Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HEERA CITY is a Residential / Group Housing project by AGRAWAL INFRA in Aurangabad, Maharashtra, registered with MahaRERA as P51500028407 on 2 Mar 2021. The registration is recorded completed; possession was promised by 28 Aug 2024.
At a glance
Project
- NameHEERA CITY
- TypeResidential / Group Housing
- Location
- warud Kazi Road
- Gangapur Jahangir
- Gangapur Jahagir
- Aurangabad
- 431007
- Pincode431007
- RERA no.P51500028407
- ReraGenie IDRG-MH-78644
Builder
- NameAGRAWAL INFRA
- Entity typePartnership
- PartnersRuchi Ashish Agrawal, Hardik Bhikchand Agrawal
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Mar 2021
- Promised completion28 Aug 2024
- Revised completionNone
- Buildings2 building records
- Documents filed108 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HEERA CITY | NA | 2 | 0 | 0 | 0 | 0 |
| HEERA CITY | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
HEERA CITY82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
HEERA CITY82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Piyush Sunil Bhavsar |
| Engineer | Izhar Ahmed |
| Engineer | Ravikumar Kavrani |
| Chartered Accountant | Uday S Bakliwal |
| Chartered Accountant | Narendra Navandar |
| Chartered Accountant | Sachin Lathi |
| Partner | Role in project |
|---|---|
| AGRAWAL INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Oct 2024
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form no 5- Agrawal Infra_0001.pdf | 27 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2024_0001.pdf | 26 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-06-2024_0001.pdf | 26 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-09-2024_0001.pdf | 26 Nov 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Heera City Association lettar.pdf | 25 Nov 2024 |
| Status of ConveyanceFile: Deed of Declaration Correction.pdf | 25 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 (2).PDF | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_07-10-2024.PDF | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 07-10-2024.PDF | 28 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY CERTIFICATE.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory30-09-2024.PDF | 28 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_07-10-2024.PDF | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 14 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF | 14 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.PDF | 14 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.PDF | 14 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13_Form 1_02-04-2024.PDF | 11 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13_Form 2_02-04-2024.PDF | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 13_Form 2A_02-04-2024.PDF | 11 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 14_Sold-Booked Inventory_31-3-2024.PDF | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_March 2021.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_June 2021.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_Sept 2021.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 4_Form 2A_06-01-2022.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 5_Form 2A_07-04-2022.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 6_Form 2A_04-07-2022.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 7_Form 2A_05-10-2022.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 8_Form 2A_07-01-2023.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 9_Form 2A_07-04-2023.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 10_Form 2A_06-10-2023.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 11_Form 2A_06-01-2024.PDF | 28 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 12_Form 2A_07-07-2023.PDF | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 3_Sold-Booked Invntory_30-06-2021.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 4_Sold-Booked Invntory_30-09-2021.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Sold-Booked Invntory_31-12-2021.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Sold-Booked Invntory_31-03-2022.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 7_Sold-Booked Invntory_30-06-2022.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 8_Sold-Booked Invntory_30-09-2022.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 9_Sold-Booked Invntory_31-12-2022.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 10_Sold-Booked Invntory_31-03-2023.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 11_Sold-Booked Invntory_30-06-2023.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 12_Sold-Booked Invntory_30-09-2023.PDF | 23 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 13_Sold-Booked Invntory_31-12-2023.PDF | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2021_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-06-2021_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-09-2021_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-12-2021_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2022_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-06-2022_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-09-2022_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-12-2022_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2023_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-06-2023_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-09-2023_0001.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-12-2023_0001.pdf | 23 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form -5 Agrawal Infra 2020 to2021.pdf | 23 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5 Agrawal Infra 2021 to 2022_0001.pdf | 23 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 Agrawal Infra 2022 to 2023__0001.pdf | 23 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5 Agrawal Infra 2021 to 2022__0001.pdf | 23 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1_04-04-2021.pdf | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_Form 1_06-07-2021.pdf | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_Form 1_04-10-2021.pdf | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_Form 1_05-01-2022.PDF | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5_Form 1_31-03-2022.PDF | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6_Form 1_06-07-2022.PDF | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7_Form 1_06-10-2022.PDF | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8_Form 1_06-01-2023.PDF | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9_Form 1_06-04-2023.PDF | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10_Form 1_05-07-2023.PDF | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11_Form 1_06-10-2023.PDF | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12_Form 1_06-01-2024.PDF | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_Form 2_04-04-2021.pdf | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2_06-07-2021.pdf | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_Form 2_04-10-2021.pdf | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_Form 2_05-01-2022.PDF | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_Form 2_03-04-2022.PDF | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6_Form 2_06-07-2022.PDF | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7_Form 2_06-10-2022.PDF | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8_Form 2_06-01-2023.PDF | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9_Form 2_06-04-2023.PDF | 21 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 108 filed documents as one ZIP, foldered, with a manifest
Keep HEERA CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Gangapur Jahangir1,400+ in Aurangabad
PMAY U Sundarwadi 10
Aurathrone Infra
PMAY U Sundarwadi 9
Aurathrone Infra
SECTOR 41
MANISH RAMNIRANJAN AGRAWAL AND AMITABH CHA
AURA SQUARE - KALYAN HEIGHTS
KALYAN HEIGHTS
URBAN AMBITION
MANISH RAMNIRANJAN AGRAWAL
Hrim Ssky City Phase V
Ashok Baheti
See every Aurangabad project, with the district possession charts
Builder: AGRAWAL INFRA
AGRAWAL INFRA has 1 registration on MahaRERA, including HEERA CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if HEERA CITY is delayed beyond 28 Aug 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HEERA CITY?
The registered promoter entity is AGRAWAL INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HEERA CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HEERA CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HEERA CITY?
The professionals named in the filing: Architect: Piyush Sunil Bhavsar; Engineer: Izhar Ahmed; Engineer: Ravikumar Kavrani; Chartered Accountant: Uday S Bakliwal; Chartered Accountant: Narendra Navandar; Chartered Accountant: Sachin Lathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HEERA CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback