ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Heramba Residency

Registered No litigation declared Others project

Heramba Residency

By Bishwamitra Rampravesh Sah

RG-MH-06957 · RERA P52000054407 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Heramba Residency is a Others project by Bishwamitra Rampravesh Sah in Raigarh, Maharashtra, registered with MahaRERA as P52000054407 on 19 Jan 2024. Possession is promised by 5 Jun 2027.

At a glance

Project

  • NameHeramba Residency
  • TypeOthers
  • Location
    • Sector -24
    • Pushpak Node -Panvel
    • Wahal
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054407
  • ReraGenie IDRG-MH-06957

Builder

  • NameBishwamitra Rampravesh Sah
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJan 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jan 2024
  • Promised completion5 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Heramba ResidencyNA88000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

Heramba Residency: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered12
Open Space36

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area680 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Akshay Kisan KharkarUlaweRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI2691.54
Proposed, not sanctioned2,690 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch75, Vardhaman Market, Sector 17, Navi Mumbai, Maharashtra 400703

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectamit n. patil architects and planners
EngineerS K Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Bishwamitra Rampravesh Sah-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 5 Jun 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Heramba Residency as on 31-03-2026.pdf12 Jun 2026
Form 2File: Form 2 Heramba Residency as on 31-03-2026.pdf12 Jun 2026
Form 3File: Form 3 Heramba Residency as on 31-03-2026.pdf12 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 Heramba Residency as on 31-03-2026.pdf12 Jun 2026
Form 1File: Form 1 - Heramba Residency as on Sep 2025.pdf2 Mar 2026
Form 2File: Form 2 - Heramba Residency as on Sept 2025.pdf2 Mar 2026
Form 3File: Form 3 - Heramba Residency as on Sept 2025.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Heramba Residency as on Sep 2025.pdf2 Mar 2026
Form 1File: Form 1 - Heramba Residency as on Dec 2025.pdf28 Feb 2026
Form 2File: Form 2 - Heramba Residency as on Dec 2025.pdf28 Feb 2026
Form 3File: Form 3 - Heramba Residency as on Dec 2025.pdf28 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Heramba Residency as on Dec 2025.pdf28 Feb 2026
Form 1File: Form 1 - Heramba Residency as on March 2025.pdf3 Sep 2025
Form 2File: Form 2 - Heramba Residency as on March 2025.pdf3 Sep 2025
Form 3File: Form 3 - Heramba Residency as on March 2025.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Heramba Residency as on March 2025.pdf3 Sep 2025
Form 1File: Form 1 - Heramba Residency as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - Heramba Residency as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - Heramba Residency as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Heramba Residency as on June 2025.pdf20 Jul 2025
Form 1 - Heramba Residency as on March 202529 Apr 2025
Form 1 - Heramba Residency as on December 2024 Previously Uploaded29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mar 2024.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jun 2024.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar 2024.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jun 2024.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 2024.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 2024.pdf25 Mar 2025
Other - LegalFile: MOU.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Dec 2024.pdf25 Mar 2025
Declaration about Commencement CertificateFile: Format D.pdf25 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf25 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf25 Mar 2025
Layout approvalFile: 1.pdf18 Mar 2025
Building plan approvalFile: 2 3 4.pdf18 Mar 2025
Copy of Layout Approval (in case of layout)File: 1.pdf18 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf18 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 3 4.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Heramba Residency as on Dec 2024.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Heramba Residency as on Dec 2024.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Heramba Residency as on Dec 2024.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Heramba Residency FY 2023-24.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Heramba Residency as on Sep 2024.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Heramba Residency as on Sept 2024.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Heramba Residency as on 30th September 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Heramba Residency as on Sept 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_compressed.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Heramba Residency as on June 2024.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Heramba Residency as on June 2024.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Heramba Residency as on March 2024.pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Heramba Residency as on 31-03-2024.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Heramba Residency as on 31-03-2024.pdf18 Jun 2024
Other - LegalFile: hera.pdf8 Jan 2024
Other - LegalFile: 4 Other - Legal (1)_removed_removed.pdf22 Dec 2023
Other - LegalFile: 3 Other - Legal (1).pdf22 Dec 2023
Copy of the legal title reportFile: Flow_Chart_Heramba_23112023.pdf24 Nov 2023
Other - LegalFile: Trpartialte Agreement_11zon.pdf24 Nov 2023
Other - TechnicalFile: 2 Commencement Certificates _ NA Order for plotted development (9).pdf4 Nov 2023
Other - LegalFile: 6 (12).pdf3 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Screenshot 2023-10-23 160247.pdf2 Nov 2023
Layout approvalFile: CIDCO_BP-18460_TPO(NM K)_2023_1-1.pdf31 Oct 2023
Building plan approvalFile: CIDCO_BP-18460_TPO(NM K)_2023_2-end.pdf31 Oct 2023
Copy of Layout Approval (in case of layout)File: CIDCO_BP-18460_TPO(NM K)_2023_1-1.pdf31 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: CIDCO_BP-18460_TPO(NM K)_2023_2-end.pdf31 Oct 2023
PAN CardFile: pancard .pdf26 Oct 2023
Copy of the legal title reportFile: Short Title_Herambh_AB Constructions_23112023_compressed.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance -Finance.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance --Legal.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance -Finance.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance --Legal.pdf26 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Oct 2023
Declaration about Commencement CertificateFile: Format D -Heramba.pdf26 Oct 2023
Declaration in FORM BFile: Promoter Form B -Heramba Residency.pdf26 Oct 2023
CERSAI detailsFile: Cersai Declaration -Heramba.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (6).pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexures -A-2.pdf26 Oct 2023

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Heramba Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pushpak Node -Panvel5,900+ in Raigarh

2 kmHeramba ResidencyCompleted 187Lapsed / revoked 51Other 124Dot size: filed unitsN

Filed coordinates, straight-line distance. 362 registered projects within 2 km.

Builder: Bishwamitra Rampravesh Sah

Bishwamitra Rampravesh Sah has 2 registrations on MahaRERA, including MORYA NIWAS and Heramba Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Heramba Residency is delayed beyond 5 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Heramba Residency?

The registered promoter entity is Bishwamitra Rampravesh Sah, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Heramba Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Heramba Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Heramba Residency?

The professionals named in the filing: Architect: amit n. patil architects and planners; Engineer: S K Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Heramba Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Heramba Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Heramba Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.