Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 AND 3 is a Residential / Group Housing project by HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500077264 on 31 Jul 2024. Possession is promised by 31 Dec 2034. 0 of the 1 unit on this registration is recorded sold or booked, and 6 of 33 construction stages are filed complete.
At a glance
Project
- NameHARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 AND 3
- TypeResidential / Group Housing
- Location
- ZARI
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500077264
- ReraGenie IDRG-MH-71900
Builder
- NameHARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED
- Entity typeCompany
- CINU45400MH2007PLC176371
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorsMANISH ARVIND BADIYANI, AMIT ARVIND BADIYANI, ARVIND HARIDAS BADIYANI
- Other registrations4 more →
- Completed1 of 5
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jul 2024
- Promised completion31 Dec 2034
- Revised completionNone
- Buildings3 building records
- Documents filed72 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HARIHAR NAGAR ZARI PHASE II BUILDING 1 MAHADEO | NA | 0 | 0 | 1 | 0 | 1 |
| HARIHAR NAGAR ZARI PHASE II BUILDING NO 2 SOHAM | NA | 0 | 0 | 0 | 0 | 0 |
| HARIHAR NAGAR ZARI PHASE II BUILDING NO 3 KAILASH | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 9%.
HARIHAR NAGAR ZARI PHASE II BUILDING 1 MAHADEO19%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 9% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 4% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HARIHAR NAGAR ZARI PHASE II BUILDING NO 2 SOHAM19%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 9% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 4% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HARIHAR NAGAR ZARI PHASE II BUILDING NO 3 KAILASH19%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 9% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 4% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| HARIHAR NAGAR ZARI PHASE II BUILDING 1 MAHADEO | NA | Rs 81.12 cr | Rs 6.65 cr |
| HARIHAR NAGAR ZARI PHASE II BUILDING NO 2 SOHAM | NA | Rs 81.12 cr | Rs 6.65 cr |
| HARIHAR NAGAR ZARI PHASE II BUILDING NO 3 KAILASH | NA | Rs 81.12 cr | Rs 6.65 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANANT RAOLE |
| Architect | ADITYASINGH GAHARWAR |
| Engineer | RAHUL YELEKAR |
| Chartered Accountant | SAJJAD RASUL |
| Chartered Accountant | Sanjay Lalwani |
| Chartered Accountant | Ashishkumar Khapekar |
| Partner | Role in project |
|---|---|
| HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2034
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1 | 15 Jul 2026 |
| Withdrawal Update Form 1File: Form1HNZPHIIBUILD123.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2 | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form2HNZPHIIBUILD123.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3 | 15 Jul 2026 |
| Withdrawal Update Form 3File: Form3HNZPHIIBUILD123_compressed.pdf | 15 Jul 2026 |
| Form 2A (FY 2025-2026)File: HNZPHIIBLD123Form 2AApr 2026.pdf | 28 May 2026 |
| Form 5 (FY 2024-2025)File: Form 5HNZPH IIBuilding 123upto Sept2025.pdf | 28 May 2026 |
| Form 2A (FY 2024-2025)File: Form 2A HNZPHIIBuild 123_04042025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: HNZPHIIBLD123_Form 1_Apr 2026.pdf | 14 Apr 2026 |
| Withdrawal Update Form 2File: HNZPHIIBLD123_Form 2_Apr 2026.pdf | 14 Apr 2026 |
| Withdrawal Update Form 3File: HNZPHIIBLD123_Form 3_Apr 2026_compressed.pdf | 14 Apr 2026 |
| Withdrawal Update Form 1File: Form1HNZPHIIBuild123upto Dec2025.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Form1HNZPHIIBuild123upto Dec2025.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: Form2HNZPHIIBUILD123UPTODEC2025.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: Form2HNZPHIIBUILD123UPTODEC2025.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: FORM3HNZPHIIBUILD123UPTODEC2025_compressed.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: FORM3HNZPHIIBUILD123UPTODEC2025_compressed.pdf | 19 Jan 2026 |
| Form 1File: HNZPHIIBLD123FORM1_uptoJune25.pdf | 4 Dec 2025 |
| Form 2File: HNZPHIIBLD123FORM2_uptoJune25.pdf | 4 Dec 2025 |
| Form 3File: HNZPHIIBLD123FORM3_uptoJune25.pdf | 4 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: HNZPHIIBLD123FORM3_uptoJune25-5-6.pdf | 4 Dec 2025 |
| Form 1File: Form 1_HNZPH II_Building 123_upto Sept2025.pdf | 4 Dec 2025 |
| Form 2File: Form 2_HNZPH II_Building 123_upto Sept2025.pdf | 4 Dec 2025 |
| Form 3File: Form 3_HNZPH II_Building 123_upto Sept2025_compressed (1).pdf | 4 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3_HNZPH II_Building 123_upto Sept2025-5-17_compressed.pdf | 4 Dec 2025 |
| Form 1File: Form 1 HNZPHIIBUILD123_04042025.pdf | 5 Aug 2025 |
| Form 2File: Form 2 HNZPHIIBuild123_04042025.pdf | 5 Aug 2025 |
| Form 3File: Form 3 _HNZ Ph II_ Building 123_08042025.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Harihar Nagar Zari Phase II Sold Unsold Inventory.pdf | 5 Aug 2025 |
| Form 1File: Form 1_HNZPHASEIIBuild123_10102024_compressed.pdf | 5 Aug 2025 |
| Form 2File: Form2_HNZPHIIBuild123_10102024_compressed.pdf | 5 Aug 2025 |
| Form 3File: Form3_HNZPHIIBuild123_upto30092024_compressed (1).pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Harihar Nagar Zari Phase II Sold Unsold Inventory.pdf | 5 Aug 2025 |
| Form 1File: Form 1_HNZPHASEIIBuild123_10012025_compressed.pdf | 5 Aug 2025 |
| Form 2File: Form2_HNZPHIIBuild123_10012025_compressed.pdf | 5 Aug 2025 |
| Form 3File: Form3_HNZPHIIBuild123_upto31122024_compressed (1).pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Harihar Nagar Zari Phase II Sold Unsold Inventory.pdf | 5 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 HNZPHIIBUILD123.pdf | 12 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _HNZ Ph II_ Building 123_compressed.pdf | 12 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A HNZPHIIBuild 123.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_HNZPHASEIIBuild123_UptoSept2024_compressed.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_HNZPHASEIIBuild123_Jan2025_compressed.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_HNZPHIIBuild123_upto30092024_compressed.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_HNZPHIIBuild123_upto31122024_compressed.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_HNZPHIIBuild123_upto30092024.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_HNZPHIIBuild123_upto31122024.pdf | 18 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: 1 Proforma of Allotment letter (1).pdf | 18 Feb 2025 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (1) (1).pdf | 18 Feb 2025 |
| Declaration in FORM BFile: FORM B DECLARATION_Zari Phase II_compressed.pdf | 26 Jul 2024 |
| Other - TechnicalFile: Declaration cum undertaking.pdf | 24 Jul 2024 |
| Layout approvalFile: Zari Mhada Sanction plan 28092022_converted_Optimized.pdf | 16 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Zari Mhada Sanction plan 28092022_converted_Optimized.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 _Changes.pdf | 8 Jul 2024 |
| Declaration about Commencement CertificateFile: Declaration on Commencement Certificate.pdf | 12 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Adobe Scan 11-Dec-2023.pdf | 11 Dec 2023 |
| Building plan approvalFile: File 2.pdf | 29 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: File 2.pdf | 29 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrances_compressed.pdf | 28 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrances_compressed.pdf | 28 Mar 2023 |
| Copy of the legal title reportFile: new search report advocate_1 MB.pdf | 17 Mar 2023 |
| PAN CardFile: 1 PAN Card.pdf | 11 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Financial Encumbrances_compressed.pdf | 11 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Financial Encumbrances_compressed.pdf | 11 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 11 Mar 2023 |
| CERSAI detailsFile: Undertaking Cersai_compressed.pdf | 11 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: REAL ESTATE_EDITED.pdf | 11 Mar 2023 |
| Proforma of Agreement for saleFile: Final Rera Agreement For Sale_Changes done_compressed.pdf | 11 Mar 2023 |
| Proforma of Allotment letterFile: Maha Rera Allotment Letter_Comibined_compressed.pdf | 11 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A 3 bldg together.pdf | 11 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Certificate No Deviations.pdf | 11 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Agreement for Sale Deviation_merged.pdf | 11 Mar 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHANTI HEIGHTS BESA | AT POST BESA NAGPUR | 76 | Completed | Dec 2010 | Dec 2010 |
| SHANTI PARK BESA | AT POST BESA | - | Completed | Mar 2007 | Mar 2007 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ZARI2,800+ in Nagpur
Filed coordinates, straight-line distance. 68 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED
HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED has 5 registrations on MahaRERA, including HARIHAR NAGAR ZARI PHASE - I and GOKULPARK TOWER NO 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if HARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 AND 3 is delayed beyond 31 Dec 2034?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 AND 3?
The registered promoter entity is HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED, a company as per the filing. Its CIN U45400MH2007PLC176371 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 AND 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 AND 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 AND 3?
The professionals named in the filing: Architect: ANANT RAOLE; Architect: ADITYASINGH GAHARWAR; Engineer: RAHUL YELEKAR; Chartered Accountant: SAJJAD RASUL; Chartered Accountant: Sanjay Lalwani; Chartered Accountant: Ashishkumar Khapekar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HARIHAR NAGAR ZARI PHASE II BUILDING NO 1 2 AND 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback