Home / Browse projects / Raigarh, Maharashtra / HARI VITTHAL COMPLEX 1
HARI VITTHAL COMPLEX 1
RG-MH-07083 · RERA P52000054145 · Last updated on MahaRERA portal: 13 Jun 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HARI VITTHAL COMPLEX 1 is a Residential / Group Housing project by NAGESH ANNASAHEB SURVASE in Raigarh, Maharashtra, registered with MahaRERA as P52000054145 on 29 Dec 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 9 of the 21 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameHARI VITTHAL COMPLEX 1
- TypeResidential / Group Housing
- Location
- PLOR NO 135 SECTOR 03
- PUSHPAK NAGAR (DAPOLI)
- Dapoli
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000054145
- ReraGenie IDRG-MH-07083
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on29 Dec 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed55 files
Current status
Figures as on 13 Jun 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HARI VITTHAL COMPLEX 1 | NA | 7 | 7 | 18 | 3 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
HARI VITTHAL COMPLEX 1: 9% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| OM CIVIL CONSTRUCTIONS | Navi Mumbai (M Corp.) | Thane |
| SHRI NARAYAN NAMDEV ASVALE | Uran | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL ARCHITECTS |
| Engineer | VIJAY KUMAR SINGH |
| Chartered Accountant | MADANE AND ASSOCIATESS ROHIT KISAN MADANE |
| Chartered Accountant | SIDDHARTH SUSHILKUMAR BANSAL |
| Partner | Role in project |
|---|---|
| NAGESH ANNASAHEB SURVASE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 May 2025
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 135-3-PUSHPAK RERA (2025 MARCH).pdf | 13 Jun 2025 |
| Form 2File: form2, MARCH 2025.pdf | 13 Jun 2025 |
| Form 3File: Form 3_Hari Vitthal 1_March 25 FINAL.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure March 25.pdf | 13 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration Of Quarterly Progress March 2025.pdf | 13 Jun 2025 |
| Form 2A (FY 2023-2024)File: Form2A 23-24, 135-3.pdf | 23 May 2025 |
| Form 2A (FY 2024-2025)File: Form2A,24-25,135-3.pdf | 23 May 2025 |
| Form 1File: 135-3-PUSHPAK RERA (2023 DECEMBER).pdf | 21 May 2025 |
| Form 1File: 135-3-PUSHPAK RERA (2023 DECEMBER).pdf | 21 May 2025 |
| Form 2File: 135-3-PUSHPAK RERA (2024 MARCH).pdf | 21 May 2025 |
| Form 3File: form2 ,MARCH 2024.pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3_Hari Vitthal 1_December 23 FINAL.pdf | 21 May 2025 |
| Self-declaration of Quarterly ProgressFile: Inventory Disclosure March 24.pdf | 21 May 2025 |
| OthersFile: Self Declaration Of Quarterly Progress March 24.pdf | 21 May 2025 |
| Form 1File: form2 ,MARCH 2024.pdf | 21 May 2025 |
| Form 2File: 135-3-PUSHPAK RERA (2024 MARCH).pdf | 21 May 2025 |
| Form 3File: Self Declaration Of Quarterly Progress March 24.pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: 135-3-PUSHPAK RERA (2023 DECEMBER).pdf | 21 May 2025 |
| Self-declaration of Quarterly ProgressFile: Inventory Disclosure March 24.pdf | 21 May 2025 |
| Form 1File: Inventory Disclosure March 24.pdf | 21 May 2025 |
| Form 2File: form2 ,MARCH 2024.pdf | 21 May 2025 |
| Form 3File: 135-3-PUSHPAK RERA (2023 DECEMBER).pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Self Declaration Of Quarterly Progress March 24.pdf | 21 May 2025 |
| Self-declaration of Quarterly ProgressFile: 135-3-PUSHPAK RERA (2024 SEPTEMBER).pdf | 21 May 2025 |
| Form 1File: form2 ,MARCH 2024.pdf | 21 May 2025 |
| Form 2File: Inventory Disclosure March 24.pdf | 21 May 2025 |
| Form 3File: 135-3-PUSHPAK RERA (2024 SEPTEMBER).pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: 135-3-PUSHPAK RERA (2023 DECEMBER).pdf | 21 May 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration Of Quarterly Progress March 24.pdf | 21 May 2025 |
| Form 5 (FY 2023-2024)File: Hari Vitthal Complex 1 Form 5 FY 23 -24.pdf | 21 May 2025 |
| Form 5 (FY 2024-2025)File: Hari Vitthal Complex 1 Form 5 FY 24-25.pdf | 21 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Hari Vitthal Complex 1 OC.pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3.pdf | 22 Dec 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 2 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: encumrations.pdf | 2 Dec 2023 |
| Details of encumbrances concerned to LegalFile: encumrations.pdf | 2 Dec 2023 |
| Declaration in FORM BFile: Form B Owner.pdf | 2 Dec 2023 |
| CERSAI detailsFile: CERSAI CERTIFICATE.pdf | 2 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 2 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: DEVOTATAION ALLOTMENT LETTER.pdf | 2 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVOTATION AGREEMENT FOR SALE.pdf | 2 Dec 2023 |
| Layout approvalFile: CC DRG.pdf | 17 Nov 2023 |
| Building plan approvalFile: CC DRG.pdf | 17 Nov 2023 |
| PAN CardFile: adhar nagesh survashe.pdf | 17 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: encoumbrance finance.pdf | 17 Nov 2023 |
| Details of encumbrances concerned to LegalFile: encoumbrance finance.pdf | 17 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: CC DRG.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: CC DRG.pdf | 17 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: C C.pdf | 17 Nov 2023 |
| Declaration about Commencement CertificateFile: DECLERATION CC.pdf | 17 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf | 17 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf | 17 Nov 2023 |
| Proforma of Agreement for saleFile: Hari vittha l complex(1) AGREEMENT .pdf | 17 Nov 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER_compressed.pdf | 17 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETEIALS.pdf | 17 Nov 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| JAY VITTHAL COMPLEX | PLOT NO 299 SECTOR R-3 PUSHPAK NODE VADGHAR PANVEL 410206 | 1 | Completed | Aug 2019 | Late, Jan 2023 |
| UBHA VITEVARI | PLOT NO 97 SECTOR R-3 PUSHPAK NODE VADGHAR PANVEL 410206 | 1 | Completed | Apr 2019 | Late, Oct 2022 |
| RUKHMINI COMPLEX | PLOT NO 86C SECTOR R-3 PUSHPAK NODE VADGHAR PANVEL 410206 | 1 | Completed | Jan 2019 | Late, Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
Keep HARI VITTHAL COMPLEX 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUSHPAK NAGAR (DAPOLI)5,900+ in Raigarh
Filed coordinates, straight-line distance. 116 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: NAGESH ANNASAHEB SURVASE
NAGESH ANNASAHEB SURVASE has 2 registrations on MahaRERA, including HARI VITTHAL COMPLEX 1 and RUKHMINI COMPLEX 1. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if HARI VITTHAL COMPLEX 1 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HARI VITTHAL COMPLEX 1?
The registered promoter entity is NAGESH ANNASAHEB SURVASE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HARI VITTHAL COMPLEX 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HARI VITTHAL COMPLEX 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HARI VITTHAL COMPLEX 1?
The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: VIJAY KUMAR SINGH; Chartered Accountant: MADANE AND ASSOCIATESS ROHIT KISAN MADANE; Chartered Accountant: SIDDHARTH SUSHILKUMAR BANSAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HARI VITTHAL COMPLEX 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback