Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 25 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Heaven Galaxy is a Residential / Group Housing project by Altaf Abdulhamid Shaikh in Solapur, Maharashtra, registered with MahaRERA as P52600029431 on 29 May 2021. Possession was promised by 1 Jun 2025 and is now 16 months past that date. The completion date has moved by 25 months from the original filing. 18 of the 45 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameHeaven Galaxy
- TypeResidential / Group Housing
- Location
- street
- locality
- Solapur (M Corp.)
- Solapur North
- Solapur
- 413002
- Pincode413002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600029431
- ReraGenie IDRG-MH-21430
Builder
- NameAltaf Abdulhamid Shaikh
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 May 2021
- Promised completion1 Jun 2025
- Revised completionRevised to 1 Jun 2025 (originally 1 May 2023)
- Buildings1 building record
- Documents filed118 files
Current status
Figures as on 18 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Heaven Galaxy | NA | 8 | 8 | 8 | 37 | 45 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 15%.
Heaven Galaxy: 29% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hrushikesh Kulkarni |
| Engineer | Imaad Altaf Shaikh |
| Chartered Accountant | Aditya Kondale |
| Partner | Role in project |
|---|---|
| Altaf Abdulhamid Shaikh | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterApplied for extension
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501920 | Sagir Valsangkar | Altaf Abdulhamid Shaikh | 12/06/2025 |
| CC12502769 | Saleha Begum Md Irfan Hiroli | Altaf Abdulhamid Shaikh | 06/08/2025 |
| CC12503834 | Nusrat Sultana Daccani | Altaf Abdulhamid Shaikh | 01/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 May 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 May 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 May 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 1File: Arch.pdf | 18 Nov 2025 |
| Form 2File: Eng.pdf | 18 Nov 2025 |
| Form 3File: Form 3 Heaven Galaxy.pdf | 18 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 18 Nov 2025 |
| Form 2A (FY 2021-2022)File: Form 2A 2122.pdf | 18 Nov 2025 |
| Form 2A (FY 2022-2023)File: Form 2A 2223.pdf | 18 Nov 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 2324.pdf | 18 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 2425.pdf | 18 Nov 2025 |
| Form 2A (FY 2025-2026)File: Form 2A 2526.pdf | 18 Nov 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Promoter Letterhead Heaven Galaxy.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Q123.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Q223.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Q323.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Q423.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Q124.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Q224.pdf | 4 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Heaven Galaxy on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near locality550+ in Solapur
SAMRUDDHI PARKWAY
NAGNATH SHIVSHANKAR AKKALKOTE
Tirumala Paradise
Sachin Vitthal Ghanate
Gokul Vihar
Aakruti Builders
Madhuban Paradise Part-II
Madhuri Lature
SUYOG SHRUSHTI PHASE 2
SUYOG DEVELOPERS
Radha Garden
Sudhir Patil
See every Solapur project, with the district possession charts
Builder: Altaf Abdulhamid Shaikh
Altaf Abdulhamid Shaikh has 1 registration on MahaRERA, including Heaven Galaxy. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What does it mean that Heaven Galaxy shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Heaven Galaxy is delayed beyond 1 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Heaven Galaxy?
The registered promoter entity is Altaf Abdulhamid Shaikh, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Heaven Galaxy?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Heaven Galaxy?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Heaven Galaxy?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Heaven Galaxy?
The professionals named in the filing: Architect: Hrushikesh Kulkarni; Engineer: Imaad Altaf Shaikh; Chartered Accountant: Aditya Kondale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Heaven Galaxy?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback