Completed No litigation declared Residential / Group Housing project

HEERA CITY

By AGRAWAL INFRA

RG-MH-78644 · RERA P51500028407 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Aug 2024Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

HEERA CITY is a Residential / Group Housing project by AGRAWAL INFRA in Aurangabad, Maharashtra, registered with MahaRERA as P51500028407 on 2 Mar 2021. The registration is recorded completed; possession was promised by 28 Aug 2024.

At a glance

Project

  • NameHEERA CITY
  • TypeResidential / Group Housing
  • Location
    • warud Kazi Road
    • Gangapur Jahangir
    • Gangapur Jahagir
    • Aurangabad
    • 431007
  • Pincode431007
  • RERA no.P51500028407
  • ReraGenie IDRG-MH-78644

Builder

  • NameAGRAWAL INFRA
  • Entity typePartnership
  • PartnersRuchi Ashish Agrawal, Hardik Bhikchand Agrawal

Key dates

this monthRegisteredMar 2021PromisedAug 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Mar 2021
  • Promised completion28 Aug 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed108 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HEERA CITYNA20000
HEERA CITYNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

HEERA CITY82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
HEERA CITY82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area867 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2024

Approvals and building plan

Permissible FSI867.0
Proposed, not sanctioned867 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAkashwani Chowk, Jalna Road, Aurangabad

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPiyush Sunil Bhavsar
EngineerIzhar Ahmed
EngineerRavikumar Kavrani
Chartered AccountantUday S Bakliwal
Chartered AccountantNarendra Navandar
Chartered AccountantSachin Lathi
PartnerRole in project
AGRAWAL INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Oct 2024

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form no 5- Agrawal Infra_0001.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2024_0001.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-06-2024_0001.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-09-2024_0001.pdf26 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Heera City Association lettar.pdf25 Nov 2024
Status of ConveyanceFile: Deed of Declaration Correction.pdf25 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 (2).PDF7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_07-10-2024.PDF28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 07-10-2024.PDF28 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY CERTIFICATE.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory30-09-2024.PDF28 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_07-10-2024.PDF28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF14 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF14 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.PDF14 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.PDF14 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13_Form 1_02-04-2024.PDF11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13_Form 2_02-04-2024.PDF11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 13_Form 2A_02-04-2024.PDF11 Apr 2024
Disclosure of sold/ booked inventoryFile: 14_Sold-Booked Inventory_31-3-2024.PDF11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_March 2021.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_June 2021.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_Sept 2021.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 4_Form 2A_06-01-2022.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 5_Form 2A_07-04-2022.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 6_Form 2A_04-07-2022.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 7_Form 2A_05-10-2022.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 8_Form 2A_07-01-2023.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 9_Form 2A_07-04-2023.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 10_Form 2A_06-10-2023.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 11_Form 2A_06-01-2024.PDF28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 12_Form 2A_07-07-2023.PDF28 Mar 2024
Disclosure of sold/ booked inventoryFile: 3_Sold-Booked Invntory_30-06-2021.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 4_Sold-Booked Invntory_30-09-2021.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 5_Sold-Booked Invntory_31-12-2021.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 6_Sold-Booked Invntory_31-03-2022.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 7_Sold-Booked Invntory_30-06-2022.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 8_Sold-Booked Invntory_30-09-2022.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 9_Sold-Booked Invntory_31-12-2022.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 10_Sold-Booked Invntory_31-03-2023.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 11_Sold-Booked Invntory_30-06-2023.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 12_Sold-Booked Invntory_30-09-2023.PDF23 Mar 2024
Disclosure of sold/ booked inventoryFile: 13_Sold-Booked Invntory_31-12-2023.PDF23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2021_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-06-2021_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-09-2021_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-12-2021_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2022_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-06-2022_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-09-2022_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-12-2022_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2023_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-06-2023_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-30-09-2023_0001.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-12-2023_0001.pdf23 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form -5 Agrawal Infra 2020 to2021.pdf23 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5 Agrawal Infra 2021 to 2022_0001.pdf23 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 Agrawal Infra 2022 to 2023__0001.pdf23 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5 Agrawal Infra 2021 to 2022__0001.pdf23 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1_04-04-2021.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_Form 1_06-07-2021.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_Form 1_04-10-2021.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_Form 1_05-01-2022.PDF21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5_Form 1_31-03-2022.PDF21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6_Form 1_06-07-2022.PDF21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7_Form 1_06-10-2022.PDF21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8_Form 1_06-01-2023.PDF21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9_Form 1_06-04-2023.PDF21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10_Form 1_05-07-2023.PDF21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11_Form 1_06-10-2023.PDF21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12_Form 1_06-01-2024.PDF21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_Form 2_04-04-2021.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2_06-07-2021.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_Form 2_04-10-2021.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_Form 2_05-01-2022.PDF21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_Form 2_03-04-2022.PDF21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6_Form 2_06-07-2022.PDF21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7_Form 2_06-10-2022.PDF21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8_Form 2_06-01-2023.PDF21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9_Form 2_06-04-2023.PDF21 Mar 2024

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep HEERA CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gangapur Jahangir1,400+ in Aurangabad

Builder: AGRAWAL INFRA

AGRAWAL INFRA has 1 registration on MahaRERA, including HEERA CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if HEERA CITY is delayed beyond 28 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HEERA CITY?

The registered promoter entity is AGRAWAL INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HEERA CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HEERA CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HEERA CITY?

The professionals named in the filing: Architect: Piyush Sunil Bhavsar; Engineer: Izhar Ahmed; Engineer: Ravikumar Kavrani; Chartered Accountant: Uday S Bakliwal; Chartered Accountant: Narendra Navandar; Chartered Accountant: Sachin Lathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HEERA CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HEERA CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HEERA CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.