Haridwar Siddh
RG-MH-24601 · RERA P99000004713 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 66 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Haridwar Siddh is a Mixed project by Haridwar Corp in Palghar, Maharashtra, registered with MahaRERA as P99000004713 on 9 Aug 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 66 months from the original filing. 34 of the 99 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameHaridwar Siddh
- TypeMixed
- Location
- Dongre
- Virar West
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401303
- Pincode401303
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000004713
- ReraGenie IDRG-MH-24601
Builder
- NameHaridwar Corp
- Entity typePartnership
- PartnersDhananjay Lalbahadur Gupta, GIirish Brijmohan Sharma, Surendra Jaya Shetty, Avinash Parashram Madane, Mamtha Bhaskar Poojari, Navinkumar Subhash Chorghe, Anuradha Venkatavaradhan Iyengar, Deu Dayanand Bane
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Aug 2017
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed86 files
Current status
Figures as on 14 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Haridwar Siddh | NA | 17 | 16 | 88 | 10 | 98 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.
Haridwar Siddh88%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUV Developers | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Haridwar Siddh | NA | Rs 10.20 cr | Rs 10.05 cr |
| - | NA | Rs 1.00 cr | Rs 85.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ajay Wade |
| Engineer | SUNIL APTE |
| Engineer | Siddhesh M gawade |
| Chartered Accountant | PALLAVI P BARAPATRE |
| Chartered Accountant | CHRYSTAL MARTIN |
| Partner | Role in project |
|---|---|
| Haridwar Corp | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject completion has been delayed due to the lockdown and the presnt ongoing pandemic and the shortage of workers. Therefore, request to extent the project completion date still 30/06/2022
Reason as filed by the promoterWe would like to inform that due to Covod-19 pandemic, frequent lock down and non favorable factors likes slowdown in real estate activities, shortage of building materials and shortage of skilled manpower construction of project were largely affected and project was not able to complete in time. And we expect some more delay in completion of project. We have completed 80% work of project. So we request you to extend the project completion date upto 30/12/2025.
Reason as filed by the promoterWe have completed 98% of project work and are in the process of 100% completion and in the process of applying to VVCMC for Occupancy Certificate.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000110905 | Mr.Sohan B Gupta | M/S.Haridwar Corporation, through its partner Mr.Ganesh Hire and others | 21/09/2019 |
| CC006000000199265 | Raju G. Sitlani & Divya Raju Sitlani | Haridwar Corp | 04/12/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jun 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form1 H Siddh QRTR 4.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 H Siddh QRTR 4.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 H siddh QRTR 4.pdf | 14 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A H Siddh 2025-26.pdf | 14 Jul 2026 |
| Form 5 (FY 2025-2026)File: Form 5 H Siddh 20025-26.pdf | 14 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Siddh QRTR 3.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: Form 2 Siddh Qrtr 3.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: Form 3 Siddh QRTR 3_compressed.pdf | 25 May 2026 |
| Withdrawal Update Form 1File: FORM 1 SIDDH QRTR 2.pdf | 13 May 2026 |
| Withdrawal Update Form 2File: Form 2 Haridwar siddh 2nd QRTR.pdf | 13 May 2026 |
| Withdrawal Update Form 3File: Form 3 H Siddh 2nd QRTR.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: FORM 1 SIDDH QRTR 2.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Haridwar siddh 2nd QRTR.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 H Siddh 2nd QRTR.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 SIDDH QRTR 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 SIDDH QRTR 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Haridwar siddh 2nd QRTR.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Haridwar siddh 2nd QRTR.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 Haridwar siddh 1st QRTR.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 Haridwar siddh 1st QRTR.pdf | 12 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Haridwar siddh 2024-25.pdf | 17 Jan 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A Haridwae siddh 2024-25.pdf | 7 Jan 2026 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hairdwar siddh June 2024.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Haridwar siddh September 2024.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Haridwar siddh December 2024.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024 Hardwar SIddh_compressed.pdf | 26 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 September 2024 Haridwar Siddh.pdf | 26 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2024 Haridwar siddh_compressed.pdf | 26 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 siddh_compressed.pdf | 14 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Haridwar corp.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SIDDH.pdf | 4 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 siddh.pdf | 1 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Haridwar siddh_compressed.pdf | 26 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SIDDH.pdf | 12 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Haridwar siddh.pdf | 10 May 2023 |
| Certificates of CA (Form 3)File: Form 3 Haridwar Siddh.pdf | 10 May 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 9 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A siddh.pdf | 9 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Siddh.pdf | 9 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE LEGAL SIDDH.pdf | 3 Mar 2023 |
| Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE LEGAL SIDDH.pdf | 3 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Siddh.pdf | 3 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2021-22 SIDDH.pdf | 3 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: sold inventory siddh.pdf | 3 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22 siddh.pdf | 3 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank dtls haridwar siddh.pdf | 3 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Non deviation allotment siddh.pdf | 3 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Non deviation AFS.pdf | 3 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200256573621_For_Asset_Based_Search_02_01_2023_18_58_09_313.pdf | 20 Feb 2023 |
| Proforma of Agreement for saleFile: AFS HARIDWAR SIDDH OLD.pdf | 20 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A June 2019.pdf | 24 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Sep 2019.pdf | 24 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Dec 2019.pdf | 24 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A March 2020.pdf | 24 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A June 2020.pdf | 24 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 CA 2017-18 SIDDH.pdf | 24 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 CA 2018-19 SIDDH.pdf | 24 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 CA 2019-20 SIDDH.pdf | 24 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: RERA SIDDH SALES DETAILS.pdf | 20 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 CA 2019-20 SIDDH.pdf | 20 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 CA 2020-21 SIDDH.pdf | 20 Jun 2021 |
| Declaration about Commencement CertificateFile: RERA SIDHH CC DCLRTN final.pdf | 19 Jun 2021 |
| Layout approvalFile: RERA SIDDH LAYOUT.pdf | 17 Jun 2021 |
| Building plan approval or NA orderFile: RERA SIDDH BLUPRINT.pdf | 17 Jun 2021 |
| Building plan approval or NA orderFile: RERA SIDDH PLAN.pdf | 17 Jun 2021 |
| PAN CardFile: HARIDWAR CORP PANCARD.pdf | 17 Jun 2021 |
| Copy of the legal title reportFile: RERA SIDDH TITLE CUM DVLPMNT FINAL.pdf | 17 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: RERA SIDDH LAYOUT.pdf | 17 Jun 2021 |
| Building Plan Approval (IOD)File: RERA SIDDH BLUPRINT.pdf | 17 Jun 2021 |
| Building Plan Approval (IOD)File: RERA SIDDH PLAN.pdf | 17 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: RERA SIDDH CC FINAL.pdf | 17 Jun 2021 |
| Building plan approval or NA orderFile: Haridwar CC RDP- 2014-2015.pdf | 28 Jul 2017 |
| Layout approvalFile: Haridwar CC RDP- 2014-2015.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Form B Promoter 1.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Haridwar CC RDP- 2014-2015.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Haridwar CC RDP- 2014-2015.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: Form B Promoter 1.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: Form B Co Promoter.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: RERA Agreement For Sale Draft.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: RERA Booking Letter.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Haridwar Siddh on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Virar West3,200+ in Palghar
Filed coordinates, straight-line distance. 33 registered projects within 2 km.
Mayfair Virar Gardens Cluster-VI
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS CLUSTER IV
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19,
MAYFAIR HOUSING
Agarwal Infinity
Laxminarayan Prabhudayal Agarwal
GOKUL HARI ANANTA
Mehta Ventures
GOKUL NAKSHATRA II
JSB HOMEMAKERS PRIVATE LIMITED
See every Palghar project, with the district possession charts
Builder: Haridwar Corp
Haridwar Corp has 1 registration on MahaRERA, including Haridwar Siddh. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Haridwar Siddh is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Haridwar Siddh?
The registered promoter entity is Haridwar Corp, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Haridwar Siddh?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Haridwar Siddh?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Haridwar Siddh?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Haridwar Siddh?
The professionals named in the filing: Architect: Ajay Wade; Engineer: SUNIL APTE; Engineer: Siddhesh M gawade; Chartered Accountant: PALLAVI P BARAPATRE; Chartered Accountant: CHRYSTAL MARTIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Haridwar Siddh?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback