details of encumbrances concerned to FinanceFile: 3 details of encumbrance related to finance.pdf11 Mar 2025
Details of encumbrances concerned to FinanceFile: 4 details of encumbrance related to legal.pdf11 Mar 2025
Proforma of Allotment letterFile: 17 Proforma Allotment Letter.pdf11 Mar 2025
Declaration in FORM BFile: 8 FORM B DECLARATION.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 FORM 1.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 FORM 2.pdf11 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate.pdf11 Mar 2025
Other - LegalFile: 22 Declaration cum Undertaking under Order 50.pdf11 Mar 2025
Declaration about Commencement CertificateFile: 21 Declaration of CC.pdf11 Mar 2025
CERSAI detailsFile: 13 Cersai Declaration.pdf11 Mar 2025
CERSAI detailsFile: 13 CERSAI_Search_Report.pdf11 Mar 2025
Details of encumbrances concerned to LegalFile: 3 details of encumbrance related to finance.pdf11 Mar 2025
Details of encumbrances concerned to LegalFile: 4 details of encumbrance related to legal.pdf11 Mar 2025
Other - FinanceFile: 22 Declaration cum Undertaking under Order 50.pdf11 Mar 2025
Other - TechnicalFile: 22 Declaration cum Undertaking under Order 50.pdf11 Mar 2025
Proforma of Agreement for saleFile: 15 Proforma Agreement.pdf11 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Partner - Anandkumar Soni.pdf11 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Partner - Kamlesh.pdf11 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Partner - Ladhavji Patel.pdf11 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Declaration of Madireddy.pdf11 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 20 Bank account letter.pdf11 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: 11 Disclosure of secured unsecured loan.pdf11 Mar 2025

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HILL CREST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ULWE5,900+ in Raigarh

2 kmHILL CRESTCompleted 125Lapsed / revoked 33Other 102Dot size: filed unitsN

Filed coordinates, straight-line distance. 260 registered projects within 2 km.

Builder: SH BUILDCON

SH BUILDCON has 1 registration on MahaRERA, including HILL CREST. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if HILL CREST is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HILL CREST?

The registered promoter entity is SH BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HILL CREST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HILL CREST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HILL CREST?

The professionals named in the filing: Architect: Rajesh RC Architect; Engineer: S R Consultants; Engineer: Built to Last Services; Chartered Accountant: Jiten Bhanushali & Associates; Chartered Accountant: Jiten; Chartered Accountant: Vishal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HILL CREST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HILL CREST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HILL CREST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.